Real Substation Automation System. (R12). M e a s u re. - m e n t. C o n tro l. SCADA. Process Connection (Sensors and Actors). Power System. State Estimation.
A Real time development platform for next generation of power systems control functions Michael Kratz

Dirk Westermann

Power System Department Ilmenau University of Technology Gustav-Kirchhoff-St. 01, D-98693 Ilmenau [email protected]

Power System Department Ilmenau University of Technology Gustav-Kirchhoff-St. 01, D-98693 Ilmenau [email protected]

Abstract: A real time development platform for simulation studies of control and operation of next generation of power systems control functions is introduced. The platform covers all aspects of the challenges of future power systems requirements related to operation and control. In this paper the requirements of a simulation platform will be formulated. A laboratory setup with special attention to the utilization of real time simulation equipment and some typical reference applications will be described. Keywords: Real Time Simulation, SCADA, Control System,

quality. Fast Power system monitoring and regulation are hard real time operations, because their delay can cause power systems dynamic stabilitiy problems or failures in power system operation. All forecasts foresee that the utilization of the energy carrier electricity will increase. For example hybrid or full electric vehicles need to be charged. They will be mainly connected to the low voltage distribution network. Due to the high load current and non-deterministic charging state it is necessary to control all the connected energy storages by a central station with respect to the network resources and the particular needs of the customers.

Power Quality Monitoring, Power System Control & Operation, Information and Communication Technologies, Protocols, On the generation side the amount of photovoltaic schemes in the low and medium voltage networks is increasing due to governmental IEC61850, IEC60870-5-104, DNP3 subsidies and developing technologies with growing efficiency factor, while wind power is changing from a decentralized energy suppliers with mainly random behavior to centralized ones with I. INTRODUCTION more deterministic behavior, due to changing from an onshore to an It is well known that the modern power system is a large sophisti- offshore technology [1], [2]. cated technological entity which developed over decades. It has been designed in a time, when electricity was a minor energy source, not From a technological perspective all these developments will impact available for the entire society, but for special applications. Today the network operation and the development of products for end electrical energy covers a substantial part of the total energy con- customer development. The load characteristic may change towards sumption. Initially the electricity supply industry operates in a de- a capability to store electricity. With an increased amount of flucmand following way. This approach is appropriate as long as suffi- tuating energy infeed the ability of a centralized frequency control cient controllable generation capacity is available to meet the de- decreases. Power electronic based grid interconnections might have mand fluctuations. Until the 1990s nearly 100% of the electricity a negative impact on power quality but offer reactive power control came from central generation units. The power was fed into the high capabilities that must be properly used. In addition the power will voltage transmission network and then distributed through medium not only flow from the transmission network to the distribution and low voltage networks to the end customers. In fact, power sys- network. Power flow between different low voltage networks via the tems were organized in a hierarchical way [1], [2]. medium voltage level can occur as well [5]-[11]. The liberalization of the power market enabled access of small power units to the grid without discrimination. With unbundling the network and power generation control separated into different independent entities not keen to exchange business relevant information with respect to their operation. In particular in Germany, policies have been established to increase the amount of renewable or combined heat and power and to make the grid operators responsible for power quality or loss of supply. These are further forced by problems with respect to global warming, scarcity of fossil resources, efficiency and product quality. Real time pricing, advanced control of power flow, demand side management, non deterministic infeed, market driven operation between costs, risk and liability make more difficult the electric power network control. [1]-[4] Key to these new requirements and phenomena of the power system is the real time data provision and communication between the power system control and operation framework. Real time processing means that a system has fixed operation deadlines from event to system response. A system is working in hard real time, if its operation depends on both, the logic correctness and its performance time. Soft real time tolerates delay but operates with reduced service

New methods and system operation technologies have been developed. Based on the theory of “Microgrids” and “Intelligent Grids” several test facilities have been installed to design operating and control strategies. The information and communication technology has been identified as a key technology for all these new application cases. This results from an increased demand of monitoring and control. Some technologies for real time control, as Wide Area Monitoring Systems (WAMS) and Wide Area Control Systems (WACS), have been introduced some years ago. They are based on the commercially available Phasor Measurement Units (PMU). With PMU’s the power system can be monitored in real time. The magnitude and angle of the bus voltages and line currents can be measured almost with no time delay as operated by the conventional state estimation. In combination with a suitable communication backbone the power system can be monitored with a response time less than one minute [12]-[21]. However, this technology is most suitable for wide area monitoring and control applications. These systems are hard real time systems.

