DEPARTMENT OF THE INTERIOR a m" Dummie- m mm m. GEOLOGICAL
SURVEY [1-08 1. APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG
BACK ...
Forrn (May
SUBMIT IN T (Other instructions reverse side)
9-881 C 1963)
UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL
TE*
Form approved. Budget Bureau No. 42-R1425.
on 5.
LEASE
SURVEY
APPLICATION FOR PERMITTO DRILL,DEEPEN,OR PLUG BACK TYPE
' """
OF WORK
DEEPEN O
DRILLE b.
TYPE
PLUG BACK O NNG
WAELL OTHER
UNLTIPLE
8.
e
Box
O.
599,
(Report
CATTI NœOF WELL
location
FNL & 668'
906'
ÇO
Denver,
clearly
to.
80201
and in accordane
with any
OR LBABB
DIVISION OF OIL
miles
±18
of Jensen,
southeast
FBÒM PROPUBED* TO NEAREST
DISTANCE LOCATION
18.
6200 '
LOCATION* DISTANCE FROM PROPOSED TO NEAREST DRILLING, COntPLETED, WELL, OR APPLIED FOR, ON THIS I.EASE, "·
(Show whether
21. ELEVATIONs
NO.
OF
IN
ACRES
Within 1Û. PROPOSED
LEAsa
NO. OF ACRES ABBIGNED WELL TO THIS
20.
noTAar
on
cABLE
SIZE
HOLE
OF
16"
is
test
OF
WEIGHT
CASING
14" 9 5/8" 7"
12 1/4" 8 3/4" It
to drill
proposed the Lower
Green
23#
River
Well
Development Formation.
Class
III
BOPE ,
Surface
Use
Plan
to be submitted
Procedure
Completion
ABOVE
DESCRIBE
SPACE
If proposal sentN oprog
is
PROPOSED
OIL ÛA g by
5900 ' to
ndry
AS, N
NING
' Notice.
productive PROGRAM : If proposal is to deepen or plug back, give data on present and measured and give pertinent data on subsurface locations directionally,
or State
3 2 3 1 1 1 1 1 1
-
-
-
BLM
state Partners
-
LRH
-
ALF
-
I
-
Field
-
Sec.
-
File
zone and proposed
true vertical depths.
Ëng
APPROV4T.
TITLE
BY OF APPROVAL,
IF ANY :
AS$ißtânt
û€€rin2
DAT.
office use)
NO
CONDITIONS
of
724C
new productive Give blowont
y
(This space for Federal
APPROVED
To Surface
to drill or deepen
TITLE
PERMIT
to a depth
OF CEMENT
To Surface To Surface
OF UTAH DIVISION OF
Plat Program
Chevron
zone.
QUANTITY
DEPTH
50' 500' 5900'
36# this
PROGRAM
APPAOVEDBYTHE STATE
Certified Drilling Multi
BETTING
PER FOOT
Attachments:
IN
1984
December AND CEMENTING
wn.r. armar•
DATE woaK
APraox.
GR 5652'
BIZE
TooLa
Rotary 22.
CASING
STATE
40
DF, RT, GR, etc.)
PROPOSED
13.
Utah
17.
Unit DEPTH
5900 '
2500 '
23.
R23E
T7S,
OR PARISH
Uintah 16.
utÏ'iine, « any, ÏÛo't'or oenarŠ"Iri's
River
a'°
22,
COUNTY
AT
-Green
.,wó'aiiir"¡ia'a
Sec.
Utah
OR W
700
SSh
12.
10.
AND
e
NWNW
FWL
NAME
1-228)
FIELD
11.
prod. zone
At proposed
NO.
Wash
FARM
29 P.
BERIAL
"'"
**"""""'
//ed
OF WELL
OWELLL
AND
U-081 IPINDIAN,ALIATTEMORTRIBBNÃm
0.
1a.
DNBIGNATION
DATF
DATE
Nov, 2,
984
T7 S
R 23 E
cuaùnowü.sMum. arà ma w.na...n.«,
S. L 6. & M
rr
295 (1/- 2ž B/, lóëated os shown in the NW 1/4 NW I/4 Section 22, T TS, R 23 E, S.L.S.a M. F
Uintoh
County
Utah.
,
WEST 80
.
14
RED WASH UN/T # 295
ess'
Elev.
Ground
Ungraded
(H 22 B) 5652' -
-
CÆRTIFICATE IS
THAS FIELD
TO
CERTIFY
NOTES
SUPERVISION BEST
OF
MY
TNAT
OF
ACTUAL
ANO
THAT
THE
KNOWt.fDGE
PLAT
ABOVE
TN£
SURVEYS
MADE
SAME AR€
AND
PREPAREO
WAS
BY
ME
TRUE
OR
UNDER CORWECT
AWO
FROM MY
TO
THE
BELIEF.
REGISTERED NO SURVEYOR REGISTRATION N2 2464 STATE OF UTAH
UINTAH 80.
R 0 BOX
10
N 89* 59' W
=
Section
Corners
Located
Q
-
a UTAH
SURVEYlNG
LAND
88 SOUTH
VÈRRAL,
200
-
-
=
10
1000'
PARTY
0.8. WEATH€R
Cold
/
30
REFERENCES
C.M.
GLO Plot
BFW FILE
EAST
84078
SCALE
1" X
ENGINEERINe
/ 84
DRTTJ.ING PROGRAM ATTACHMENT GENERAL REMARKS
1.
2.
Applicable
Federal of
The
rig operations
drilling
drilling
insure
to
well
3.
this
drilling
to
Prior
familiar
and
is
spud
to
level
be
commence. rig stays
the
with
will
Regulations
State
adhered
be
to
the
during
well.
the
over the
centered during
kelly
periodically
before of the
the hole drilling
level.
insure
toolpushers, the Chevron
all understand
and
and Check
drillers procedure
and crews for handling
are well
In H28 environments location contingency plan for your Chevron's understood All personnel are to be thoroughly read, and adhered to. system, of air with the use of air locations packs, the air supply what to do in the event of sour gas to surface.
thoroughly kicks. is to be familiar packs and
4.
and every Perform low seven days thereafter. Test BOPE before drilling out should pressure and high pressure test. High pressure test be test (200 psi) whichever of last string, casing pressure or 70% of burst 70% of BOPE working Federal and is less. Record BOP tests Reports. Notify applicable on Tour in advance of BOPE tests and record Agencies Regulatory State 24 hours notification and names on Tour Reports.
5.
Do not
6.
Separate size drill
7.
reuse
full opening pipe in use.
Replace
safety Test
with
BOP controls
9.
Hold Tour
pit
are
drills
to remain for
each
new
valves
and
weekly
with
Run full open valve below kelly that Do not use this valve as a mud saver
8.
10.
gaskets.
ring
in the crew
inside BOPE.
Bx ring BOP's
are
the
hole
in
can be run
gaskets. for
required
if
each
necessary.
sub.
position
open least
at
Rx or
once
during every
operations.
drilling seven
days
and
record
on
Reports.
On trips fill stds of drill up and monitor
11.
Use drill wise.
12.
Have wear to remove
pipe
ring wear
before the annulus pipe, whichever is at all times. floats
at
installed before
ring
all
hydrostatic pressure drops 75 psi first. Use trip tanks to measure
times
unless
before wellhead or running casing
in
your
supervisor
instructs
tripping or rotating. BOPE. testing
when
or every 5 fill-
hole
other-
Remember
13.
Casing
rams
running
14.
15.
Run pilot slurries Casing
to
be
installed
and
prior
and
tested
bonnets
time tests operations.
thickening to cementing
should be to drilling
prior
pressure 16.
are
on
last
trip
water
for
out
before
all
cement
casing.
tested to out and your supervisor
with
Drill out stabilization
17.
Do not
drill
18.
Do not
run
19.
When necessary not considered
20.
Install otherwise
21.
