DEPARTMENT OF THE INTERIOR a m" Dummie- m mm m

11 downloads 202 Views 6MB Size Report
DEPARTMENT OF THE INTERIOR a m" Dummie- m mm m. GEOLOGICAL SURVEY [1-08 1. APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK ...
Forrn (May

SUBMIT IN T (Other instructions reverse side)

9-881 C 1963)

UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL

TE*

Form approved. Budget Bureau No. 42-R1425.

on 5.

LEASE

SURVEY

APPLICATION FOR PERMITTO DRILL,DEEPEN,OR PLUG BACK TYPE

' """

OF WORK

DEEPEN O

DRILLE b.

TYPE

PLUG BACK O NNG

WAELL OTHER

UNLTIPLE

8.

e

Box

O.

599,

(Report

CATTI NœOF WELL

location

FNL & 668'

906'

ÇO

Denver,

clearly

to.

80201

and in accordane

with any

OR LBABB

DIVISION OF OIL

miles

±18

of Jensen,

southeast

FBÒM PROPUBED* TO NEAREST

DISTANCE LOCATION

18.

6200 '

LOCATION* DISTANCE FROM PROPOSED TO NEAREST DRILLING, COntPLETED, WELL, OR APPLIED FOR, ON THIS I.EASE, "·

(Show whether

21. ELEVATIONs

NO.

OF

IN

ACRES

Within 1Û. PROPOSED

LEAsa

NO. OF ACRES ABBIGNED WELL TO THIS

20.

noTAar

on

cABLE

SIZE

HOLE

OF

16"

is

test

OF

WEIGHT

CASING

14" 9 5/8" 7"

12 1/4" 8 3/4" It

to drill

proposed the Lower

Green

23#

River

Well

Development Formation.

Class

III

BOPE ,

Surface

Use

Plan

to be submitted

Procedure

Completion

ABOVE

DESCRIBE

SPACE

If proposal sentN oprog

is

PROPOSED

OIL ÛA g by

5900 ' to

ndry

AS, N

NING

' Notice.

productive PROGRAM : If proposal is to deepen or plug back, give data on present and measured and give pertinent data on subsurface locations directionally,

or State

3 2 3 1 1 1 1 1 1

-

-

-

BLM

state Partners

-

LRH

-

ALF

-

I

-

Field

-

Sec.

-

File

zone and proposed

true vertical depths.

Ëng

APPROV4T.

TITLE

BY OF APPROVAL,

IF ANY :

AS$ißtânt

û€€rin2

DAT.

office use)

NO

CONDITIONS

of

724C

new productive Give blowont

y

(This space for Federal

APPROVED

To Surface

to drill or deepen

TITLE

PERMIT

to a depth

OF CEMENT

To Surface To Surface

OF UTAH DIVISION OF

Plat Program

Chevron

zone.

QUANTITY

DEPTH

50' 500' 5900'

36# this

PROGRAM

APPAOVEDBYTHE STATE

Certified Drilling Multi

BETTING

PER FOOT

Attachments:

IN

1984

December AND CEMENTING

wn.r. armar•

DATE woaK

APraox.

GR 5652'

BIZE

TooLa

Rotary 22.

CASING

STATE

40

DF, RT, GR, etc.)

PROPOSED

13.

Utah

17.

Unit DEPTH

5900 '

2500 '

23.

R23E

T7S,

OR PARISH

Uintah 16.

utÏ'iine, « any, ÏÛo't'or oenarŠ"Iri's

River

a'°

22,

COUNTY

AT

-Green

.,wó'aiiir"¡ia'a

Sec.

Utah

OR W

700

SSh

12.

10.

AND

e

NWNW

FWL

NAME

1-228)

FIELD

11.

prod. zone

At proposed

NO.

Wash

FARM

29 P.

BERIAL

"'"

**"""""'

//ed

OF WELL

OWELLL

AND

U-081 IPINDIAN,ALIATTEMORTRIBBNÃm

0.

1a.

DNBIGNATION

DATF

DATE

Nov, 2,

984

T7 S

R 23 E

cuaùnowü.sMum. arà ma w.na...n.«,

S. L 6. & M

rr

295 (1/- 2ž B/, lóëated os shown in the NW 1/4 NW I/4 Section 22, T TS, R 23 E, S.L.S.a M. F

Uintoh

County

Utah.

,

WEST 80

.

14

RED WASH UN/T # 295

ess'

Elev.

Ground

Ungraded

(H 22 B) 5652' -

-

CÆRTIFICATE IS

THAS FIELD

TO

CERTIFY

NOTES

SUPERVISION BEST

OF

MY

TNAT

OF

ACTUAL

ANO

THAT

THE

KNOWt.fDGE

PLAT

ABOVE

TN£

SURVEYS

MADE

SAME AR€

AND

PREPAREO

WAS

BY

ME

TRUE

OR

UNDER CORWECT

AWO

FROM MY

TO

THE

BELIEF.

REGISTERED NO SURVEYOR REGISTRATION N2 2464 STATE OF UTAH

UINTAH 80.

R 0 BOX

10

N 89* 59' W

=

Section

Corners

Located

Q

-

a UTAH

SURVEYlNG

LAND

88 SOUTH

VÈRRAL,

200

-

-

=

10

1000'

PARTY

0.8. WEATH€R

Cold

/

30

REFERENCES

C.M.

GLO Plot

BFW FILE

EAST

84078

SCALE

1" X

ENGINEERINe

/ 84

DRTTJ.ING PROGRAM ATTACHMENT GENERAL REMARKS

1.

2.

Applicable

Federal of

The

rig operations

drilling

drilling

insure

to

well

3.

this

drilling

to

Prior

familiar

and

is

spud

to

level

be

commence. rig stays

the

with

will

Regulations

State

adhered

be

to

the

during

well.

the

over the

centered during

kelly

periodically

before of the

the hole drilling

level.

insure

toolpushers, the Chevron

all understand

and

and Check

drillers procedure

and crews for handling

are well

In H28 environments location contingency plan for your Chevron's understood All personnel are to be thoroughly read, and adhered to. system, of air with the use of air locations packs, the air supply what to do in the event of sour gas to surface.

thoroughly kicks. is to be familiar packs and

4.

and every Perform low seven days thereafter. Test BOPE before drilling out should pressure and high pressure test. High pressure test be test (200 psi) whichever of last string, casing pressure or 70% of burst 70% of BOPE working Federal and is less. Record BOP tests Reports. Notify applicable on Tour in advance of BOPE tests and record Agencies Regulatory State 24 hours notification and names on Tour Reports.

5.

Do not

6.

Separate size drill

7.

reuse

full opening pipe in use.

Replace

safety Test

with

BOP controls

9.

Hold Tour

pit

are

drills

to remain for

each

new

valves

and

weekly

with

Run full open valve below kelly that Do not use this valve as a mud saver

8.

10.

gaskets.

ring

in the crew

inside BOPE.

Bx ring BOP's

are

the

hole

in

can be run

gaskets. for

required

if

each

necessary.

sub.

position

open least

at

Rx or

once

during every

operations.

drilling seven

days

and

record

on

Reports.

On trips fill stds of drill up and monitor

11.

Use drill wise.

12.

Have wear to remove

pipe

ring wear

before the annulus pipe, whichever is at all times. floats

at

installed before

ring

all

hydrostatic pressure drops 75 psi first. Use trip tanks to measure

times

unless

before wellhead or running casing

in

your

supervisor

instructs

tripping or rotating. BOPE. testing

when

or every 5 fill-

hole

other-

Remember

13.

Casing

rams

running

14.

15.