1

subtransient

steady state

In a conventional hierarchical power system the medium voltage Information and communication technologies (ICT) are normally grid has been designed for power distribution and to be fed from neglected when it comes to power system operation analysis. higher voltage levels, i.e. the transmission grid. The distribution grid has been designed to be passive without dedicated network control Protection, Control, Information and Communication instance or large amount of measuring devices. The microgridconcept becomes necessary if small generation units are interconload flow nected to the low voltage distribution system. Microgrids can be harmonics analysis connected to the main power network. It can be operated islanded in fault currents a coordinated way. Microgrids and the transmission grid will be fully monitored in different timescales, due to their special requiresmall signal stability ments (see Figure 1 and 2). Historically, information and communitransient stability cation technologies (i.e. automation technologies) have not been generator transients installed in medium voltage distribution networks to vast amount. power electronics But in the light of the new operational objectives it becomes even more important since typical transmission tasks have to be fulfilled switching operation in the future. 10-6

10-3

100

103

time [s]

LV

MV

HV

Figure 2: Overview of time ranges of power systems dynamics

HV

transformatio to observeable grid

In order to analyze and improve the ICT system of power systems the authors have developed a dedicated research platform that allows for various kinds of research with respect to ICT and power system control and operation. This platform covers all time phenomena of power system dynamics and is capable of simulating various kinds of network configurations and corresponding communication systems in real time. The proposed approach also allows for decoupled simulations for standalone power systems and/or communication systems. This paper outlines the basic requirements regarding such a platform. A comprehensive description of the architecture will be presented. After a general discussion of the laboratory setup example applications will be given.

LV

MV

II. REQUIREMENTS

Figure 1: Illustration of the expected development of the observability of power network (red parts are observed) (HV - high voltage, MV - mid voltage, LV - low voltage) Power system real time simulations are generally used in conjunction with external equipment, mostly built up as hardware in the loop application. Hardware in the loop simulations can be used for the design and evaluation of FACTS control and operation (FACTS, Flexible AC Transmission System). Another approach is to apply new mathematical models in order to speed up the entire simulation run. Real time simulations are used for highly complex analysis of the impact of power system devices (transformers, rotating machines, etc.). All these simulations focus on dedicated in-depth analysis of control loops with respect to their impact on the connected power network [22]-[39].

Power System Simulator The power system simulator has to match the following requirements: As standard for power system analysis the simulation has to be capable of subtransient and transient phenomena. Power electronic devices including harmonic analysis are necessary for a laboratory setup of an operation & control systems of grids including microgrid components and ICT systems. In this field a laboratory platform should allow for investigations of all phenomena that might dominate the operation of these networks. The environment should serve as test bed for higher optimization and decision functions for distribution grids including stability phenomena, grid islanding and power quality issues. The interest of large system analysis covers load flow analysis, integration of “renewable” and demand side management of loads or energy storages like hybrid or electric vehicles or domestic appliances with discontinuous load characteristic. In particular in the latter application area ICT becomes decisive for the simulation of multiple small load modifications in large systems. The entire system should allow for closed loop simulations including real ICT in order to study the impact of the entire secondary system on power system behavior.

With respect to the above mentioned power system developments and the corresponding improvements in system simulation it is of Communication System Simulation utmost importance to include the underlying information and communication system (operation framework) into network simulations. Due to the growing impact of communication systems the following requirements have to be met: The influence of the operation framework on power system security and stability will become decisive, if the amount of grid control 1) Use of standard protocols for communication, increases. Today’s concern regarding safety and security of commu2) IEC61850 support, nication network is based control loops in power systems. Quality of 3) DNPv3 or IEC61850-5-104 support, service of IP (Internet Protocol) based control (delay, bandwidth, 4) Support of ICCP, availability and so on) has not yet been investigated to a great extend because it is inherently assumed that this system is working fine. 2

Simulation of different communication channels (DSL, UMTS, Ethernet, etc.) for analyzing the impact of com- Table 1: Overview of Simulation Requirements munication quality parameters to the primary process.