Fully
slick beneath to be picked with
full
describe
casing
pipe
to work pipe, sufficient.
damaged
mixing
0.2
psi/ft.,
whichever
Tour Reports. DM-49 before
is
Discuss
greater, the test
testing.
Drill
string.
lost
inside Run
keep
lubricator
or
or
rig
deep
enough
to
bury
up.
stabilizers.
and test full by supervisor.
psi
recorded on and reference
each
hardbanded gauge
1,500
with
pipe
on
equipment
of casing. stabilizers moving
all
up
1/16" and
logging
on Tour
Reports.
down.
runs
to 1/8"
undergauge.
Rotating
unless
alone
instructed
is
$ A ML
DRILLING PROGRAM
Field
Red
Wash
Location
Section
Drill
X
Well RWU 295
Unit
22.
906'
FNL,
Hole
Hintah
nenh
Conney,
56599
GL
KB
94999
sqqqr
TD Max. Angle Bearing
qqnar
TVD_
Avg. from
p
Angle
Surface
Hole
Surface
Proposed
16"
Depth
Casing
50'
Size,
Weight
& Grade
gn
Hole
Hole Size Mud Program:
Potential
Electric Core/DST
Proposed 12¼" Type
Depth MW
Hazards: Logging Program:
None
Program:
None
BOPE
500'
None WL
FV
Other
None
Program:
Size
Grade
9-5/8"
K-55
Cement
FWL,
Measured
Proposed
Hole: Build
Size
Casing
668'
Elevations:
Location
1. Conductor
2.
R23E.
Deepen
Directional/Straight KOP Target
T7S.
Exp/Dev
(11-72R3
Lead Slurry Tail Slurry hrs.
Program:
WOC Time
6
Weight 36#/ft
01899
'H'
Casing
Test
w/77
08012
1500
¯
Thread
Section
ST&C
500'
' " psi
Length
SYS
Shoe
test
MWE
g 4
(Static) 3.
Intermediate
Hole
Hole Size Mud Program:
N/A Proposed
Type
Potential Hazards: Electric Logging Core/DST Program: Casing Program:
Grade
Program:
Lead
Tail WOC Time
FV
Other
WL
Program:
Size
Cement
BOPE
Depth MW
Slurry Slurry hrs.
Weight
Casing
Test
Section
Thread
psi
Shoe
test
MWE
Length
ppg
Page
2 Program RWU 295
Drilling Well
4.
Hole
String/Liner
Oil
Hole Size R-3|& Type Mud Program: Gel-Water Gel-water-Cham
Lead Tail
Program:
WOCTime
12
5. Auxiliary
TIT
-
10 from 3000'
circulation DIL-MSFL-SP, None
ima
h
en
to
500' 2500'
EPT,
73#ffy
T.The
23#/ft
T.T&c
Test
-
Tp
Mierning
DPT,
Section
Thread
Low Penairv Filler Class 'H' Tailored
UP
T.n.
LDT-CNT.-GR-CAT,
Weight
Casing
4500'
pmi
3000
Other 2500'
-
-
-
/.n
Slurry
Clamm
sonn' surf
-
-
Length
Rannt
sonn'
Cmt for
Depth
& Temp
Psi
7000
Equipment
Mud Logging
Unit
Geolograph Visulogger
Adj.
Chevron
WL
FV
+4.0
Slurry hrs.
BOPE
5900'
MW 6
+8
Hazards: Potential Lost Electric Logging Program: Core/DST Program: Casing Program: Grade Size N-SO 7" K-55 7" Cement
Depth
Proposed
Choke
@ @ @ @
PVT & Flowmeter @ Tank Trip @ Other: Full Opening
2000'
Rotating
Spud
Degasser
Head
Desilter Centrifuge Mud Cleaner H2S Safety
-
500' Spud Spud D.P. Safety
Inside
Valve,
BOP,
@ @
-
3000'
spad
@ @ Equip.
Upper
-
sppå
@
& T.nwar
_
Re11ey
Cock
Un1va
from
ßpud, 6.
Drill
String
Design
Hole: Surface BRA 12¼" bit, Drill Pipe 4½"
BHA
BHA Drill
DC.
XO Stah,
6-3/4"
DC's
E
µ(A Pipe
String/Liner
Oil
?-8"
00, Stab.
Hole:
Intermediate Drill
1-8" 16,60#
Pipe
Hole:
8-3/4" 4½",
6-3/4" 16.60#
þit,
pc's F,
7. Other Inspect BHA after run holes In "straight" Gyro Surveys N/A
Check Fill
8.
breaks drilling drill pipe every
General
rotating
ÿ00 inclination for
flow 20
surveys
below stds
hours. every
3 000 when running
+son
feet.
feet. float.
Remarks
Attached
9. Geologic PreAt
Program
ch Date
/
Drilling
Superintendent
Date
GEOLOGIC PROGRAM Field/Area
peg past
Well
RWU #295 (11-22B)
Name
Location:
Elevation:
Total
Depth
Objectives:
Coring: Interva1/on Interva1/on Interva1/on Interval/on Interval/on Drill
Sec 97 Co thn‡ak Surface 906' Bottom Hole GL estimated IB estimated
Primary Secondary
show show show
10)
11)
FNL.
79 State 668 FWL
Range
RW
fu
A
Development
pay
µ+44 NWkrNWh
56979
Surveyed Surveyed
5645' 5665' TD
Em at
fa
Green
56
pt
River
Green giver None
Formation None
Estimated
Amount
Depth
show show
pope
2-man FID unit from 2000 to T.D. (possible comouter attachments pending
Electric logging: 1) DIL-SP 2) DIL-MSFL-8P 3) BBC w/GR, Ca1. 4) LDT-CEL w/GR, Cal. 5) FDC-CEL w/GR, Ca1. 6) Dipmeter 7) Velocity survey 8) RFT
9)
TUP
5990
Stem Testing
Mud Logging
Exp1/Dev
$
Surface
resulta
RWH 2913
Intermediate
Depth -
to TD
Casing -
2000
to TD -
-
-
-
EPT
4650 4650 4650
DPT Microlog
All runs from TD to either base log run unless otherwise noted.
Total
of surface
casing
or overlap
with
to TD
to TD to TD previous
A
DJ
GEOIDGIC PROGRAM(Continued) Tops: Formation Hintah Green
River
F
G
R
Log Depth,
datum
5381'{+284) 5510'(+155) 5762'(-97) 5900'
K
L TD
1)
Sample Depth, datum
5099'(+¶66)
I J
Correlation
Estimated Depth, datum Surface 3059'{+2606) 4441'{+1224) 4669'(+996) 4902'{+763)
Wells: Correlative Zones Em Interval
RWU #129 & 63
with
Subject
Nell
Primary objective zones to be cored. Zone to be DST.
2)
Fyn #6 & 99
Primary objective zones to be cored. Zones
DIVISION OF INTEREST: Working Interest Partners: Chevron gyl Sulf Caulkins
Others
122
0MI Receiving
Buttram
to be DST.
0 gi
Data:
REHARKS:
Prepared
Reviewed
by by
Formation Approved
Date Date
D. M. Thompson Evaluation
Analyst Date
Oçtober
3,
1984
H
FLOW LINE
FIGURE
FILL
4 THREE PREVENTER HOOKUP CLASS 111
UP LINE
(PRESSURE RATING 3-5000
PSI AS REQUIRED)
ANNULAR PREVENTER
EMERGENCY FLOWHOOKUP
ALTERNATE CHOKEMANIFOLO
HYORAULICVALVE
CHOKE "O,, ADJUSTABLE
BLIND RAMS 2"-4"STEEL VALVES
2" FLANGED STEEL VALVE 4"STEEL VALVE
4" LINE
"8 ORILLING
"E-
/
SPOOL I
3"or4"STEELVALVE
. .
mittE DalLUNG,80TH VALVESAREKEFTCLOSED
ll
DRILL PIPE RAMS
2"FLANGED STEEL VALVE
--
C
FLANGEO STEELCROSS
2° FLANGEOSTEEL VALVE
"D" LONGPOSITIVECHOKE 08 ADJUSTABLE
3"or4"STEELVALVE
~2'
' FLANGED STEEL
VAt.VE LONGPOSITIVECHOKE OR ADJUSTABLE
AN EXTRA SET OF DRILL PIPE RAMS AND BONNET SEALS WILL BE ON LOCATION AT ALL TIMES.