Run pilot slurries Casing

to

be

installed

and

prior

and

tested

bonnets

time tests operations.

thickening to cementing

should be to drilling

prior

pressure 16.

are

on

last

trip

water

for

out

before

all

cement

casing.

tested to out and your supervisor

with

Drill out stabilization

17.

Do not

drill

18.

Do not

run

19.

When necessary not considered

20.

Install otherwise

21.

Fully

slick beneath to be picked with

full

describe

casing

pipe

to work pipe, sufficient.

damaged

mixing

0.2

psi/ft.,

whichever

Tour Reports. DM-49 before

is

Discuss

greater, the test

testing.

Drill

string.

lost

inside Run

keep

lubricator

or

or

rig

deep

enough

to

bury

up.

stabilizers.

and test full by supervisor.

psi

recorded on and reference

each

hardbanded gauge

1,500

with

pipe

on

equipment

of casing. stabilizers moving

all

up

1/16" and

logging

on Tour

Reports.

down.

runs

to 1/8"

undergauge.

Rotating

unless

alone

instructed

is

$ A ML

DRILLING PROGRAM

Field

Red

Wash

Location

Section

Drill

X

Well RWU 295

Unit

22.

906'

FNL,

Hole

Hintah

nenh

Conney,

56599

GL

KB

94999

sqqqr

TD Max. Angle Bearing

qqnar

TVD_

Avg. from

p

Angle

Surface

Hole

Surface

Proposed

16"

Depth

Casing

50'

Size,

Weight

& Grade

gn

Hole

Hole Size Mud Program:

Potential

Electric Core/DST

Proposed 12¼" Type

Depth MW

Hazards: Logging Program:

None

Program:

None

BOPE

500'

None WL

FV

Other

None

Program:

Size

Grade

9-5/8"

K-55

Cement

FWL,

Measured

Proposed

Hole: Build

Size

Casing

668'

Elevations:

Location

1. Conductor

2.

R23E.

Deepen

Directional/Straight KOP Target

T7S.

Exp/Dev

(11-72R3

Lead Slurry Tail Slurry hrs.

Program:

WOC Time

6

Weight 36#/ft

01899

'H'

Casing

Test

w/77

08012

1500

¯

Thread

Section

ST&C

500'

' " psi

Length

SYS

Shoe

test

MWE

g 4

(Static) 3.

Intermediate

Hole

Hole Size Mud Program:

N/A Proposed

Type

Potential Hazards: Electric Logging Core/DST Program: Casing Program:

Grade

Program:

Lead

Tail WOC Time

FV

Other

WL

Program:

Size

Cement

BOPE

Depth MW

Slurry Slurry hrs.

Weight

Casing

Test

Section

Thread

psi

Shoe

test

MWE

Length

ppg

Page

2 Program RWU 295

Drilling Well

4.

Hole

String/Liner

Oil

Hole Size R-3|& Type Mud Program: Gel-Water Gel-water-Cham

Lead Tail

Program:

WOCTime

12

5. Auxiliary

TIT

-

10 from 3000'

circulation DIL-MSFL-SP, None

ima

h

en

to

500' 2500'

EPT,

73#ffy

T.The

23#/ft

T.T&c

Test

-

Tp

Mierning

DPT,

Section

Thread

Low Penairv Filler Class 'H' Tailored

UP

T.n.

LDT-CNT.-GR-CAT,

Weight

Casing

4500'

pmi

3000

Other 2500'

-

-

-

/.n

Slurry

Clamm

sonn' surf

-

-

Length

Rannt

sonn'

Cmt for

Depth

& Temp

Psi

7000

Equipment

Mud Logging

Unit

Geolograph Visulogger

Adj.

Chevron

WL

FV

+4.0

Slurry hrs.

BOPE

5900'

MW 6

+8

Hazards: Potential Lost Electric Logging Program: Core/DST Program: Casing Program: Grade Size N-SO 7" K-55 7" Cement

Depth

Proposed

Choke

@ @ @ @

PVT & Flowmeter @ Tank Trip @ Other: Full Opening

2000'

Rotating

Spud

Degasser

Head

Desilter Centrifuge Mud Cleaner H2S Safety

-

500' Spud Spud D.P. Safety

Inside

Valve,

BOP,

@ @

-

3000'

spad

@ @ Equip.

Upper

-

sppå

@

& T.nwar

_

Re11ey

Cock

Un1va

from

ßpud, 6.

Drill

String

Design

Hole: Surface BRA 12¼" bit, Drill Pipe 4½"

BHA

BHA Drill

DC.

XO Stah,

6-3/4"

DC's

E

µ(A Pipe

String/Liner

Oil

?-8"

00, Stab.

Hole:

Intermediate Drill

1-8" 16,60#

Pipe

Hole:

8-3/4" 4½",

6-3/4" 16.60#

þit,

pc's F,

7. Other Inspect BHA after run holes In "straight" Gyro Surveys N/A

Check Fill

8.

breaks drilling drill pipe every

General

rotating

ÿ00 inclination for

flow 20

surveys

below stds

hours. every

3 000 when running

+son

feet.

feet. float.

Remarks

Attached

9. Geologic PreAt

Program

ch Date

/

Drilling

Superintendent

Date

GEOLOGIC PROGRAM Field/Area

peg past

Well

RWU #295 (11-22B)

Name

Location:

Elevation:

Total

Depth

Objectives:

Coring: Interva1/on Interva1/on Interva1/on Interval/on Interval/on Drill

Sec 97 Co thn‡ak Surface 906' Bottom Hole GL estimated IB estimated

Primary Secondary

show show show

10)

11)

FNL.

79 State 668 FWL

Range

RW

fu

A

Development

pay

µ+44 NWkrNWh

56979

Surveyed Surveyed

5645' 5665' TD

Em at

fa

Green

56

pt

River

Green giver None

Formation None

Estimated

Amount

Depth

show show

pope

2-man FID unit from 2000 to T.D. (possible comouter attachments pending

Electric logging: 1) DIL-SP 2) DIL-MSFL-8P 3) BBC w/GR, Ca1. 4) LDT-CEL w/GR, Cal. 5) FDC-CEL w/GR, Ca1. 6) Dipmeter 7) Velocity survey 8) RFT

9)

TUP

5990

Stem Testing

Mud Logging

Exp1/Dev

$

Surface

resulta

RWH 2913

Intermediate

Depth -

to TD

Casing -

2000

to TD -

-

-

-

EPT

4650 4650 4650

DPT Microlog

All runs from TD to either base log run unless otherwise noted.

Total

of surface

casing

or overlap

with

to TD

to TD to TD previous

A

DJ

GEOIDGIC PROGRAM(Continued) Tops: Formation Hintah Green

River

F

G

R

Log Depth,

datum

5381'{+284) 5510'(+155) 5762'(-97) 5900'

K

L TD

1)

Sample Depth, datum

5099'(+¶66)

I J

Correlation

Estimated Depth, datum Surface 3059'{+2606) 4441'{+1224) 4669'(+996) 4902'{+763)

Wells: Correlative Zones Em Interval

RWU #129 & 63

with

Subject

Nell

Primary objective zones to be cored. Zone to be DST.

2)

Fyn #6 & 99

Primary objective zones to be cored. Zones

DIVISION OF INTEREST: Working Interest Partners: Chevron gyl Sulf Caulkins

Others

122

0MI Receiving

Buttram

to be DST.