If standard protocols are applied, any commercially available equipment can be integrated for special scenario simulation. Most modern protection devices support communication via IEC 61850. Today, the standard for distributed measurement values, status information and operation between substation automation and network control systems is based on TCP /IP via DNPv3 or IEC61850-5-104 (Figure 3).

Simulation Module

Requirements (R)

Power System

-

Communication System

7

Application Layer

6

Presentation Layer

5

Session Layer

4

Transport Layer

TCP/UDP

3

Network Layer

IP

2

Data Link Layer

1

Physical Layer

61850 60870-5-104 ICCP etc.

Control System

-

Transients and subtransients (R1) Harmonics (R2) Power electronics (R3) Large power systems (R4) Closed loop control & protection (R5) Standard communication protocols (R6) IEC61850 support (R7) DNPv3 or IEC61850-5-104 support (R8) Support of ICCP (R9) Simulation communication channels (R10) Real Network Control System (R11) Real Substation Automation System (R12) Power System

Control

Process Connection (Sensors and Actors)

Ethernet UMTS, GPRS etc.

Measurement

5)

Communication System

Figure 3: ISO/OSI model / Protocols SCADA

Network control centers can be connected via ICCP (Inter Control Center Communication Protocol) based on TCP/IP. This setup becomes more and more standard. For the sake of cost effectiveness, numerous distribution utilities even let operate their distribution network from remote locations by service providers.

Control System Simulation Due to the high amount of information processing systems the following requirements have to match: 6) 7)

Restoration Strategy

Network Analysis

Load Forecast

Optimal Load Flow

A change of the technology in layer 1 and 2, e.g. from Ethernet to wireless or UMTS only affects the TCP/IP support. Differences are expected in using a variety of communication channels (Layer 1 and 2). Those could be bandwidth, delay or package loss. Integration into the entire simulation framework allows for investigations of the impact of the communication system on the operational objectives of the power system.

Online Load Flow

TCP/IP has become the “de facto standard” for computer communication in today’s networks. It allows for the use of standard components to build up a communication layer. The TCP/IP stack is available for the most communication systems and can be embedded into other protocols.

State Estimation

Online Monitoring and Control Module

Figure 4: Generic function structure of power system control including the ICT systems

III. LABORATORY SETUP

Real Network Control System (SCADA), Real Substation Automation System.

Due to the complexity of power system simulation and the need to cover most of the phenomena it is necessary to use specialized simulation cores with dedicated algorithms depending on the simulation For a comprehensive laboratory environment a fully integrated requirements. The basic approach presented here is a hierarchical SCADA system is essential for real time operation and control of the complex hybrid simulator. This simulator comprises six different simulated power systems. components (Figure 5). With a closed-loop-simulation capability real-time modules could be tested and adapted to the process requirements during research activities (Figure 4). Table 1 gives an overview of the simulation requirements: 3

SCADA Workstation 1 Workstation 2

Substation Automation

ware represents a hardware in the loop application. This system meets requirements R4, R5, R6 and R8.

Network Control Center Network Control Center

Substation CS Network Simulator

Ethernet

Protection (61850)

Simulator A Simulator B

Software Simulator

RTDS

Workstation

Digital H/W Simulator

Physical Network Model Hybrid Simulator

Figure 5: Laboratory Setup

Physical Network Model

The network control center is based on standard hardware and software for system operation purposes. The system consists of redundant server hardware, two operator workstations with the ability to use world map projection of the network situation of the operator desktops (Figure 6). The design of the room has been adopted from real network control centers for small and medium size networks. With respect to real world requirements this layout is fundamental for ongoing research of psychological aspects in stressed situations of network operators.

ICT Network Simulator The information and communication system (CS) network simulator is used for the modification of variables in the communication layer between two connection points. All IP packages are routed through this system. Inside the communication channel values are defined, e.g. package loss or delay. The utilized system is the Wide Area Network Simulator (WANEM) [36].