2" STEELVALVEg CASINGSPOOLSHOULDBE POSIT10WED SO THATTHESE VALVESAREOtBECTLYUNDER THEBARRELOF THERAM PalvENTER.
"0•• ADJUSTABLECHOKE
coENssunEGNAUGE
ChevronU.S.A.Inc. ROCKY
MTN,
PRODUCTION
DIVISION
LE 81-7511 Revision 4
CHEVRONU.S.A. INC. RED WASHUNIT 295 (11-228) SEC. 22, T78, R23E UINTAR COUNTY, UTAH MULTIPOINT SURFACE USE PI.AN
1.
EXÌSTING
A.
ROADS
See
Topo
improve B.
From
State road, road 2.
maps "A" and upon any existing
"B". state
We or
do
not county
Utah, take U.S. Hwy. 40, On Hwy. 45 go 19.3 miles Hwy. 45. take this road east for 2 miles. 150' long will be constructed south Vernal,
plan
to
change,
travel east for 3 miles to southeast to a paved county At this point, an access into the well site.
location is going to be adjacent to the existing road. and planned roads in the Unit Existing will be accordance with Bureau of Land Management standards.
"B".
A. B.
C. D.
E. F. G.
See Topo maintained
Width: Maximum width 30' with an 18' travel area. Maximum Grade: 8% if necessary.. Turnouts: None, avoid blind corners. Drainage Design: Roads to be placed and constructed so that drainage alterations will be made. Water will be diverted well pad as necessary. No major and fills. cuts Materials: Surfacing Gravel if necessary (see item 6-A). Other: No gates, cattleguards or fence cuts. Culverts installed where necessary.
Map in
minimal
around
to
be
LOCATION OF EXISTING WELLS See Exhibit
4.
or
PLANNED ACCESS ROADS
The
3.
alter
roads.
"D".
LOCATION OF EXISTING AND/OR PROPOSED FACILITIES
A.
See Exhibit
B.
Install from subject 1,100' new flowline well to collection station C" as shown on Exhibit Flowline will "D". be 3" plain end welded line pipe, placed on supports on the surface. Normal construction procedures will be used. When warranted, fences, flagging, etc., powerwill be used to protect animals. We will install an electric line from the well to an existing powerline 350' north as shown on Exhibit
C.
Disturbed
to
as
returned scribed
"D".
"D".
areas no original to original by BLM
near
longer state state
needed for operations will be graded back as possible. Drainage channels will be and the areas will be reseeded as pre-
MULTIPOINT SURFACE USE PLAN RED WASH UNIT 295 (11-228)
Page
5.
2
D.
A blooie south of
E.
A line heater will be required About 100' of access will be This will be adjacent to the flowline from this well.
pit 8' X 10' X 5' deep will be constructed to 150' the center hole as shown on Exhibit "C". A line will placed on the surface from the center hole to the burn pit. The will be fenced on four sides to protect livestock.
for the production from this well. needed to service this line heater. pad and placed along the production
LOCATION AND TYPE OF WATER SUPPLY A.
to the location will be piped through line from the appropriate collection station water line. This line will temporary be removed after completion operations.
Water
supplied
surface
6.
a temporary or nearest drilling and
SOURCE OF CONSTRUCTION MATERIALS
A.
7.
the be pit
All land is Federal land. All gravel, cement, needed on the etc., access road and location will come commercially from the Vernal, Utah area. Access road needed is shown on Topo map "B".
METHODSFOR HANDLINGWASTE DISPOSAL A.
Cuttings will be settled out in the reserve pit. The reserve pit be unlined. be fenced It will with a wire mesh fence, topped at least one strand of barbed wire.
will with
B.
Drilling
fluids
recirculation liquid waste deep subsoil
natural
be retained in reserve tanks utilizing maximum operations. drilling Following drilling, the will be evaporated worked and the remainder into the of the pit, and the pit filled in and returned to will during
grade.
C.
the event fluids are produced, any oil will be retained until sold in tankage and any water produced will be retained until its quality is determined. The quality and quantity of water produced will then determine the necessary disposal procedure.
D.
Sewage will be disposed of in a 1,000 gallon fiber glass holding tank, which is to be placed in the vicinity of the on the well location. Arrangements have been made for the be transported from the wellsite to the City of Vernal, disposal in the city disposal system. The sewage will be an authorized firm. hauling
E.
In
Trash
will
periodically
be contained in a portable to an approved disposal
metal
container
insulated trailers sewage to Utah for hauled by
and
hauled
MULTIPOINT SURFACE USE PLAN RED WASH UNIT 295 (11-228) Page
3
F.
8.
After the be removed
10.
11.
the
all
wellsite, dump.
waste
to good roads and relatively ancillary facilities with the on the drilling location.
accessibility
trailers
no need to be located
WELLSITE
LAYOUT
will
material
for
close exception
housing, of two
A.
Between four and six inches of topsoil will be removed from the location and stockpiled. Location of mud tanks, reserve, burn and trash pits, pipe racks, living facilities and soil stockpiles will be located as shown on Exhibit "C".
B.
Pits
will
not
be lined.
PLANS FOR RESTORATION
OF SURFACE
A.
All surface areas not required for producing operations will be graded to as near original condition as possible and contoured to maintain possible erosion to a minimum. Any rock encountered in excavation will be disposed of beneath backfill to return surface to its present appearance and provide soil for seed growth.
B.
The topsoil will be evenly distributed Reseeding will be performed as directed
C.
Pits and livestock
any will
other area be fenced
D.
Any oil flagged
E.
The well will be completed mence following completion dance with BLM requirements,
accumulation as dictated
over the by the BLM.
that would present off when the rig is
on the pit will by then existing during of the
a hazard released
be removed, conditions. 1985. well,
disturbed
to wildlife and removed.
burned
Rehabilitation reseeding to
areas.
or
overhead
will be
or
in
comaccor-
SURFACE OWNERSHIP
A.
12.
from the disposal
ANCILLARY FACILITIES Because of we anticipate
9.
has moved to an approved
rig
The wellsite, constructed
access roads, flowlines on BLM owned surfaces.
and
powerlines
will
all
be
OTHER INFORMATION
A.
well is located on hilly and rocky terrain. Vegetation consists of Juniper sagebrush, prickly pear and various grasses on and around the locations. The soil is a poorly developed, semi-arid, thin topsoil layer over the Uintah
The
MULTIPOINT SURFACE USE PI.AN RED WASHUNIT 295 (11-228)
4
Page
13.
B.
Surface livestock
C.
There are no water bodies There are no archaeological, area. An archaeological inspection and no cultural
activities other grazing as assigned
use
than the by BLM.
oil
well
facilities
consist
of
or
occupied dwellings near the wellsite. historical or cultural sites in the walk through was made during the onsite resources were found.
COMPANYREPRESENTATIVE Mr. B. L. Haynes P.O. Box 599
Denver, CO 80201 (303) 691-7527 I
hereby
certify that I, or persons under my direct supervision, have the proposed drillsite and access route; that I am familiar with the conditions which presently exist; that the statements made in this plan are, to the best of my knowledge, true and correct; and, that the work associated with the operations proposed herein will be performed by Chevron U.S.A. Inc. and its contractors and subcontractors in conformity with this plan and the terms and condit ons under it is app which
inspected
.
Date
B. L. Drilling
LLK•mm
Map "A" Map "B" Exhibit Exhibit
-
-
Proposed Current
"C" "D"
-
-
Location & Proposed
Location Existing
Access
Roads
Layout and Cut and Fill Wells and Existing and Proposed
Haynes Manager
U.S.A. INC. S) .R.U. * 299 (11-ZZ PROPOSED LOCATION HEVRON
TOPO.