0 gi

Data:

REHARKS:

Prepared

Reviewed

by by

Formation Approved

Date Date

D. M. Thompson Evaluation

Analyst Date

Oçtober

3,

1984

H

FLOW LINE

FIGURE

FILL

4 THREE PREVENTER HOOKUP CLASS 111

UP LINE

(PRESSURE RATING 3-5000

PSI AS REQUIRED)

ANNULAR PREVENTER

EMERGENCY FLOWHOOKUP

ALTERNATE CHOKEMANIFOLO

HYORAULICVALVE

CHOKE "O,, ADJUSTABLE

BLIND RAMS 2"-4"STEEL VALVES

2" FLANGED STEEL VALVE 4"STEEL VALVE

4" LINE

"8 ORILLING

"E-

/

SPOOL I

3"or4"STEELVALVE

. .

mittE DalLUNG,80TH VALVESAREKEFTCLOSED

ll

DRILL PIPE RAMS

2"FLANGED STEEL VALVE

--

C

FLANGEO STEELCROSS

2° FLANGEOSTEEL VALVE

"D" LONGPOSITIVECHOKE 08 ADJUSTABLE

3"or4"STEELVALVE

~2'

' FLANGED STEEL

VAt.VE LONGPOSITIVECHOKE OR ADJUSTABLE

AN EXTRA SET OF DRILL PIPE RAMS AND BONNET SEALS WILL BE ON LOCATION AT ALL TIMES.

2" STEELVALVEg CASINGSPOOLSHOULDBE POSIT10WED SO THATTHESE VALVESAREOtBECTLYUNDER THEBARRELOF THERAM PalvENTER.

"0•• ADJUSTABLECHOKE

coENssunEGNAUGE

ChevronU.S.A.Inc. ROCKY

MTN,

PRODUCTION

DIVISION

LE 81-7511 Revision 4

CHEVRONU.S.A. INC. RED WASHUNIT 295 (11-228) SEC. 22, T78, R23E UINTAR COUNTY, UTAH MULTIPOINT SURFACE USE PI.AN

1.

EXÌSTING

A.

ROADS

See

Topo

improve B.

From

State road, road 2.

maps "A" and upon any existing

"B". state

We or

do

not county

Utah, take U.S. Hwy. 40, On Hwy. 45 go 19.3 miles Hwy. 45. take this road east for 2 miles. 150' long will be constructed south Vernal,

plan

to

change,

travel east for 3 miles to southeast to a paved county At this point, an access into the well site.

location is going to be adjacent to the existing road. and planned roads in the Unit Existing will be accordance with Bureau of Land Management standards.

"B".

A. B.

C. D.

E. F. G.

See Topo maintained

Width: Maximum width 30' with an 18' travel area. Maximum Grade: 8% if necessary.. Turnouts: None, avoid blind corners. Drainage Design: Roads to be placed and constructed so that drainage alterations will be made. Water will be diverted well pad as necessary. No major and fills. cuts Materials: Surfacing Gravel if necessary (see item 6-A). Other: No gates, cattleguards or fence cuts. Culverts installed where necessary.

Map in

minimal

around

to

be

LOCATION OF EXISTING WELLS See Exhibit

4.

or

PLANNED ACCESS ROADS

The

3.

alter

roads.

"D".

LOCATION OF EXISTING AND/OR PROPOSED FACILITIES

A.

See Exhibit

B.

Install from subject 1,100' new flowline well to collection station C" as shown on Exhibit Flowline will "D". be 3" plain end welded line pipe, placed on supports on the surface. Normal construction procedures will be used. When warranted, fences, flagging, etc., powerwill be used to protect animals. We will install an electric line from the well to an existing powerline 350' north as shown on Exhibit

C.

Disturbed

to

as

returned scribed

"D".

"D".

areas no original to original by BLM

near

longer state state

needed for operations will be graded back as possible. Drainage channels will be and the areas will be reseeded as pre-

MULTIPOINT SURFACE USE PLAN RED WASH UNIT 295 (11-228)

Page

5.

2

D.

A blooie south of

E.

A line heater will be required About 100' of access will be This will be adjacent to the flowline from this well.

pit 8' X 10' X 5' deep will be constructed to 150' the center hole as shown on Exhibit "C". A line will placed on the surface from the center hole to the burn pit. The will be fenced on four sides to protect livestock.

for the production from this well. needed to service this line heater. pad and placed along the production

LOCATION AND TYPE OF WATER SUPPLY A.

to the location will be piped through line from the appropriate collection station water line. This line will temporary be removed after completion operations.

Water

supplied

surface

6.

a temporary or nearest drilling and

SOURCE OF CONSTRUCTION MATERIALS

A.

7.

the be pit

All land is Federal land. All gravel, cement, needed on the etc., access road and location will come commercially from the Vernal, Utah area. Access road needed is shown on Topo map "B".

METHODSFOR HANDLINGWASTE DISPOSAL A.

Cuttings will be settled out in the reserve pit. The reserve pit be unlined. be fenced It will with a wire mesh fence, topped at least one strand of barbed wire.

will with

B.

Drilling

fluids

recirculation liquid waste deep subsoil

natural

be retained in reserve tanks utilizing maximum operations. drilling Following drilling, the will be evaporated worked and the remainder into the of the pit, and the pit filled in and returned to will during

grade.

C.

the event fluids are produced, any oil will be retained until sold in tankage and any water produced will be retained until its quality is determined. The quality and quantity of water produced will then determine the necessary disposal procedure.

D.

Sewage will be disposed of in a 1,000 gallon fiber glass holding tank, which is to be placed in the vicinity of the on the well location. Arrangements have been made for the be transported from the wellsite to the City of Vernal, disposal in the city disposal system. The sewage will be an authorized firm. hauling

E.

In

Trash

will

periodically

be contained in a portable to an approved disposal

metal

container

insulated trailers sewage to Utah for hauled by

and

hauled

MULTIPOINT SURFACE USE PLAN RED WASH UNIT 295 (11-228) Page

3

F.

8.

After the be removed

10.

11.

the

all

wellsite, dump.

waste

to good roads and relatively ancillary facilities with the on the drilling location.

accessibility

trailers

no need to be located

WELLSITE

LAYOUT

will

material

for

close exception

housing, of two

A.

Between four and six inches of topsoil will be removed from the location and stockpiled. Location of mud tanks, reserve, burn and trash pits, pipe racks, living facilities and soil stockpiles will be located as shown on Exhibit "C".

B.

Pits

will

not

be lined.

PLANS FOR RESTORATION

OF SURFACE

A.

All surface areas not required for producing operations will be graded to as near original condition as possible and contoured to maintain possible erosion to a minimum. Any rock encountered in excavation will be disposed of beneath backfill to return surface to its present appearance and provide soil for seed growth.

B.

The topsoil will be evenly distributed Reseeding will be performed as directed

C.

Pits and livestock

any will

other area be fenced

D.

Any oil flagged

E.

The well will be completed mence following completion dance with BLM requirements,

accumulation as dictated

over the by the BLM.

that would present off when the rig is

on the pit will by then existing during of the

a hazard released

be removed, conditions. 1985. well,

disturbed

to wildlife and removed.

burned

Rehabilitation reseeding to

areas.

or

overhead

will be

or

in

comaccor-

SURFACE OWNERSHIP

A.

12.

from the disposal

ANCILLARY FACILITIES Because of we anticipate

9.

has moved to an approved

rig

The wellsite, constructed

access roads, flowlines on BLM owned surfaces.

and

powerlines

will

all

be

OTHER INFORMATION

A.

well is located on hilly and rocky terrain. Vegetation consists of Juniper sagebrush, prickly pear and various grasses on and around the locations. The soil is a poorly developed, semi-arid, thin topsoil layer over the Uintah

The

MULTIPOINT SURFACE USE PI.AN RED WASHUNIT 295 (11-228)

4

Page

13.

B.

Surface livestock

C.

There are no water bodies There are no archaeological, area. An archaeological inspection and no cultural

activities other grazing as assigned

use

than the by BLM.

oil

well

facilities

consist

of

or

occupied dwellings near the wellsite. historical or cultural sites in the walk through was made during the onsite resources were found.