With the “physical network model” in-depth power system simulations can be provided. It is equipped with physical switches, app. 900km of line equivalents built from concentrated elements, and other physical equipment. This simulator can be considered as analogue model of an electric power system. Advantages are the real time behavior and the absence of numerical model approximations. Due to the high complexity and degree of real hardware utilization this is limited in size and topology. It can be utilized for simulation of subtransient and transient phenomena or secondary equipment hardware testing.

Digital Hardware Simulator More flexible transient and subtransient simulations are feasible by using a Real Time Digital Simulator (RTDS). In the proposed laboratory setup a simulator from RTDS Technologies Ltd. has been installed [38]. Here, the entire system is modeled by means of software modules. This gives more flexibility in size and topology. The simulator is specified and designed to have maximum computing and communication capability. Real time means a power system simulation resolution up to 50µs, depending on the model complexity. The communication frontend supports IEC61850 and DNP3. This allows using the simulator as a standalone process simulation either for substation automation systems, utilizing IEC61850, or bypassing this part of the control system, utilizing DNP3 as a direct communication to the network control center. The simulator also allows direct measurement for connection of monitoring devices for protection, power quality or real time monitoring. The RTDS system meets requirements R1 to R8.

Figure 6: The network control center

IV. REFERENCE NETWORKS SCADA Control System To use full functionality of SCADA and network control systems, (e.g. fault detection, automatic fault location, manual or automatic trouble shooting or reporting), a process simulation in real time with bidirectional communication of measurement and control values based on standard protocols is needed. The setup of the simulation architecture is shown in figure 7.

Software Simulator The larger the system under investigation the “simpler” the model needs to be. Due to limited computing power this particularly applies to real time investigations. Both, the “Dynamic Network Model” and the RTDS, define the limit of power system representation with respect to system size. Since the available RTDS system has been designed to have three racks, large power systems with more than three times 54 nodes needs to be simulated by software modules based on Matlab/Simulink and open source toolboxes which are used for loadflow calculations and midterm dynamics. With a special software setup of a RTU (simRTU) the software modules communicate with the SCADA system. SimRTU is a Java based implementation of the IEC60870-5-104 protocol for Matlab/Simulink. In the same way RTDS and SCADA form a closed-loop-simulation, the use of simRTU and Matlab based simulation on standard PC hard-

DNP3 over Ethernet

Network Control

Workstation 1 Workstation 2

Network Control Center

Figure 7: Hardware in the loop simulation setup The RTDS system simulates a sample power system in real time. Measurement and control values are transmitted utilizing DNP3 as communication protocol. A simple earth ground fault detection 4

system is modeled (Figure 8). If an earth fault is detected the SCADA system receives this information. In the following either the operator or the network control system should analyze where the ground fault is located and isolate the network of concern.

110 kV Load 1 Load 2 0,4 kV

Load 3

Load 4

Load 5

Load 6

On the one hand the proposed system setup, in connection with the real-time simulator, makes it possible to analyze power quality in medium voltage networks with a high percentage of dispersed generation. On the other hand, the system is able to serve as a test bed for research dedicated to future network monitoring systems as well as network control. In the proposed setup the power system simulation is done on RTDS hardware with a real time measurement system, see figure 11. Subsystem II – 10-kV Rack 1

Rack 3 R2TL3 12 km 110 kV

10 kV

ground fault

10 kV

R2TR2 YNyn0

R2TR1 YNyn0

110 kV 10 kV

remote controlled switches Figure 8: Reference simulation network for ground fault detection

R2TL4 1 km

R2M1 0,5 MVA

Real Time Monitoring System

M ~

For real time monitoring purposes a hard real time process simulation is needed. Three phase instaneous value measurements of a continuously operating network are essential for PMU based applications like Wide Area Measurement Systems (WAMS), Wide Area Protection Systems (WAPS) or Wide Area Control Systems (WACS). Due to the focus on the evolution of distribution networks one needs to develop a reference network for real time simulation with a high density of dispersed and regenerative generation. Figure 9 depicts a benchmark network that has been developed in the light of the focus described above. This network is simulated on a three rack RTDS system with a real time operation of 150µs.