MAP"A"
548
5//7
Com --.-
O
o
s
eso.. adm
'·,
•
INC. U.S.A. CHEVRON e295O1-22 6) W.R.L). LOCATION PROPOSED
"
MAP B
TOPO.
"
SCALE Is ac ro Ught duty road, all
.r
weather,
Untmprovedroad fair or dry
..U
VE
LUNr» FLut05
15
og.
El
DA
ErrA.
C/3
S+ 75
toë¾
CALE
449 Sott.s No
=
LITwot.o -
so
APPRo
DAGE.S
Ca.Yos.
stALE
Lt
.
INC. U.S.A. RED WASH UNIT 295 (11-228) SEC. 22, T7S, R23E UINTAH COUNTY, UTAH
CREVRON
|-268
/
13-278 44 -
y;
PA
R
44-278
irr
'i4-
CENTRAL BATTERY
)
1954
27s
*
,
!4-268.
-
"D"
2.
-
-
-
-
-
p -
--
-·-
-
PROPOSED
-PROPOSED
POWER LINE FLOW
OPERATOR
C
DATE
-.ZZ
WELLNAME
gÑÁ/ld9
SEC
/2
T
I‡3 of 7
-
S
R
COUNTY
3/677
4
eg
AAI NUIER
TYPE OF LEA$E
CHECKOFF: AT
D
NEARESTWELL
ASE
TASHOR OIL SHALE
PROCESSINGCOMMENTS:
APPROVALLETTER:
SPACING:
c-3-a
-3
UNÏT
c-3-b STIPULATIONS:
11/2/84
CAUSENO. & DATE
c-3-c
rvar
sua i
I
42 42
381 382
50 SHEETS 5 SQUARE 100 SHEETS 5 SQUARE 200 SHEETS 5 SQUARE
\
N
/
November
13,
1984
U. S. A. Inc.
hevron
P. D. Bo× 599 Colorado Denver,
80201
Gentlemen: (ll-22B) Well No. Red Wash Unit #295 Re: 9Õgi~FNL, 668' FWL Uintah County, -
NWNW Sec. Utah -
22, T. 7S,
R. 23E
granted in the above referenced oil well is hereby Approval to drill amended 1983; and as Utah Code Annotated, 40-6-18, with Section accordance Practice Rules of and Regulations on Rule A-3, General Rules andstipulations: predicated to the following subject and Procedure, receipt by the Division of Prior to commencement of drilling, 1. of an adequate and approved supply of assurance evidence providing water. comply with this the following actions are necessary to fully In addition, approval: to the Division within 24 hours after drilling Spudding notification 1. operations commence. 2.
3.
4.
Submittal Encountered
to the Division During
of completed
Form OGC-8-X, Report
of Water
Drilling.
that its to the Division should you detetermine notification Notify John R. Baza, to plug and abandon this well. necessary (Home) 298-7695 or 538-5340, (801) (Office) Engineer, Petroleum (Home) 571-6068. Director, Associate R. J. Firth, of Rule C-27, and regulations Compliance with the requirements Oil and Gas Regulations, and Rules General Gas Flaring, Associated
Prompt
Chevron U. S. A. Inc. Well No. Red Wash Unit November 13, 1984 Page 2
5.
#295 (11-228)
unless issuance This approval shall expire one (1) year after date of application is underway or an operation substantial and continuous date. approval expiration the to prior made is for an extension
The API number
assigned
to this well is 43-047-31577.
Associate
E
có:
ures Branch
of Fluid
Director,
Oil & Gas
Scott M. Matheson, Governor Temple A. Reynolds, Executive Director Dee C. Hansen, State Engineer
STATE OF UTAH RESOURCES & ENERGY NATURAL
.
Water Rights
23 Eost Moln Street• P.O. Box 879 Vernal, UT84073•801-789-3714 -
November 13, 1984
NOV20 1984 DIVISION OF OIL,GAS& MINING Chevron U. S. A. Inc. P. 0. Box 599 Denver, Colorado 80201 RE: Temporary Change 84-49-78 Gentlemen: The above numbered Temporary Change Application approved, subject to prior rights. A copy is herewith future
has been
returned to you for your records
reference.
Robert F. Guy for Dee C. Hansen, P. E. State Engineer DCH:RFG/1n Enclosure
cc: 011, Gas & Mining Salt Lake City,
Utah 84114
Deputy State Engineer/Earl M. Stoker an equal opportunity employer
Area Engineer/Robert -
please recycle
F. Guy
and
Form Approved. Budget Bureau No. 42-RI424
Form 9-331 Dec. 1973
UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICALSURVEY
5. LEASE
p-ogi 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENTNAME
SUNDRY NOTICESAND REPORTS ON WELLS sais to drill or to deepen B þ
(Do not use this form for pro Use Form 9-331-C
1. oil well
gas well
Ë
Red
or plug back to a different
r•dtigli
reservoir.
other
9. WELL NO.
(11-228)
295
2. NAME OF OPERATOR .
Red Wash
-
Lower
22.
Sec.
T7S.
River
R23E 13. STATE
12. COUNTY OR PARISH
Uinteh
Utah
14. API NO. Not yet assigned 15. ELEVATIONS(SHOW DF, KDB, AND WD)
16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA REQUEST FOR APPROVAL TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE CHANGE ZONES
Green
11. SEC., T., R., M., OR BLK. AND SURVEY OR AREA
AT TOP PROD. INTERVAL: AT TOTAL DEPTH:
13 Point
r
10. FIELD OR WILDCAT NAME
Chevron U. S. A. Inc 3. ADDRESS OF OPERATOR CO 80201 P. O. Box 599, Denver, 4. LOCATION OF WELL (REPORT LOCATION CLEARLY.See space 17 below.) ' FNL & 668 ' FWL (NWNW) AT SURFACE: 906
ABANDONRevise
Wash
8. FARM OR LEASENAME
SUBSEQUEN
NOV2 31984=••
== or--w•-='•=--• change on Form 9-330.)
DMSIONOF L GAS&WNNG
Plan
17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, give subsurface locations and measured and true vertical depths for all markers and zones pertinent to this work.)*
5.
LOCATION AND TYPE OF WATER SUPPLY A.
Water
B.
will to the location collection station.
supplied
appropriate
the Water roads
will be transported in the area.
over
be hauled
existing
from
by truck
and proposed
access
LLK:st1
Set
Subsurface Safety Valve: Manu. and Type 18. I hereby certi
hat
the foregoing
SIGNED
BY CONDITIONS OF APPROVAL, IF ANY:
Ft
is true and correct TITLE
Engineering
(This space for Federal APPROVED
@
egy,
or State office use) DATE
TITLE
*See instructions
Asst.
on Reverse
Nov.
21,
1984
SUBMIT IN TRIPÍCATE*
'°'"X'""""U'°""
UNITED STATES DEPARTMENT OF THE INTERIOR
5.
b.
OF WORK
or
TYPE
PLUG BACK O
DEEPENO
DRILLE AL
.
No. 4&R1425.
DNBIGNATION
AMD BERIAI.
MO.
G.IFINDIAN,ALLOTTEROBTRIBENAME
'l. UND
AGREMNT
Red
Wash
wmLL UNLTH LE
NNELE
GWAE I,
ag.m
U-081
APPLICATION FOR PERMIT TO DRILL,DEEPEN,OR PLUG BACK TYPE
I»EASE
SURVEY
GEOLOGICAL
la.
Porm
"""
*"
NAME
OTHER
OPERATOR
3.
I NœOF WELL
DISTANCE
FWL
CO clearly
10.