COMPANYREPRESENTATIVE Mr. B. L. Haynes P.O. Box 599

Denver, CO 80201 (303) 691-7527 I

hereby

certify that I, or persons under my direct supervision, have the proposed drillsite and access route; that I am familiar with the conditions which presently exist; that the statements made in this plan are, to the best of my knowledge, true and correct; and, that the work associated with the operations proposed herein will be performed by Chevron U.S.A. Inc. and its contractors and subcontractors in conformity with this plan and the terms and condit ons under it is app which

inspected

.

Date

B. L. Drilling

LLK•mm

Map "A" Map "B" Exhibit Exhibit

-

-

Proposed Current

"C" "D"

-

-

Location & Proposed

Location Existing

Access

Roads

Layout and Cut and Fill Wells and Existing and Proposed

Haynes Manager

U.S.A. INC. S) .R.U. * 299 (11-ZZ PROPOSED LOCATION HEVRON

TOPO.

MAP"A"

548

5//7

Com --.-

O

o

s

eso.. adm

'·,



INC. U.S.A. CHEVRON e295O1-22 6) W.R.L). LOCATION PROPOSED

"

MAP B

TOPO.

"

SCALE Is ac ro Ught duty road, all

.r

weather,

Untmprovedroad fair or dry

..U

VE

LUNr» FLut05

15

og.

El

DA

ErrA.

C/3

S+ 75

toë¾

CALE

449 Sott.s No

=

LITwot.o -

so

APPRo

DAGE.S

Ca.Yos.

stALE

Lt

.

INC. U.S.A. RED WASH UNIT 295 (11-228) SEC. 22, T7S, R23E UINTAH COUNTY, UTAH

CREVRON

|-268

/

13-278 44 -

y;

PA

R

44-278

irr

'i4-

CENTRAL BATTERY

)

1954

27s

*

,

!4-268.

-

"D"

2.

-

-

-

-

-

p -

--

-·-

-

PROPOSED

-PROPOSED

POWER LINE FLOW

OPERATOR

C

DATE

-.ZZ

WELLNAME

gÑÁ/ld9

SEC

/2

T

I‡3 of 7

-

S

R

COUNTY

3/677

4

eg

AAI NUIER

TYPE OF LEA$E

CHECKOFF: AT

D

NEARESTWELL

ASE

TASHOR OIL SHALE

PROCESSINGCOMMENTS:

APPROVALLETTER:

SPACING:

c-3-a

-3

UNÏT

c-3-b STIPULATIONS:

11/2/84

CAUSENO. & DATE

c-3-c

rvar

sua i

I

42 42

381 382

50 SHEETS 5 SQUARE 100 SHEETS 5 SQUARE 200 SHEETS 5 SQUARE

\

N

/

November

13,

1984

U. S. A. Inc.

hevron

P. D. Bo× 599 Colorado Denver,

80201

Gentlemen: (ll-22B) Well No. Red Wash Unit #295 Re: 9Õgi~FNL, 668' FWL Uintah County, -

NWNW Sec. Utah -

22, T. 7S,

R. 23E

granted in the above referenced oil well is hereby Approval to drill amended 1983; and as Utah Code Annotated, 40-6-18, with Section accordance Practice Rules of and Regulations on Rule A-3, General Rules andstipulations: predicated to the following subject and Procedure, receipt by the Division of Prior to commencement of drilling, 1. of an adequate and approved supply of assurance evidence providing water. comply with this the following actions are necessary to fully In addition, approval: to the Division within 24 hours after drilling Spudding notification 1. operations commence. 2.

3.

4.

Submittal Encountered

to the Division During

of completed

Form OGC-8-X, Report

of Water

Drilling.

that its to the Division should you detetermine notification Notify John R. Baza, to plug and abandon this well. necessary (Home) 298-7695 or 538-5340, (801) (Office) Engineer, Petroleum (Home) 571-6068. Director, Associate R. J. Firth, of Rule C-27, and regulations Compliance with the requirements Oil and Gas Regulations, and Rules General Gas Flaring, Associated

Prompt

Chevron U. S. A. Inc. Well No. Red Wash Unit November 13, 1984 Page 2

5.

#295 (11-228)

unless issuance This approval shall expire one (1) year after date of application is underway or an operation substantial and continuous date. approval expiration the to prior made is for an extension

The API number

assigned

to this well is 43-047-31577.

Associate

E

có:

ures Branch

of Fluid

Director,

Oil & Gas

Scott M. Matheson, Governor Temple A. Reynolds, Executive Director Dee C. Hansen, State Engineer

STATE OF UTAH RESOURCES & ENERGY NATURAL

.

Water Rights

23 Eost Moln Street• P.O. Box 879 Vernal, UT84073•801-789-3714 -

November 13, 1984

NOV20 1984 DIVISION OF OIL,GAS& MINING Chevron U. S. A. Inc. P. 0. Box 599 Denver, Colorado 80201 RE: Temporary Change 84-49-78 Gentlemen: The above numbered Temporary Change Application approved, subject to prior rights. A copy is herewith future

has been

returned to you for your records

reference.

Robert F. Guy for Dee C. Hansen, P. E. State Engineer DCH:RFG/1n Enclosure

cc: 011, Gas & Mining Salt Lake City,

Utah 84114

Deputy State Engineer/Earl M. Stoker an equal opportunity employer

Area Engineer/Robert -

please recycle

F. Guy

and

Form Approved. Budget Bureau No. 42-RI424

Form 9-331 Dec. 1973

UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICALSURVEY

5. LEASE

p-ogi 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENTNAME

SUNDRY NOTICESAND REPORTS ON WELLS sais to drill or to deepen B þ

(Do not use this form for pro Use Form 9-331-C

1. oil well

gas well

Ë

Red

or plug back to a different

r•dtigli

reservoir.

other

9. WELL NO.

(11-228)

295

2. NAME OF OPERATOR .

Red Wash

-

Lower

22.

Sec.

T7S.

River

R23E 13. STATE

12. COUNTY OR PARISH

Uinteh

Utah

14. API NO. Not yet assigned 15. ELEVATIONS(SHOW DF, KDB, AND WD)

16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA REQUEST FOR APPROVAL TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE CHANGE ZONES

Green

11. SEC., T., R., M., OR BLK. AND SURVEY OR AREA

AT TOP PROD. INTERVAL: AT TOTAL DEPTH:

13 Point

r

10. FIELD OR WILDCAT NAME

Chevron U. S. A. Inc 3. ADDRESS OF OPERATOR CO 80201 P. O. Box 599, Denver, 4. LOCATION OF WELL (REPORT LOCATION CLEARLY.See space 17 below.) ' FNL & 668 ' FWL (NWNW) AT SURFACE: 906

ABANDONRevise

Wash

8. FARM OR LEASENAME

SUBSEQUEN

NOV2 31984=••

== or--w•-='•=--• change on Form 9-330.)

DMSIONOF L GAS&WNNG

Plan

17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, give subsurface locations and measured and true vertical depths for all markers and zones pertinent to this work.)*

5.

LOCATION AND TYPE OF WATER SUPPLY A.

Water

B.

will to the location collection station.

supplied

appropriate

the Water roads

will be transported in the area.

over

be hauled

existing

from

by truck

and proposed

access

LLK:st1

Set

Subsurface Safety Valve: Manu. and Type 18. I hereby certi

hat

the foregoing

SIGNED

BY CONDITIONS OF APPROVAL, IF ANY:

Ft

is true and correct TITLE

Engineering

(This space for Federal APPROVED

@

egy,

or State office use) DATE

TITLE

*See instructions

Asst.

on Reverse

Nov.