R2Load1 0,5 MVA

1 R2PV1 1 MVA

R2TC1 0,8 km

110kV/20kV

110kV/20kV

110kV/10kV

110kV/10kV

Figure 9: Reference simulation network for real time monitoring

R2Load5 0,5 MVA

R2Load6 1 MVA R2TC5 0,8 km

R2Load7 1 MVA

R2KW3 0,5 MVA R2TC6 0,8 km R2KW8 0,5 MVA

M ~

Rack 3

G ~ R2KW6 0,5 MVA

R2TC3 0,8 km

R2M4 0,5 MVA

M ~

R2TC4 0,8 km

R2TC2 0,8 km

Rack 1

Rack 2

G ~ R2KW1 0,5 MVA

G ~

R2M8 0,5 MVA M ~

G ~

R2TC7 1 km

R2Load4 0,5 MVA

R2M5 0,5 MVA

R2PV2 1 MVA

R2Load2 1 MVA

R2Load3 1 MVA

110 kV

R2TL5 1 km

R2Load8 0,5 MVA

Figure 10: Subnetwork 10-kV The real time target pc runs algorithms for power quality monitoring purposes, e.g. THD or harmonic content calculation. If an event is detected, the system records time series of monitored voltages and currents for post-event analysis.

Rack 1 simulates a 110 kV circuit fed by a slack node. The circuit is modeled as a closed ring, stretched over the other two racks. In both respective racks a distribution system with a high density of dispersed generation is modeled. The system in rack one represents a 10 kV urban area shown in figure 10, rack two a 20-kV rural area. Both systems are modeled as an open ring with eight busses. Four induction machines represent a high amount of combined heat and power units, installed in urban areas. At both lines photovoltaic plants are installed. The loads are modeled as combined static voltage dependent and dynamic voltage independent loads. In addition at every line two induction machines, modeled as motor load, are installed. Each model represents an equivalent of the dynamic behavior of numerous infeed.

Real-Time Target PC

Host PC

Interface RTDS

This network is designed to simulate transients and subtransients in real time for equipment testing also in the area of wide area monitor- Figure 11: Power quality monitoring system ing or control systems as well as power quality monitoring. 5

V. APPLICATION STUDIES

Event based Power Quality Monitoring

This application has been defined in order to provide a comprehensive evaluation platform for event based power quality monitoring at the point of common coupling (PCC). The idea behind this new The reference simulation network for real time monitoring (Figure 9 concept is to monitor power quality events based on negotiated and 10) has been simulated with special interest in power systems emissions from both perspectives: network operator and customer. stability of networks with a high density of dispersed generation. Here it is proposed to monitor the events based on the voltage magThe major objective of this study was to test the capabilities of the nitude at the PCC as described in the following: The negotiated real time simulation environment. voltage at the PCC is defined as

MV Distribution Grid with high amount of dispersed Generation and Performance Test

(1) uC (t )  Uˆ C sin(0t ) The example shows a step response of the 10 kV distribution network after remote switching of a photo voltaic (PV) generator. It will be used for further closed loop simulations with the SCADA All deviations from this voltage have to be classified with respect to “allowed” or “not allowed”. The deviations will be detected by system for control algorithm development. events. Each event qualitatively describes a violation of a negotiated quality band. With respect to the different time ranges where voltage band violations could occur, it is proposed to define the voltage band based on instantaneous and RMS values depending on the time range of disturbances (threshold is T0). The sliding RMS calculation will be done according to:

uRMS ,T0 (t ) 

t

1 T0

u

2 C

( )d

(2)

t T0

Figure 15 and 16 are depicting an example of poor quality voltages at PCCs in different representations. Example 1, Step response of active (P) and reactive power (Q) after switching PV-Unit on (node 1, subnetwork 10 kV)

Magnitude [pu]

1,5 Figure 12:

1 0,5

0 -0,5 -1 -1,5 0,0

0,1

0,2

0,3

0,4

0,5

t [s] Figure 15: Example 1, Step response of rotation speed of load at node 1 after switching the PV-Unit at node 1

2,0

RMS [pu]

Figure 13:

Example of a voltage at a PCC with poor power quality

1,5

1,0 0,5 0,0 0,0

Figure 16:

0,1

0,2

0,3

0,4

0,5

t [s] 10ms sliding RMS of the same voltage as depicted in figure 15

Example 1, Step response of active power consump- Based on a quality definition as described in [41] a quality event will be issued if a predefined threshold will be surpassed. The event will tion of the load at node 1 after switching the PV-Unit be registered with respect to importance and duration. The threshold The example simulation outlines the performance of the synthetic definition is based on a quality band approach and needs to be distribution network simulation, which will be used for closed-loop defined in a load specifc and network specific way. simulations with the SCADA system to develop control algorithm. Currently the fundamental functionality has been finalized and the general performance has been proven. Figure 14:

6

With this approach an objective detection and evaluation of power quality events can be realized. In Figure 17 some examples of power quality events are given:    

[3]

[4]

18% Dip for 100 ms (allowed) 50% Dip for 700 ms (threshold violation) Spike, 1.85 * Uc, 2us (allowed) [5] Tap changer operation - 0.9 .. 1.05 pu (allowed) – under the assumption of a typical change speed of the tap changer (even with compound winding) [6]

150% [7]

100%

Threshold

[8]

DuC [%]

50% 0%

[9]

-50% [10]

„Good“ quality region

-100% -150% 0,00001

0,001

0,1

10

1000

100000

[11]

Event Duration [s]

Figure 17:

Example of quality band definition with dedicated events

[12]

[13]

The role of the lab environment is twofold. Firstly, the ICT setup has to be developed and validated. Here the real time requirements results from the measurement system performacne. Secondly, in order to detailedly define the allowed operation range all thinkable cases of disturbances have to be simulated before such a system can [14] be released for monitoring a real PCC.

VII. CONCLUSIONS A real time development platform for the simulation of next generation of power system control functions is introduced. After a brief outline of the anticipated power system development with heavy use of information and communication technology requirements for a corresponding laboratory environment have been outlined. The realized simulation platform comprises different modules covering most of the simulation application cases with respect to primary and secondary components and the entire underlying information and communication system. Some reference networks and application examples have been presented in order to demonstrate the functionality of the proposed laboratory setup. With the proposed system a first step towards a “holistic” system simulation has been realized; this in particular against the background of microgrids, smart grids and other domain area where ICT play a major role and may become decisive for stable grid operation.

[15]

[16]

[17]

[18] [19]

[20] [21]

VIII. [1]

[2]

REFERENCES

Vaessen P. and Schaeffler G. J., “Future Power Systems transition – step into the light”, International Conference on Future Power Systems, November 2005 Reza M., “Stability analysis of transmission systems with high penetration of distributed generation”, Dissertation, Delft University of Technology, 2006

[22]

[23]