80201
y Sta
and in accordance
IN
MILES
AND
FROM
of
southeast
NEAREST
Jensen,
DISTANCE PROM PROPOSED* LOCATION TO NEAREST ÍTt'o'n°eirŠŸrifNE¿ti
ŒV$ N OF OGok•, GAS& MINING
OR POST
iso,, ir ..,, LOCATroN* ruon rnorosED DISTANCE COMPLETED, DRILLING, WELL, TO NEAREST Fr. ußSE. OR APPUED FOR, ON Tms
21.
ELEVATIONs
COUNTY
6200 '
ACRES
OF
IN
LEASE
PROPOSED
20.
ROTART
BIZE
HOLE
OF
CASING
WEIGHT
14" 9 5/8" 7"
12 1/4" 8 3/4"
CABLE TOOLS
OR
Well
this Development to drill It is proposed Formation. the Lower Green River test
Û
Attachments:
WORK
to a depth
gaa
Plat Program Drilling Class III Chevron Use Surface Multi
oftr: v
of
Procedure
Completion
DESCRIBE
SPACE
If proposal
/
A
Plan to be submitted
by Sundry
BTART*
1984
5900 ' to
acEENT .UTE
67 BOPE
WILL
OF C-MENT
QUANTITY
Certified
ABOVE
DATE
APPROI.
To Surface To Surface To Surface
50' 500' 5900'
36# 23#
Utah
PROGRAM DEPTEI
BETTING
BTATE
Rotary
AND CEMENTING
PER FOOT
R23E 13.
40
DEPTH
22.
CASING
River
.
T7S,
December
16"
IN
os
I
NO. OF ACBES ABBIGNED TO THIS WELL
5900 '
2500 '
WILDCAT
ower -Green
OR PARISH
17.
Unit
Within 19.
PROPOSED
zone.
OR
Uintah NO.
DF, RT, GR, etc.)
23. OF
x
22,
Sec.
GR 5652'
81EE
a
cD,2
12.
Utah 16.
18.
(Show whether
TOWN
POO
AND
Wash
Red
NWNW
DIRECTION
FIELD
11.
prod, sone
miles
±18 10.
locatiOn
(RepOrt
NO.
295 (11-228)
Denver,
FNL & 668'
906'
At proposed 14.
599,
Box
O.
4· |C
Inc.
OF OPERATOR
ADDBESS
P.
WELL
.
U.S.A.
Chevron
3 2 3 1
BLM
-
State
-
Partners
LRH 1-ALF
1 1 1 1
N tice.
-
-
-
-
-
-
LJT Field Sec.
724C
File
new productive zone and proposed is to deepen or plug back, give data on present productive PROGRAM : If proposal Give blowont give pertinent data on subsurface locations and measured and true vertical depths. or deepen directionally,
PROPOSED
is to drill
SInONEDOTOg
TTTLE
(This space for Federal
A
OVED
CONDITIONS
or State
OF APPROVAL,
ASSiStant
a
IF ANY :
CONT!028F APPROWi ATTACHER TDú?iMTOS'8 COPY
NOTICE OF A
varm
ofBee use)
TITI
Y
Bugin€€ring
DATE
NOV.
2, 198/4
CONDITIONSOF APPROVALFOR NOTICE TO DRILL
Chevron USA Inc.
Company Location Onsite
Sec. Inspection
22 Date
Well No.
T7S
R23E
Lease No.
295 (11-223) U-081
10-31-84
All lease and/or unit operations will be conducted in such a manner that full compliance is made with applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas Order No. 1, and the approved plan of operations. The operator is fully responsible for the actions of his subcontractors. A copy of these conditions will be furnished the field representative to insure 1. comp lance. ,
A.
DRILLING PROGRAM
1.
Estimated Depth of Zones of Interest All fresh water and prospectively valuable minerals (as described by 3LM at onsite) encountered during drilling, will be recorded by depth and adequately protected. All oil and gas shows will be tested to determine commercial potential.
2.
Pressure
Control
Equipment
BOP and choke manifold systems will be consistent with API RP 53. Pressure tests will be conducted before drilling out from under all Blowout casing strings which are set and cemented in place. the surface prior to drilling preventer controls will be installed casing plug and will remain in use until the well is completed or will be inspected and operated at least abandoned. Preventers
daily to ensure good mechanical working order, and this inspection will be pressure Preventers recorded on the daily drilling report. tested before drilling casing cement plugs.
The District with sufficient lead time, Office should be notified, in order to have a SLM representative on location during pressure
testing. 3.
Casing
Program and Auxiliary
Equipment
with sufficient lead time, Office should be notified, on location while running all in order to have a BLM representative casing strings and cementing. The District
4.
Mud Program and Circulating No chromate additives will Indian lands without prior protection of fresh water
Medium be used in the mud system on Federal SLM approval to ensure adequate
and
5.
Coring, Daily
officè
Logging and Testing
and completion drilling on a weekly basis.
Program
reports
shall
be submitted to this
Whether the well is completed as a dry hole or as a producer, Completion and Recompletion Report and Log" (Form 3160-4) will submitted not later than 30 days after completion of the well after completion of operations being performed, in accordance 43 CFR 3164. Two copies of all logs, core descriptions, core yses, we11-test data, geologic summaries, sample description,
"Well
be or with analand all other surveys or data obtained and compiled during the drilland/or completion operations, will be filed with ' ing, workover, and/or gases) will be Form 3160-4. Šamples (cuttings, fluids, submitted when requested by the authorized officer (AO). 6.
Other Conditions
for the Drilling
Program
or moved, no well will be plugged, No location will be constructed and no drilling or workover equipment will be removed from a well to be placed in a suspended status without prior approval of the are tó be suspended, prior approval of the A0 AO. If operations given before resumption of operawill be obtained and notification
tions. be reported orally to the A0 within 48 hours If the spudding occurs on a weekend or holiday, spudding. the report will be submitted on the following regular work day. The oral report will be followed up with a Sundry Notice. The spud date will
after
In accordance with Onshore Oil and Gas Order No. 1, this well will starting be reported on Form 3160-6 "Monthly Report of Operations",
with the month in which operations commence and continue each month until the well is physically plugged and abandoned. This report Office, 170 to the Vernal BLMDistrict will be filed, in duplicate, South 500 East, Vernal, Utah 84078. or fires, leaks, accidents, Spills, blowouts, Immediate Report: any other unusual occurrences shall be promptly reported in accordance with the requirements of NTL-3A or its revision. a If a replacement rig is contemplated for completion operations, for "Sundry Notice" (Form 3150-5) to that effect will be filed, of this approved plan prior approval of the AO, and all conditions are applicable during all operations conducted with the replacement
rig. the A0 completed for production, Should the well be successfully status. will be notified when the well is placed in a producting will be sent by telegram or other written communSuch notification ication, not later than 5 days following the date on which the well is placed on
Engineer, to NTL-28, with the approval of a District water may be temporarily disposed of into unlined pits for an of up to 90 days. During the period so authorized, application for approval of the permanent disposal method, along must be with the required water analysis and other information, Engineer. submitted to the District Pursuant produced a period
Pursuant to NTL-4A, lessees or operators are authorized to vent/ well evaluation tests, not exceeding a flare gas during initial of 50 MMCFof gas, whichever period of 30 days or the production Enmust be filed with the District An application occurs first. of gas beyond for any venting/flaring gineer and approval received, 30 day or authorized test period. the initial diagram as required A schematic facilities 3162.7-3, and 3162.7-4 shall be submitted trict Office within 30 days of installation All site security whichever occurs first. in 43 CFR 3162.7 shall be adhered to. All and leaving hydrocarbon storage tanks will accordance with 43 CFR 3162.7-4. A first
after
conference will be scheduled within of the first production notice.
production
receipt
by 43 CFR 3162.7-2, to the appropriate Disor first production, regulations as specified product lines entering sealed in be effectively 15 days
No well abandonment operations will be commencedwithout the prior approval of the AO. In the case of newly drilled dry holes or oral approval will be oband in emergency situations, failures, from the AO. A "Subsequent Report of Abandonment" Form will be filed with the A0 within 30 days following completion of the well for abandonment. This report will indicate where plugs were placed and the current status of surface restoration.
tained
3160-5,
Final abandonment will not be approved until the surface reclamation work required by the approved APDor approved abandonment of the A0 or his notice has been completed to the satisfaction representative, or the appropriate Surface Managing Agency.