21,

1984

SUBMIT IN TRIPÍCATE*

'°'"X'""""U'°""

UNITED STATES DEPARTMENT OF THE INTERIOR

5.

b.

OF WORK

or

TYPE

PLUG BACK O

DEEPENO

DRILLE AL

.

No. 4&R1425.

DNBIGNATION

AMD BERIAI.

MO.

G.IFINDIAN,ALLOTTEROBTRIBENAME

'l. UND

AGREMNT

Red

Wash

wmLL UNLTH LE

NNELE

GWAE I,

ag.m

U-081

APPLICATION FOR PERMIT TO DRILL,DEEPEN,OR PLUG BACK TYPE

I»EASE

SURVEY

GEOLOGICAL

la.

Porm

"""

*"

NAME

OTHER

OPERATOR

3.

I NœOF WELL

DISTANCE

FWL

CO clearly

10.

80201

y Sta

and in accordance

IN

MILES

AND

FROM

of

southeast

NEAREST

Jensen,

DISTANCE PROM PROPOSED* LOCATION TO NEAREST ÍTt'o'n°eirŠŸrifNE¿ti

ŒV$ N OF OGok•, GAS& MINING

OR POST

iso,, ir ..,, LOCATroN* ruon rnorosED DISTANCE COMPLETED, DRILLING, WELL, TO NEAREST Fr. ußSE. OR APPUED FOR, ON Tms

21.

ELEVATIONs

COUNTY

6200 '

ACRES

OF

IN

LEASE

PROPOSED

20.

ROTART

BIZE

HOLE

OF

CASING

WEIGHT

14" 9 5/8" 7"

12 1/4" 8 3/4"

CABLE TOOLS

OR

Well

this Development to drill It is proposed Formation. the Lower Green River test

Û

Attachments:

WORK

to a depth

gaa

Plat Program Drilling Class III Chevron Use Surface Multi

oftr: v

of

Procedure

Completion

DESCRIBE

SPACE

If proposal

/

A

Plan to be submitted

by Sundry

BTART*

1984

5900 ' to

acEENT .UTE

67 BOPE

WILL

OF C-MENT

QUANTITY

Certified

ABOVE

DATE

APPROI.

To Surface To Surface To Surface

50' 500' 5900'

36# 23#

Utah

PROGRAM DEPTEI

BETTING

BTATE

Rotary

AND CEMENTING

PER FOOT

R23E 13.

40

DEPTH

22.

CASING

River

.

T7S,

December

16"

IN

os

I

NO. OF ACBES ABBIGNED TO THIS WELL

5900 '

2500 '

WILDCAT

ower -Green

OR PARISH

17.

Unit

Within 19.

PROPOSED

zone.

OR

Uintah NO.

DF, RT, GR, etc.)

23. OF

x

22,

Sec.

GR 5652'

81EE

a

cD,2

12.

Utah 16.

18.

(Show whether

TOWN

POO

AND

Wash

Red

NWNW

DIRECTION

FIELD

11.

prod, sone

miles

±18 10.

locatiOn

(RepOrt

NO.

295 (11-228)

Denver,

FNL & 668'

906'

At proposed 14.

599,

Box

O.

4· |C

Inc.

OF OPERATOR

ADDBESS

P.

WELL

.

U.S.A.

Chevron

3 2 3 1

BLM

-

State

-

Partners

LRH 1-ALF

1 1 1 1

N tice.

-

-

-

-

-

-

LJT Field Sec.

724C

File

new productive zone and proposed is to deepen or plug back, give data on present productive PROGRAM : If proposal Give blowont give pertinent data on subsurface locations and measured and true vertical depths. or deepen directionally,

PROPOSED

is to drill

SInONEDOTOg

TTTLE

(This space for Federal

A

OVED

CONDITIONS

or State

OF APPROVAL,

ASSiStant

a

IF ANY :

CONT!028F APPROWi ATTACHER TDú?iMTOS'8 COPY

NOTICE OF A

varm

ofBee use)

TITI

Y

Bugin€€ring

DATE

NOV.

2, 198/4

CONDITIONSOF APPROVALFOR NOTICE TO DRILL

Chevron USA Inc.

Company Location Onsite

Sec. Inspection

22 Date

Well No.

T7S

R23E

Lease No.

295 (11-223) U-081

10-31-84

All lease and/or unit operations will be conducted in such a manner that full compliance is made with applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas Order No. 1, and the approved plan of operations. The operator is fully responsible for the actions of his subcontractors. A copy of these conditions will be furnished the field representative to insure 1. comp lance. ,

A.

DRILLING PROGRAM

1.

Estimated Depth of Zones of Interest All fresh water and prospectively valuable minerals (as described by 3LM at onsite) encountered during drilling, will be recorded by depth and adequately protected. All oil and gas shows will be tested to determine commercial potential.

2.

Pressure

Control

Equipment

BOP and choke manifold systems will be consistent with API RP 53. Pressure tests will be conducted before drilling out from under all Blowout casing strings which are set and cemented in place. the surface prior to drilling preventer controls will be installed casing plug and will remain in use until the well is completed or will be inspected and operated at least abandoned. Preventers

daily to ensure good mechanical working order, and this inspection will be pressure Preventers recorded on the daily drilling report. tested before drilling casing cement plugs.

The District with sufficient lead time, Office should be notified, in order to have a SLM representative on location during pressure

testing. 3.

Casing

Program and Auxiliary

Equipment

with sufficient lead time, Office should be notified, on location while running all in order to have a BLM representative casing strings and cementing. The District

4.

Mud Program and Circulating No chromate additives will Indian lands without prior protection of fresh water

Medium be used in the mud system on Federal SLM approval to ensure adequate

and

5.

Coring, Daily

officè

Logging and Testing

and completion drilling on a weekly basis.

Program

reports

shall

be submitted to this

Whether the well is completed as a dry hole or as a producer, Completion and Recompletion Report and Log" (Form 3160-4) will submitted not later than 30 days after completion of the well after completion of operations being performed, in accordance 43 CFR 3164. Two copies of all logs, core descriptions, core yses, we11-test data, geologic summaries, sample description,

"Well

be or with analand all other surveys or data obtained and compiled during the drilland/or completion operations, will be filed with ' ing, workover, and/or gases) will be Form 3160-4. Šamples (cuttings, fluids, submitted when requested by the authorized officer (AO). 6.

Other Conditions

for the Drilling

Program

or moved, no well will be plugged, No location will be constructed and no drilling or workover equipment will be removed from a well to be placed in a suspended status without prior approval of the are tó be suspended, prior approval of the A0 AO. If operations given before resumption of operawill be obtained and notification

tions. be reported orally to the A0 within 48 hours If the spudding occurs on a weekend or holiday, spudding. the report will be submitted on the following regular work day. The oral report will be followed up with a Sundry Notice. The spud date will

after

In accordance with Onshore Oil and Gas Order No. 1, this well will starting be reported on Form 3160-6 "Monthly Report of Operations",

with the month in which operations commence and continue each month until the well is physically plugged and abandoned. This report Office, 170 to the Vernal BLMDistrict will be filed, in duplicate, South 500 East, Vernal, Utah 84078. or fires, leaks, accidents, Spills, blowouts, Immediate Report: any other unusual occurrences shall be promptly reported in accordance with the requirements of NTL-3A or its revision. a If a replacement rig is contemplated for completion operations, for "Sundry Notice" (Form 3150-5) to that effect will be filed, of this approved plan prior approval of the AO, and all conditions are applicable during all operations conducted with the replacement

rig. the A0 completed for production, Should the well be successfully status. will be notified when the well is placed in a producting will be sent by telegram or other written communSuch notification ication, not later than 5 days following the date on which the well is placed on