Westermann D. and John A., “Demand Matching Wind Power Generation With Wide Area Measurement and Demand Side Management”, IEEE Transactions on Energy Conversion, March 2007 Westermann D., Nicolai S. and Bretschneider P., „Energy Management for distribution networks with storage systems – A hierarchical approach“, IEEE Power and Energy Society General Meeting – Conversion and Delivery of Electrical Energy in the 21 st Century, July, 2008 Falleiros J. A. B., Melo M. A. A., Silva M. A., Shinzato, P., Mauricio, W., Oliveira Y. M. B. M., Mauricio S. T., Vasconcelos R. F. N. Holsbach I. L., Ruaro, R. D., Lima D. O, “Impact of dispersed generation in the power system performance”, IEEE Transmission and Distribution Conference and Exposition, August, 2008 Hammons T., Styczynski Z., “Europe: Impact of Dispersed Generation on Power System Structure and Secure Power System Operation”, Power Engineering Society General Meeting, June 2007 Strbac, G., “Impact of dispersed generation on distribution systems: a European perspective”, Power Engineering Society Winter Meeting, Januar, 2002 Styczynski Z. A., Buchholz B. A., “Integration of Renewable and Dispersed Resources: Lessons Learnt from German Projects”, IEEE Power Engineering Society General Meeting, June 2006 DeMeo E. A., “20% Electricity from Wind Power: An Overview”, IEEE Power and Energy Society General Meeting – Conversion and Delivery of Electrical Energy in the 21 st Century, July 2008 Yasin Z. M. And Rahman T. K., “Influence of Distributed Generation on Distribution Network Performance during Network Reconfiguration for Service Restoration”, IEEE International Power and Energy Conference, 2006. PECon '06 Van Vliet I.J., van Voorden A.M., Schavemaker P.H., Paap G.C., van der Sluis L., “Real-time simulation to study the impact of renewable energy in power systems”, International Conference on Future Power Systems, November 2005 Lin M. C., Lu C. N. and Su C. L., “Wide Area Network Performance Study of a Distribution Management System”, IEEE Transmission and Distribution Conference Vol. 1, April 1999 Hatziargyriou N., Kanellos F., Jenkins N., Zhang Y., Jayawarna N., Wu X., Resende, F. O., Madureira A. G., Moreira C. L. and Lopes Peҫas J. A., “Control Strategies for MicroGrid Emergency Operation”, IEEE Power and Energy Society General Meeting – Conversion and Delivery of Electrical Energy in the 21 st Century, July 2008 Centeno V., Phadke A. G., Vittal V. Manimaran G. and Xie Zhaoxie, “An Information Architecture for Future Power Systems and Its Reliability Analysis”, IEEE Transactions on Power Systems, Vol. 17, No. 3, August 2002 Leirbukt A.B., Gjerde J.O., Korba P., Uhlen, K., Vormedal, L.K., Warland, L., “Wide Area Monitoring Experiences in Norway”, IEEE Power Systems Conference and Exposition, 2006 Leirbukt. A., Breidablik O., Gjerde J. O., Korba P., Uhlen K., Vormedal, L. K., “Deployment of a SCADA integrated wide area monitoring system”, IEEE Transmission and Distribution Conference and Exposition, August 2008 La Scala M., De Benedictis M., Bruno, S. Grobovoy, A. Bondareva, N., Borodina N., Denisova D., “Development of applications in WAMS and WACS: an international cooperation experience”, IEEE Power Engineering Society General Meeting, June 2006 Wilson R.E., “PMUs [phasor measurement unit]”, IEEE Potentials, April, 1994 Bhargava B., Salazar A., “Use of Synchronized Phasor Measurement system for monitoring power system stability and system dynamics in real-time”, IEEE Power and Energy Society General Meeting – Conversion and Delivery of Electrical Energy in the 21st Century, July, 2008 Qiang W., “Voltage Security enhancement via coordinated control”, IEEE Transactions on Power Systems, Vol. 16, 2001 Senjyu T., “Optimal Distribution Voltage Control and Coordination with Distributed Generation”, IEEE Transactions on Power Delivery, Vol. 23, 2008 Strunz, K.; Carlson, E.: ”Nested Fast and Simultaneous Solution for Time-Domain Simulation of Integrative Power-Electric and Electronic Systems”, IEEE Transactions on Power Delivery, Vol. 22, No. 1, January 2007 Strunz, K.;: “Flexible Numerical Integration for Efficient Representation of Switching in Real Time Electromagnetic Transients Simulation”. IEEE Transactions on Power Delivery, Vol. 19, No. 3, July 2004

7

[24]

[25]

[26]

[27]

[28]

[29]

[30]

[31]

[32]

[33]

[34]

[35]

[36]

[37]

[38] [39]

[40] [41]