Pursuant to Onshore Oil and Gas Order No. 1, lessees and operators to see that their explora.tion, development, have the responsibility operations are conducted in a manner and construction production, and which conforms with applicable Federal laws and regulations to the extent that such with State and local laws and regulations to operations on Federal or State and local laws are applicable Indian
B.
THIRTEENPOINT SURFACEUSE PLAN 7.
and Production
of Tank Batteries
Location
Facilities
con(on site for six months or longer) structures structed or installed (including oil well pumpjacks) will be non-reflective, earthtone color to match the stanpainted a flat, dard environmental colors, as determined by the Rocky Mountain 5 will be painted within Committee. All facilities State Interagency required to comply with Facilities 6 months of installation. 0.S.H.A. (Occupational Safety and Health Act) will be excluded. All permanent
Production
'collection
surface will be carried by an insulated station as indicated in the APO.
security guidelines tions will be adhered to.
All site
All off-lease
identified
flowline
to a
in 43 CFR 3162.7 regula-
measurement, or commingling onhave prior written approval from the A0.
storage, off-lease
lease or off-lease
will
will be installed for oil and gas measurement facilities Appropriate tests for meter accuracy will be conducted monthly for the first three months on new meter installathereafter. The A0 will be provided tions and at least quarterly and all meter calibration with a date and time for the initial A copy of the meter calibration future meter proving schedules. All meter Office. reports will be submitted to the Vernal District API for with the standards will conform measurement facilities natural gas for standard the AGA and liquid hydrocarbons measurement. Suitable
the well location.
8.
Source of Construction The use materials
3610.2-3.
9.
Methods of Handling Burning
will
Material
under BLMjurisdiction
will conform to 43 CFR
Waste Disposal
not be allowed.
Produced waste water will be confined to an unlined pit for a production. During the period not to exceed 90 days after initial for approval of a permanent disposal 90 day period, an application along with required water analysis, will be method and location, Failure to file an application submitted for the A0's approval.
within the time allowed will and will be grounds pliance,
be considered an incident for issuing a shut-in
of noncom-
10.
Well Site
Layout
topsoil will be stored as indicated in the layout The stockpiled there. About 4-6" of topsoil should be stockpiled diagram. Access to the well pad will be from the north corner at stake No. 2. This will allow Chevron to construct the pad with less disturbance to a buried waterline.
at least 11.
Plans
will be fenced with a wire mesh fence and topped with one strand of barbed wire.
pits
Reserve
for Restoration
of Surface
the location and surroundImmediately upon completion of drilling, trash and junk materials, ing area will be cleared of all debris, The reserve pit and that portion of not required for production. the location and access road not needed for production or will be reclaimed. production facilities Before
the location takes place, the repipe, etc. dry and all cans, barrels,
any dirt work to restore
serve pit must be completely will be removed.
is to be abandoned, then all disturbed to the approximate natural contours.
If the wellsite be recontoured
all Prior to reseeding, roads, will be scarified
disturbed and left
areas will
the access areas, including with a rough surface.
or drilled at a time specified by the BLM. or some other implement will be dragged over the seeded area to assure seed coverage. Seed will be broadcast a harrow If broadcast,
The following
seed mix will
Western wheatgrass wheatgrass Intermediate Smooth bromegrass Yellow sweetclover Fourwing saltbush 12.
Other
be used: 2 1bs./acre 2 1bs./acre 2 1bs./acre 2 lbs./acre
2 1bs./acre
Information
and/or workThere will be no deviation from the proposed drilling and over program without prior approval from the AO. Safe drilling All wells, whether drilling, must be observed. operating practices in accordance suspended, or abandoned will be identified producing, with 43 CFR
"Sundry Notice and Report on Wells" (Form 3160-5) will be filed for approval for all changes of plans and other operations in accordance with 43 CFR 3164. will
surface
contractor use plan.
Suitable
cultural
resource
The dirt
be provided
to the granting
prerequisite resources are found during A0 will be notified.
with an approved copy of the
clearances were required as a If any cultural of this permit. all work will stop and the construction,
be valid for a period of one year from the date will be After permit termination, a new application approval. future for approval any filed for
This permit
will
of
AND REGULATIONS
RULES
(Read Carefully) This application blank is to be used only for temporary change of point of diversion, place or nature of use for a definitely fixed period not to exceed one year. If a permanent change is desired, request proper application blanks from the State Engineer. Application for temporary change must be filed in duplicate, accompanied by a filing fee of gy.go Where the water affected is under supervision by the State Engineer, time will be saved if the appointed of a Water Commissioner, Application is filed with the Commissioner, the proposed change and forward both copies who will promptly investigate with filing fee and his report to the State Engineer. Applications Bled directly with the State Engineer will be mailed to the Water Commissioner for investigation and report. If there be no Water Commissioner on the source, the Application must be filed with the State Engineer. the change When the State Engineer Ands that the change will not impair the rights of others he will authorize to be made. If he shall find, either by his own investigation or otherwise, that the change sought might impair existing to be heard before rights he shall give notice to persons whose rights might be affected and shall give them opportunity acting upon the Application. Such notice shall be given five days before the hearing either by regular mail or by one publication Before making an investigation or giving notice the State Engineer will require the appliin a newspaper. cant to deposit a sum of money sufficient to pay the expenses thereof to:
Address all communications
Edate,Engineer State Capitol Building Salt Lake City, Utah
ENDORSEMENTS
ENGINEER'S
STATE
(Not to be filled in by applicant)
Change Application
No.
......................
.
.......
........................................
(River System)
by Water Commissioner
received
1. ................................Application
..........................................................
of Commissioner)
(Name
....ARecommeondration of 2.
....
.
Stat
.
3. ................................Fee
for filing
................................Application
.4
rn
$7.50 received
application,
returned,
5. ................................Corrected
with
application
letter, to
requested
7. ................................Fee
for investigation
S................
9. ................................Fee 10. ................................Fee
for giving
notice
$................
published
13. ................................Notice
of pending
14
Change
...............................
received
by
:
......................
,
Recommendations:
by
received by
Rec. No.
................
............................
.
Rec. No.................
........................:
pubhcation
by
............................................
..................................................................................
application
change
by
protested
application
,
for advertising
in.......
to State Engineer's Office.
$..............................
requested
12. ................................Notice
ter
co
.......
for correction.
......................................,
;
notice
approved
...
Rec. No.....................
........................;
..............................
for giving
11. ................................Application
Office by..
S..........
for investigation
made by
by
...........
over
resubmitted
6. ................................Fee
8. ................................Investigation
Engineer
mailed
to.interested
parties
by
............as
follows:
..........................................................................
(Date Received and Name)
.AHpepa1ricnation
116
r
.
d
17
THIS
2. 3.
y
./
....Change
ommended
arp
Application
IS APPROVED
APPLICATION
by
fo
g and returned
SUBJECT
..................................................................................... ..................
.........................
....
.
..
.
.
....
.
..
.................
.
to
........
.........................
........................................................