Engineer, to NTL-28, with the approval of a District water may be temporarily disposed of into unlined pits for an of up to 90 days. During the period so authorized, application for approval of the permanent disposal method, along must be with the required water analysis and other information, Engineer. submitted to the District Pursuant produced a period

Pursuant to NTL-4A, lessees or operators are authorized to vent/ well evaluation tests, not exceeding a flare gas during initial of 50 MMCFof gas, whichever period of 30 days or the production Enmust be filed with the District An application occurs first. of gas beyond for any venting/flaring gineer and approval received, 30 day or authorized test period. the initial diagram as required A schematic facilities 3162.7-3, and 3162.7-4 shall be submitted trict Office within 30 days of installation All site security whichever occurs first. in 43 CFR 3162.7 shall be adhered to. All and leaving hydrocarbon storage tanks will accordance with 43 CFR 3162.7-4. A first

after

conference will be scheduled within of the first production notice.

production

receipt

by 43 CFR 3162.7-2, to the appropriate Disor first production, regulations as specified product lines entering sealed in be effectively 15 days

No well abandonment operations will be commencedwithout the prior approval of the AO. In the case of newly drilled dry holes or oral approval will be oband in emergency situations, failures, from the AO. A "Subsequent Report of Abandonment" Form will be filed with the A0 within 30 days following completion of the well for abandonment. This report will indicate where plugs were placed and the current status of surface restoration.

tained

3160-5,

Final abandonment will not be approved until the surface reclamation work required by the approved APDor approved abandonment of the A0 or his notice has been completed to the satisfaction representative, or the appropriate Surface Managing Agency.

Pursuant to Onshore Oil and Gas Order No. 1, lessees and operators to see that their explora.tion, development, have the responsibility operations are conducted in a manner and construction production, and which conforms with applicable Federal laws and regulations to the extent that such with State and local laws and regulations to operations on Federal or State and local laws are applicable Indian

B.

THIRTEENPOINT SURFACEUSE PLAN 7.

and Production

of Tank Batteries

Location

Facilities

con(on site for six months or longer) structures structed or installed (including oil well pumpjacks) will be non-reflective, earthtone color to match the stanpainted a flat, dard environmental colors, as determined by the Rocky Mountain 5 will be painted within Committee. All facilities State Interagency required to comply with Facilities 6 months of installation. 0.S.H.A. (Occupational Safety and Health Act) will be excluded. All permanent

Production

'collection

surface will be carried by an insulated station as indicated in the APO.

security guidelines tions will be adhered to.

All site

All off-lease

identified

flowline

to a

in 43 CFR 3162.7 regula-

measurement, or commingling onhave prior written approval from the A0.

storage, off-lease

lease or off-lease

will

will be installed for oil and gas measurement facilities Appropriate tests for meter accuracy will be conducted monthly for the first three months on new meter installathereafter. The A0 will be provided tions and at least quarterly and all meter calibration with a date and time for the initial A copy of the meter calibration future meter proving schedules. All meter Office. reports will be submitted to the Vernal District API for with the standards will conform measurement facilities natural gas for standard the AGA and liquid hydrocarbons measurement. Suitable

the well location.

8.

Source of Construction The use materials

3610.2-3.

9.

Methods of Handling Burning

will

Material

under BLMjurisdiction

will conform to 43 CFR

Waste Disposal

not be allowed.

Produced waste water will be confined to an unlined pit for a production. During the period not to exceed 90 days after initial for approval of a permanent disposal 90 day period, an application along with required water analysis, will be method and location, Failure to file an application submitted for the A0's approval.

within the time allowed will and will be grounds pliance,

be considered an incident for issuing a shut-in

of noncom-

10.

Well Site

Layout

topsoil will be stored as indicated in the layout The stockpiled there. About 4-6" of topsoil should be stockpiled diagram. Access to the well pad will be from the north corner at stake No. 2. This will allow Chevron to construct the pad with less disturbance to a buried waterline.

at least 11.

Plans

will be fenced with a wire mesh fence and topped with one strand of barbed wire.

pits

Reserve

for Restoration

of Surface

the location and surroundImmediately upon completion of drilling, trash and junk materials, ing area will be cleared of all debris, The reserve pit and that portion of not required for production. the location and access road not needed for production or will be reclaimed. production facilities Before

the location takes place, the repipe, etc. dry and all cans, barrels,

any dirt work to restore

serve pit must be completely will be removed.

is to be abandoned, then all disturbed to the approximate natural contours.

If the wellsite be recontoured

all Prior to reseeding, roads, will be scarified

disturbed and left

areas will

the access areas, including with a rough surface.

or drilled at a time specified by the BLM. or some other implement will be dragged over the seeded area to assure seed coverage. Seed will be broadcast a harrow If broadcast,

The following

seed mix will

Western wheatgrass wheatgrass Intermediate Smooth bromegrass Yellow sweetclover Fourwing saltbush 12.

Other

be used: 2 1bs./acre 2 1bs./acre 2 1bs./acre 2 lbs./acre

2 1bs./acre

Information

and/or workThere will be no deviation from the proposed drilling and over program without prior approval from the AO. Safe drilling All wells, whether drilling, must be observed. operating practices in accordance suspended, or abandoned will be identified producing, with 43 CFR

"Sundry Notice and Report on Wells" (Form 3160-5) will be filed for approval for all changes of plans and other operations in accordance with 43 CFR 3164. will

surface

contractor use plan.

Suitable

cultural

resource

The dirt

be provided

to the granting

prerequisite resources are found during A0 will be notified.

with an approved copy of the

clearances were required as a If any cultural of this permit. all work will stop and the construction,

be valid for a period of one year from the date will be After permit termination, a new application approval. future for approval any filed for

This permit

will

of

AND REGULATIONS

RULES

(Read Carefully) This application blank is to be used only for temporary change of point of diversion, place or nature of use for a definitely fixed period not to exceed one year. If a permanent change is desired, request proper application blanks from the State Engineer. Application for temporary change must be filed in duplicate, accompanied by a filing fee of gy.go Where the water affected is under supervision by the State Engineer, time will be saved if the appointed of a Water Commissioner, Application is filed with the Commissioner, the proposed change and forward both copies who will promptly investigate with filing fee and his report to the State Engineer. Applications Bled directly with the State Engineer will be mailed to the Water Commissioner for investigation and report. If there be no Water Commissioner on the source, the Application must be filed with the State Engineer. the change When the State Engineer Ands that the change will not impair the rights of others he will authorize to be made. If he shall find, either by his own investigation or otherwise, that the change sought might impair existing to be heard before rights he shall give notice to persons whose rights might be affected and shall give them opportunity acting upon the Application. Such notice shall be given five days before the hearing either by regular mail or by one publication Before making an investigation or giving notice the State Engineer will require the appliin a newspaper. cant to deposit a sum of money sufficient to pay the expenses thereof to:

Address all communications

Edate,Engineer State Capitol Building Salt Lake City, Utah

ENDORSEMENTS

ENGINEER'S

STATE

(Not to be filled in by applicant)

Change Application

No.

......................

.

.......

........................................

(River System)

by Water Commissioner

received

1. ................................Application

..........................................................

of Commissioner)

(Name

....ARecommeondration of 2.

....

.

Stat

.

3. ................................Fee

for filing

................................Application

.4

rn

$7.50 received

application,

returned,

5. ................................Corrected

with

application

letter, to

requested

7. ................................Fee

for investigation

S................

9. ................................Fee 10. ................................Fee

for giving

notice

$................

published

13. ................................Notice

of pending

14

Change

...............................

received

by

:

......................

,

Recommendations:

by

received by

Rec. No.

................

............................

.

Rec. No.................

........................:

pubhcation

by

............................................