B., Wu X., Figueroa, H., Monti, A., “A Low-Cost Real-Time Hardware-in-the-Loop Testing Approach of Power Electronics Controls”, IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, VOL. 54, NO. 2, APRIL 2007 Dae-Jin P., Young-Ju K., Mohd A., Minwon P., Yu I., “A Novel RealTime Simulation Method for Grid-Connected Wind Generator System by Using RTDS”, Proceedings of International Conference on Electrical Machines and Systems 2007, Oct. 8-11 Du, D.X. Bo, Z.Q. Zhou, Z.X. Perks, A. Denning, L. Smith, B., “An Advanced Real Time Digital Simulator Based Test System for Protection Relays“, Proceedings of the 41st International Universities Power Engineering Conference, 2006. UPEC '06., Sep. 6-8 2006 Ren, W. Steurer, M. Woodruff, S., “Applying Controller and Power Hardware-in-the-Loop Simulation in Designing and Prototyping Apparatuses for Future All Electric Ship“, IEEE Electric Ship Technologies Symposium, 2007. Forsyth, P. Kuffel, R. Wierckx, R. Jin Lu -Boo Choo Yong-Beum Yoon Tae-Kyun Kim, „Comparison of transient stability analysis and large-scale realtime digital simulation“, IEEE Power Tech Proceedings, 2001 Porto Garg, M. Hamilton, H. Srivastava, A.K. Schulz, N.N., „DC converter based fault analysis using simulink and RTDS“, Annual IEEE India Conference 2008 Wenzhong Gao Ge Wang Jiaxin Ning, „Development of low voltage ride-through control strategy for wind power generation using real time digital simulator“, IEEE/PES Power Systems Conference and Exposition, 2009 Yoshino, T. Jin Lee Chul Kyun Lee Sung Woo Park, „HVDC control development for isolated small AC system with real time digital simulator“, 7th International Conference on Power Electronics 2007 Albasri, F.A. Sidhu, T.S. Varma, R.K., „Performance Comparison of Distance Protection Schemes for Shunt-FACTS Compensated Transmission Lines “, IEEE Transactions on Power Delivery, Oct. 2007 Bo, Z.Q. Klimek, A. Ren, Y.L. He, J.H, „A Real Time Digital Simulation System for Testing of Integrated Protection Schemes“, Powercon 2008 Li Ling Shu Nai-qiu Pei Chun-ming Liu Min Li Chang-yu, „Realtime Simulation of the Harmonic Influence on Electric Metering Using RTDS“, Powercon 2006 van Vliet, I.J. van Voorden, A.M. Schavemaker, P.H. Paap, G.C. van der Sluis, L., „Real-time simulation to study the impact of renewable energy in power systems“, International Conference on Future Power Systems, 2005 Bin Wang Xinzhou Dong Zhiqian Bo Perks, A., „RTDS Environment Development of Ultra-High-Voltage Power System and Relay Protection Test“, IEEE Transactions on Power Delivery, Apr. 2008 Smith, C.A. Potts, S.C. Redfern, M.A., „Simulation studies of OLTC transformer AVC relays operating in series using a RTDS, real time digital simulator“, Eighth IEE International Conference on Developments in Power System Protection, Apr. 2004 Forsyth, P. Kuffel, R., „Utility applications of a RTDS® Simulator“, International Power Engineering Conference, 2007 Li Han Han, Y.D. Wang, Z.H. Claus, M. Retzmann, D. Povh, D., „Verification of HVDC controller using an advanced hybrid real timesimulator“, Aug. 18-21 1998 http://wanem.sourceforge.net/ Kyei J., Ayyanar R., Heydt G., Thallam R., Blevins J: „The Design of Power Acceptability Curves“, IEEE Transaction on Power Delivery, Vol. 17, No. 3, 2002

IX.

Dirk Westermann (M’94–SM’05) was born in Germany in 1968. He received his diploma degree in Electrical Engineering in 1992 and his Ph.D. in 1997 at the University of Dortmund, Germany. In 1997 he joined ABB Switzerland Ltd. where he held several positions in R&D and Technology Management. He became full time professor and head of the power system department at the Ilmenau University of Technology in 2004. There he has been the director of the Institute of Electrical Power and Control Technologies since 2005. He is author of many international scientific publications and holds international patents for power system planning and control. He worked on research projects related to power system analysis and control and energy management systems. His current research interests are related to design, control and operation of future power systems. Prof. Westermann is senior member of IEEE, regular member of CIGRE SC B4 and member of VDI. He is actively contributes to the IEEE Germany Section and the IEEE Power Engineering Society Chapter Germany. He is also convener of CIGRE WG B4.46.

BIOGRAPHIES

Michael Kratz (M’05) was born in Germany in 1979. He received his diploma degree in Computer Science Engineering in 2005 at the Ilmenau University of Technology, Germany. In 2005 he joined the power system department at the Ilmenau University of Technology as a scientific co-worker. He is working on research projects related to design, control and operation of future power system with special interest on communication and information technologies.

8