TO THE FOLLOWING CONDITIONS:
....
w/ok
MINING OFOIL,6ASAND DIVISION INFORMATIONAPI SPUDDIN6 CHEVRONOIL COMPANY
OFCŒPANY: NAPE
RED WASHUNIT #295
WFllNAME: NW NW 22
OWNSHIP
SECTION
7s
ÑANGE
23E
COUNTY
CONTRACTOR DRILLING RIG# SPÐDED:DATE
12-5-84 10:30
IIME ÑOW
AM
hole
Dry
digger
DRILLING WILLCOMENCE Manning
BY REPORTED
Tao
IELEPHONEÑ
702 641
DATF
#43-047-31577
-
Rig
#23
Tannean
12-7
wieg
es
SI6NED
Uintah
Form Approved. Bureau No.42-R1424
Form 9--331 Dec. 1973
Budget
UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY
5. LEASE
p.pgi 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 2· RUeN AGaRsEhEMENT NAME
SUNDRY NOTICES AND REPORTS ON WELLS or plug back to a different
(Do not use this form for proposals to drill or to deepen for•dtidli þ¾Ø reservoir. Use Form 9-331-C
1. oil well
gas well
8. FARM OR LEASE NAME
other
9. WELL NO.
(11-228)
295
2. NAME OF OPERATOR
Chevron U. S. A. Inc. 3.ADDRESS OF OPERATOR P. O. Box 599, Denver,
10. FIELD OR WILDCAT NAME
Red CO
80201
4. LOCATION OF WELL (REPORT LOCATION CLEARLY. See space below.) ' FNL & 668 ' FWL W AT SURFACE: 906 AT TOP PROD. INTERVAL: AT TOTAL DEPTH:
17
-
Lower
22,
Sec.
T7S,
12. COUNTY OR PARISH
Green
River
R23E 13. STATE
Utah
Uintah
-
14. API NO.
16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
43-047-31577 15. ELEVATIONS(SHOW DF, KDB, AND WD)
GR REQUEST FOR APPROVAL TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE CHANGE ZONES ABANDON* Spud Date Report (other)
Wash
11. SEC., T., R., M., OR BLK. AND SURVEY OR AREA
5652'
REPORT OF:
SUBSEQUENT
(NOTE:
Report results of multiple completion change on Form 9-330.)
or zone
17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, give subsurface locations and measured and true vertical depths for all markers and zones pertinent to this work.)*
Well was Drilling
spudded Inc.
at 10:30 a.m. Drilling Manning
5, 1984 by Bill on December move into Rig No. 23 will
Rat
Jr's
Hole
to
location
OL GAS& MINING Subsurface 18. I hereby
Set
Safety Valve: Manu. and Type
Ft.
@
ertify that the foregoing is true and correct TITLE
SIGNED (This BY APPROVED OF APPROVAL, CONDITIONS
Engineering
space for Federal
or State
office use) DATE
TITLE IF ANY:
*See instructions
December
Asst.DATE
on Reverse
10,
1984
Lease No. Communitization Field Name
UNITED STATES DEPARTMENTOF THE INTERIOR GEOLOGICALSURVEY (FORM 9-329) (2/76) 42-RO 356 OMB
linit
Agreement No. Red
Nama
Participating County
MONTHLY REPORT
U-08 1
Area Uintah Chevron
Operator
OF OPERATIONS
O Amended
Wash Utah
State Inc.
U.S.A.
Report
The following is a correct report of operations and production (including status of all unplugged wells) for the month December of 19 84 (See Reverse of Form for Instructions) ,
This report is required by law (30 U.S.C. 189, 30 U.S.C. 359, 25 U.S.C. 396 d), regulation (30 CFR 221.60), and the terms of the lease. Failure to report can result in the assessrm nt of liquidated damages (30 CFR 221.54 (j)), shutting down operations, or basis for recommendation to cancel the lease and forfeit the sond (30 CFR 221.53) Well No.
Sec. &
TWP
RNG
¼ of ¼
295 22 NWNW 7S (11-22 I)
7" et g.
23E
Well Status
WOCR
Days Prod.
•Barrels of Oil
•MCF of Gas
0
0
0
*Barrels of Water
0
Remarks
5907'
TD:
@ 5907
none, so state. DISPOSITION OF PRODUCTION (Lease, Participeting Area, or Communitized Area basis) *lf
*On hand, Start of Month *Produced *Sold *Spilled or Lost *Flared or Vented *Used on Lease *Injected *Surface Pits *Other (Identify) *On hand, End of Month
Gas
Water
(BBLS)
(MCF)
(BBLS)
0
xxxxxxxxxxxxxxxxx
0
0 0
0
0
XXXXXXXXXXXXXXXXX
xxxxxxxxxxxxxxxxx xxxxxxxxyyyyyyyyy 0
-
Address.
P.
0.
Page
Box
xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx
O
O 0
Assistant
xxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxx
gyggggggggggggggy
0
0 0
0 0 0
*API Gravity/BTU Conten
Authorized Signature: Title· Engineering
Oil & Condensate
0 0 0 gyggggggggggggggy
xxxxxyyyyyyyyyyyy 599,
Denver,
CO 80201
U-081
Lease No.
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT
Communitization Field Name Unit Name
Form 3160-6 (November 1983) (Formerly 9-329)
Red
Wash
ATPA
Ÿ8rtiCipating
Uintah Chevron
County
MONTHLY REPORT OF OPERATIONS
No.
Agreement
Operator O Amended
The following is a correct report of operations and production January of 19 85
Utah
State U.S.A.
Inc.
Report (including
status of all unplugged
wells)
for the mont'
,
(See Reverse
This report is required lease. Failure to report basis for recommendation Well No.
Sec. & ¼ of ½
of Form for Instructions) by law (30 U.S.C. 189, 30 U.S.C. 359, 25 U.S.C. 396d), regulation can result to cancel RNG
TWP
295 22 NWNw (11-223)
7S
23E
(43 CFR 3162.4-3),
of liquidated damages, (43 CFR 3160), in the assessment the lease and forfeit the bond (43 CFR 3160). Weil
Days
Status
Prod.
Complet:.ng
0
penalties,
'MCF of Gas
'Barrels of Oil
*If none, so state. Area, or Communitized DISPOSITION OF PRODUCTION (Lease, Participating
*On hand, Start of Month *Produced *Sold *Spilled or Lost *Flared or Vented *Used on Lease
*Surface Pits *Other (Identify)
*On hand, End of Month *API Gravity/BTU Conte Authorized Signature: Engineering Title: .
Title 18 U.S.C. Section United States any false,
0
0 xxxxxxxxxxxxxxxxx 0
1001, makes it a crime or fraudulent fictitious
×X×xxxxxxxxxxxxxx
0
0
O xxxxxxxxxxxxxxxxx O
xxxxxxxxxxxxxxxxx 0
-
P.
n.
Rox
Page to make and willfully knowingly for any person as to any matter statements or representations
xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxx> 0
0
Address: Assistant
Water
×X×xxxxxxx×X×X×X×
O 0
PB
(BBLS)
0 0
x×xxxxx××XX×xxx×x
5795'
Area basis)
O 0
*Injected
TD:
Gas (MCF)
0 xxxxxxxxxxxxxxxxx
Remarks
'Barrels
0
Oil & Condensate (BBLS)
the terms of the or down operations,
and
of Water
0
0
shutting
0 O xxxxxxxxxxxxxxxx,
xxxxxxxx,,,,,, Denver. 599, CO 80201 of
to any within
department
or agency
of the
Form 3160-5 (November 1983) (Formerly 9-331)
UN"ED STATES DEPARTMEW OF THE INTERIOR
maget Expires
4TE• re.
SUBMIT IN TRIP (Other instructio verse side)
5.
to drill or to deepen or plug FOR
PERMIT-"
for such
2.
O
NÃMB
OF
O
""'^"°""°•"""
to a
7. °w^."es
NO.
proposals.)
1. °w'à,,
1004-0135
AND SBBIAL
DESIONATION
"'"
WELLS SUNDRYNOTICESAND REPORTSON diferent back reservoir.
not tage this form for proposals Use "APPLICATION
No.
August 31, 1985
U-081
BUREAU OF LAND MANAGEMENT (Do
LEASE
tsureau
UNIT
AGEREMENT NAME
Red
orms. 8.
OPERATOR
FARM
Wash OB
LEASE
NAME
CHEVRON USA INC. 8.
ADDESUS
4.