..................................................................................

application

change

by

protested

application

,

for advertising

in.......

to State Engineer's Office.

$..............................

requested

12. ................................Notice

ter

co

.......

for correction.

......................................,

;

notice

approved

...

Rec. No.....................

........................;

..............................

for giving

11. ................................Application

Office by..

S..........

for investigation

made by

by

...........

over

resubmitted

6. ................................Fee

8. ................................Investigation

Engineer

mailed

to.interested

parties

by

............as

follows:

..........................................................................

(Date Received and Name)

.AHpepa1ricnation

116

r

.

d

17

THIS

2. 3.

y

./

....Change

ommended

arp

Application

IS APPROVED

APPLICATION

by

fo

g and returned

SUBJECT

..................................................................................... ..................

.........................

....

.

..

.

.

....

.

..

.................

.

to

........

.........................

........................................................

TO THE FOLLOWING CONDITIONS:

....

w/ok

MINING OFOIL,6ASAND DIVISION INFORMATIONAPI SPUDDIN6 CHEVRONOIL COMPANY

OFCŒPANY: NAPE

RED WASHUNIT #295

WFllNAME: NW NW 22

OWNSHIP

SECTION

7s

ÑANGE

23E

COUNTY

CONTRACTOR DRILLING RIG# SPÐDED:DATE

12-5-84 10:30

IIME ÑOW

AM

hole

Dry

digger

DRILLING WILLCOMENCE Manning

BY REPORTED

Tao

IELEPHONEÑ

702 641

DATF

#43-047-31577

-

Rig

#23

Tannean

12-7

wieg

es

SI6NED

Uintah

Form Approved. Bureau No.42-R1424

Form 9--331 Dec. 1973

Budget

UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY

5. LEASE

p.pgi 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 2· RUeN AGaRsEhEMENT NAME

SUNDRY NOTICES AND REPORTS ON WELLS or plug back to a different

(Do not use this form for proposals to drill or to deepen for•dtidli þ¾Ø reservoir. Use Form 9-331-C

1. oil well

gas well

8. FARM OR LEASE NAME

other

9. WELL NO.

(11-228)

295

2. NAME OF OPERATOR

Chevron U. S. A. Inc. 3.ADDRESS OF OPERATOR P. O. Box 599, Denver,

10. FIELD OR WILDCAT NAME

Red CO

80201

4. LOCATION OF WELL (REPORT LOCATION CLEARLY. See space below.) ' FNL & 668 ' FWL W AT SURFACE: 906 AT TOP PROD. INTERVAL: AT TOTAL DEPTH:

17

-

Lower

22,

Sec.

T7S,

12. COUNTY OR PARISH

Green

River

R23E 13. STATE

Utah

Uintah

-

14. API NO.

16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

43-047-31577 15. ELEVATIONS(SHOW DF, KDB, AND WD)

GR REQUEST FOR APPROVAL TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE CHANGE ZONES ABANDON* Spud Date Report (other)

Wash

11. SEC., T., R., M., OR BLK. AND SURVEY OR AREA

5652'

REPORT OF:

SUBSEQUENT

(NOTE:

Report results of multiple completion change on Form 9-330.)

or zone

17. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled, give subsurface locations and measured and true vertical depths for all markers and zones pertinent to this work.)*

Well was Drilling

spudded Inc.

at 10:30 a.m. Drilling Manning

5, 1984 by Bill on December move into Rig No. 23 will

Rat

Jr's

Hole

to

location

OL GAS& MINING Subsurface 18. I hereby

Set

Safety Valve: Manu. and Type

Ft.

@

ertify that the foregoing is true and correct TITLE

SIGNED (This BY APPROVED OF APPROVAL, CONDITIONS

Engineering

space for Federal

or State

office use) DATE

TITLE IF ANY:

*See instructions

December

Asst.DATE

on Reverse

10,

1984

Lease No. Communitization Field Name

UNITED STATES DEPARTMENTOF THE INTERIOR GEOLOGICALSURVEY (FORM 9-329) (2/76) 42-RO 356 OMB

linit

Agreement No. Red

Nama

Participating County

MONTHLY REPORT

U-08 1

Area Uintah Chevron

Operator

OF OPERATIONS

O Amended

Wash Utah

State Inc.

U.S.A.

Report

The following is a correct report of operations and production (including status of all unplugged wells) for the month December of 19 84 (See Reverse of Form for Instructions) ,

This report is required by law (30 U.S.C. 189, 30 U.S.C. 359, 25 U.S.C. 396 d), regulation (30 CFR 221.60), and the terms of the lease. Failure to report can result in the assessrm nt of liquidated damages (30 CFR 221.54 (j)), shutting down operations, or basis for recommendation to cancel the lease and forfeit the sond (30 CFR 221.53) Well No.

Sec. &

TWP

RNG

¼ of ¼

295 22 NWNW 7S (11-22 I)

7" et g.

23E

Well Status

WOCR

Days Prod.

•Barrels of Oil

•MCF of Gas

0

0

0

*Barrels of Water

0

Remarks

5907'

TD:

@ 5907

none, so state. DISPOSITION OF PRODUCTION (Lease, Participeting Area, or Communitized Area basis) *lf

*On hand, Start of Month *Produced *Sold *Spilled or Lost *Flared or Vented *Used on Lease *Injected *Surface Pits *Other (Identify) *On hand, End of Month

Gas

Water

(BBLS)

(MCF)

(BBLS)

0

xxxxxxxxxxxxxxxxx

0

0 0

0

0

XXXXXXXXXXXXXXXXX

xxxxxxxxxxxxxxxxx xxxxxxxxyyyyyyyyy 0

-

Address.

P.

0.

Page

Box

xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx

O

O 0

Assistant

xxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxx

xxxxxxxxxxxxxxxxx

gyggggggggggggggy

0

0 0

0 0 0

*API Gravity/BTU Conten

Authorized Signature: Title· Engineering

Oil & Condensate

0 0 0 gyggggggggggggggy

xxxxxyyyyyyyyyyyy 599,

Denver,

CO 80201

U-081

Lease No.

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT

Communitization Field Name Unit Name

Form 3160-6 (November 1983) (Formerly 9-329)

Red

Wash

ATPA

Ÿ8rtiCipating

Uintah Chevron

County

MONTHLY REPORT OF OPERATIONS

No.

Agreement

Operator O Amended

The following is a correct report of operations and production January of 19 85

Utah

State U.S.A.

Inc.

Report (including

status of all unplugged

wells)

for the mont'

,

(See Reverse

This report is required lease. Failure to report basis for recommendation Well No.

Sec. & ¼ of ½

of Form for Instructions) by law (30 U.S.C. 189, 30 U.S.C. 359, 25 U.S.C. 396d), regulation can result to cancel RNG

TWP

295 22 NWNw (11-223)

7S

23E

(43 CFR 3162.4-3),

of liquidated damages, (43 CFR 3160), in the assessment the lease and forfeit the bond (43 CFR 3160). Weil

Days

Status

Prod.

Complet:.ng

0

penalties,

'MCF of Gas

'Barrels of Oil

*If none, so state. Area, or Communitized DISPOSITION OF PRODUCTION (Lease, Participating

*On hand, Start of Month *Produced *Sold *Spilled or Lost *Flared or Vented *Used on Lease

*Surface Pits *Other (Identify)

*On hand, End of Month *API Gravity/BTU Conte Authorized Signature: Engineering Title: .

Title 18 U.S.C. Section United States any false,

0

0 xxxxxxxxxxxxxxxxx 0

1001, makes it a crime or fraudulent fictitious

×X×xxxxxxxxxxxxxx

0

0

O xxxxxxxxxxxxxxxxx O

xxxxxxxxxxxxxxxxx 0

-

P.

n.