BOX 599,
O. OF WELI,
LOCATION
9. WELL NO.
OPSEATOR
OF
P.
location
(Report
80201
CO
DENVER,
and in accordance
clearly
10. FIELD
See also space 17 below.)
at
(11-22B)
295 with any State requirements.•
AND
Red
.urrae•
11. sac., T., a., M., om BLE. AND senvarosamma
906'
FNL & 668'
FWL
NWNW
Sec. 14.
PsaMIT
15. ELEVATIONS
No.
(Show whether or,
aT,
22,
12. consor
on, etc.)
GR 5652'
T7S,
om rantaa
R23E
18. sTATE
Utah
Uintah
CheckAppropriate Box To indicate Nature of Notice, Report, or OtherData
is
NOTICE TEST
INTENTION
OF
BEUT-Orr
WATER
FRACTURE
PCLL
TO:
BHOOT
OR ACIDIEE
ABANDON*
WELL
CHANGE
DESCRIBE
Status
Report
PROPOSED
OR CO5fPLETED
work. If well to this work.) •
proposed
nent
is
SUBBBQUENT
OR ALTER
31ULTIPLE
TREAT
REPAIR
(Other) 17
OR WILDCAT
POOL,
Wash
CASING
REPAIRING
WELL
TREATMENT
ALTERING
CAalNG
BROOTING
OR ACIDIžING
ABANDONNENT*
(Other)
PLANS
(NoTs:
__ OPERATIONS
directionally
(Clearly drilled,
SBUT-OFF
FRACTURE
WATEE
COMPl.ETE
REPORT 07:
give
all pertinent details, and give locations and measured
state
Report results of multiple completion on Wel Report and Log form.) or Recorapletion pertinent including estimated date of starting any dates, depths true vertical for all markers and sones pertiand
Completion
subsurface
Manning set at 5907'. to a depth of 5900' with 7" casing Well was drilled Oil Well Service Western 28, 1984. on December Company Rig No. 23 was released will procedure Completion well for completion. move onto Co. Rig No. 18 will frac stimulations. and three in the Lower Green River consist of perforating
JJJ:pm 18. I hereby certify
that the to
---
oing is true and correct TITLE
SIGNED (This space for Federal
or State
APPROVED BT CONDITIONS OF APPROVAL,
Engineering
Assistant
gay,
January
31,
1985
ORee use)
DATE
TITLE IF ANY:
*Seeinsievesionson ReverseSde Title
18 U.S.C.
United
States
Section false,
any
1001, makes it a crime fictitious or fraudulent
for any person statements
and willfully to make knovfingly as to any matter or representations
to any department within
its
or agency
of the
er
N
SUBMIT UN TED STATES DEPARTMENT OF THE INTERIOR
3 0
DU
IN
et
E.
I
48E
BUREAU OF LAND MANAGEMENT
WELL:
O
IV
II.
b TYPE OF COMPLETlON: WaltK
NEW f.
WEI
2. NAME
7:t FN
Eit
In
*
O if
ÛtilPF
lit:Niit
OPERATOS.A.
OF
ADDRESS
N
FAIDI
.
..
UPERATOR
OF
or
I,oCATioN
(Report
«El.L
clearly
location
and
in accordance
906 ' FNL & 668 ' FWL
At surfac'
At top prod.
reported
interval
a
scith
nts)
I
NO.
PERMIT
DATE
12-5-84
DATE
21.
MD & TTD
OP
T.D.,
to prod.)
(Ready
COMPL.
Green
AND
OTMER
-S
IP MCI.Tirl.E MANT* HOW
RKB,
BOTTOM,
DEPTH
26 23 LINER TOP
SIžB
23.
INTERVAI.8 DRILLED BT
ROTARY
\
BET
(Report
all strings
HOLE
(MD)
Í
All
TOOLS
WAB DIRECTIONAL MADE SURTET
WAS
COBSD
WRI,L
set in seril) RECOR
CEMENTING
SIZE
TUBING
30. BACKS
(MD)
CEMENT*
SCREEN
sire end number)
(MD)
SIZE
DEPTM
PULLED
INTESTAL
attachment
see
RECORD BRT
UNT (MD)
PACEER
(MD)
5414 CEMENT
ACID. SHOT. FRACTURE,
82.
33.*
AMOUNT
250 sxs 1484
12½;" 8-3/4" 8-3/4"
DEPTH
Ah!OUNT AND
(MD)
ETC.
SQUEEEE,
EIND
OF
NÃTERIAL
STATUS
(PT
t'SED
attachnent
PRODFCTION FIRST
PRODUCTION
PRODUCTION
2-23-85 DATE OF
I
TEST
HOURE
3/4-7/85
(Flowing,
METHOD
CHOKE
BIEE
DISPOBITION
Sold
35. LIST
x 120"
PROD'N. FOR PERIOD TEST
72
TUREWe 9--55.
CAalNO
PRESBURE
CALCULATED 24-Hot a RATE
Oll.--BI..
OF GAS
pump)
WELL
Producing WATER-BBL.
I
|
176 GAB-MCF.
791
|
122
695
WATUR--BEL.
OIL
GRATITT-API
25
264
41
ef¢.)
(CORE.)
TEST
w!T.NESSBD
-T
Sustakowski
J.
ATTACEMENTS
acid
Perforation, 30. I hereby
GAS-OIL BATIO
,
R. OF
mging or
sketda)
GAS-3|CF.
I
|
Of
x 10
OIL-BBL.
50
(Sold, sagd for futi, vtsttd,
end typ¢
psimping-Bire
lift,
gas
1-3/4"
Pumping
TESTED
107 psi 34.
CABLE
25.
RECORD
BOTTOM
(MD)
(Intervel,
ascORD
TOOLS
TVD)•
2-7/8" A1. rearonArtos
CASINGHEAD
Yes
45' 515 5907 4843
36
7"
ELEV.
No
LE./FT.
WEIGHT.
STATE
Utah
I 19.
27.
CASING RECORD alzE
13,
tah
GE, ETc.).
RT,
R23E
T7S,
OR
Gr-
29.
FloW.
AND BURVET
GR 5652
COMPL.,
AND
(MD
NAME
22,
COUNTT
EL'N
LOGS
C
16" 9-5/8" 7"
DATR
River
River
2
see
WILDCAT
OR
Wash-Green
U
ELEVATIONS (DF,
18.
i 22.
MD A TVD
COMPLETION-TOP.
THIS
Lower
ELECTRIC
CABING
POOL,
SEC.. T.. R., M., OR BLOCK OR AftEA
12.
ISSUED
5795 INTERVAL(S),
5167-5640 TTPE
DATE
2-23-85 BACK
PLUG,
5907
20.
1Î.
REACHED
T.D.
12-25-84
PRODUCING
AND
Red
//- /S~Î
43-047-31577
24.
(11-22B)
FIELD
Sec.
18.
DEPTH,
NAME
GAS & MINING
SPLDDED
20. 1erAL
LEASE
DIVISION OF OIL
below
14
DATE
*
**
s.
Tl.
NWNW
At total depa
15.
NAME
Wash Uit
295 10.
4.
TRIBM
OR
---
RECEIVED
Inc·
3.
NO.
SERIAL
AN[>
ALI.OTTEE
"
Red
DIFF.
i i i G K
i
INDIAN,
NIT
O her
Day
DESit;NATiuN
U-081
WELL COMPLETION OR RECOMPLETION REPORTAND LOG * ta. †VPË OF
N31,11090845-0
rea
certify
that
the f
& frac
details
egoing and attached
information
is complete
TITLE
SIGNED
and correct
Permit
as determined
Title 18 U.S.C. Section United States any false,
1001,
makes
fictitious
it a crime or fraudulent
all available
Coordinator
(See Instructionsand Spaces fer Additional Data knowingly
from
on
records
March
DATE
29,
Revers. Side)
and willfully for any person to make statements or representations as to any matter
to any within
department its
or
agency
of the
1985
37.
w5875
3050
Surface
TOP
portus Numerous zones CNL-LDT Schlumberger
FM
River Fm.
Green
Wasatch
Fm.
Uintah
FORMATK)N
oc :ur
contents
through