Rox

Page to make and willfully knowingly for any person as to any matter statements or representations

xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxx> 0

0

Address: Assistant

Water

×X×xxxxxxx×X×X×X×

O 0

PB

(BBLS)

0 0

x×xxxxx××XX×xxx×x

5795'

Area basis)

O 0

*Injected

TD:

Gas (MCF)

0 xxxxxxxxxxxxxxxxx

Remarks

'Barrels

0

Oil & Condensate (BBLS)

the terms of the or down operations,

and

of Water

0

0

shutting

0 O xxxxxxxxxxxxxxxx,

xxxxxxxx,,,,,, Denver. 599, CO 80201 of

to any within

department

or agency

of the

Form 3160-5 (November 1983) (Formerly 9-331)

UN"ED STATES DEPARTMEW OF THE INTERIOR

maget Expires

4TE• re.

SUBMIT IN TRIP (Other instructio verse side)

5.

to drill or to deepen or plug FOR

PERMIT-"

for such

2.

O

NÃMB

OF

O

""'^"°""°•"""

to a

7. °w^."es

NO.

proposals.)

1. °w'à,,

1004-0135

AND SBBIAL

DESIONATION

"'"

WELLS SUNDRYNOTICESAND REPORTSON diferent back reservoir.

not tage this form for proposals Use "APPLICATION

No.

August 31, 1985

U-081

BUREAU OF LAND MANAGEMENT (Do

LEASE

tsureau

UNIT

AGEREMENT NAME

Red

orms. 8.

OPERATOR

FARM

Wash OB

LEASE

NAME

CHEVRON USA INC. 8.

ADDESUS

4.

BOX 599,

O. OF WELI,

LOCATION

9. WELL NO.

OPSEATOR

OF

P.

location

(Report

80201

CO

DENVER,

and in accordance

clearly

10. FIELD

See also space 17 below.)

at

(11-22B)

295 with any State requirements.•

AND

Red

.urrae•

11. sac., T., a., M., om BLE. AND senvarosamma

906'

FNL & 668'

FWL

NWNW

Sec. 14.

PsaMIT

15. ELEVATIONS

No.

(Show whether or,

aT,

22,

12. consor

on, etc.)

GR 5652'

T7S,

om rantaa

R23E

18. sTATE

Utah

Uintah

CheckAppropriate Box To indicate Nature of Notice, Report, or OtherData

is

NOTICE TEST

INTENTION

OF

BEUT-Orr

WATER

FRACTURE

PCLL

TO:

BHOOT

OR ACIDIEE

ABANDON*

WELL

CHANGE

DESCRIBE

Status

Report

PROPOSED

OR CO5fPLETED

work. If well to this work.) •

proposed

nent

is

SUBBBQUENT

OR ALTER

31ULTIPLE

TREAT

REPAIR

(Other) 17

OR WILDCAT

POOL,

Wash

CASING

REPAIRING

WELL

TREATMENT

ALTERING

CAalNG

BROOTING

OR ACIDIžING

ABANDONNENT*

(Other)

PLANS

(NoTs:

__ OPERATIONS

directionally

(Clearly drilled,

SBUT-OFF

FRACTURE

WATEE

COMPl.ETE

REPORT 07:

give

all pertinent details, and give locations and measured

state

Report results of multiple completion on Wel Report and Log form.) or Recorapletion pertinent including estimated date of starting any dates, depths true vertical for all markers and sones pertiand

Completion

subsurface

Manning set at 5907'. to a depth of 5900' with 7" casing Well was drilled Oil Well Service Western 28, 1984. on December Company Rig No. 23 was released will procedure Completion well for completion. move onto Co. Rig No. 18 will frac stimulations. and three in the Lower Green River consist of perforating

JJJ:pm 18. I hereby certify

that the to

---

oing is true and correct TITLE

SIGNED (This space for Federal

or State

APPROVED BT CONDITIONS OF APPROVAL,

Engineering

Assistant

gay,

January

31,

1985

ORee use)

DATE

TITLE IF ANY:

*Seeinsievesionson ReverseSde Title

18 U.S.C.

United

States

Section false,

any

1001, makes it a crime fictitious or fraudulent

for any person statements

and willfully to make knovfingly as to any matter or representations

to any department within

its

or agency

of the

er

N

SUBMIT UN TED STATES DEPARTMENT OF THE INTERIOR

3 0

DU

IN

et

E.

I

48E

BUREAU OF LAND MANAGEMENT

WELL:

O

IV

II.

b TYPE OF COMPLETlON: WaltK

NEW f.

WEI

2. NAME

7:t FN

Eit

In

*

O if

ÛtilPF

lit:Niit

OPERATOS.A.

OF

ADDRESS

N

FAIDI

.

..

UPERATOR

OF

or

I,oCATioN

(Report

«El.L

clearly

location

and

in accordance

906 ' FNL & 668 ' FWL

At surfac'

At top prod.

reported

interval

a

scith

nts)

I

NO.

PERMIT

DATE

12-5-84

DATE

21.

MD & TTD

OP

T.D.,

to prod.)

(Ready

COMPL.

Green

AND

OTMER

-S

IP MCI.Tirl.E MANT* HOW

RKB,

BOTTOM,

DEPTH

26 23 LINER TOP

SIžB

23.

INTERVAI.8 DRILLED BT

ROTARY

\

BET

(Report

all strings

HOLE

(MD)

Í

All

TOOLS

WAB DIRECTIONAL MADE SURTET

WAS

COBSD

WRI,L

set in seril) RECOR

CEMENTING

SIZE

TUBING

30. BACKS

(MD)

CEMENT*

SCREEN

sire end number)

(MD)

SIZE

DEPTM

PULLED

INTESTAL

attachment

see

RECORD BRT

UNT (MD)

PACEER

(MD)

5414 CEMENT

ACID. SHOT. FRACTURE,

82.

33.*

AMOUNT

250 sxs 1484

12½;" 8-3/4" 8-3/4"

DEPTH

Ah!OUNT AND

(MD)

ETC.

SQUEEEE,

EIND

OF

NÃTERIAL

STATUS

(PT

t'SED

attachnent

PRODFCTION FIRST

PRODUCTION

PRODUCTION

2-23-85 DATE OF

I

TEST

HOURE

3/4-7/85

(Flowing,

METHOD

CHOKE

BIEE

DISPOBITION

Sold

35. LIST

x 120"

PROD'N. FOR PERIOD TEST

72

TUREWe 9--55.

CAalNO

PRESBURE

CALCULATED 24-Hot a RATE

Oll.--BI..

OF GAS

pump)

WELL

Producing WATER-BBL.

I

|

176 GAB-MCF.

791

|

122

695

WATUR--BEL.

OIL

GRATITT-API

25

264

41

ef¢.)

(CORE.)

TEST

w!T.NESSBD

-T

Sustakowski

J.

ATTACEMENTS

acid

Perforation, 30. I hereby

GAS-OIL BATIO

,

R. OF

mging or

sketda)

GAS-3|CF.

I

|

Of

x 10

OIL-BBL.

50

(Sold, sagd for futi, vtsttd,

end typ¢

psimping-Bire

lift,

gas

1-3/4"

Pumping

TESTED

107 psi 34.

CABLE

25.

RECORD

BOTTOM

(MD)

(Intervel,

ascORD

TOOLS

TVD)•

2-7/8" A1. rearonArtos

CASINGHEAD

Yes

45' 515 5907 4843

36

7"

ELEV.

No

LE./FT.

WEIGHT.

STATE

Utah

I 19.

27.

CASING RECORD alzE

13,

tah

GE, ETc.).

RT,

R23E

T7S,

OR

Gr-

29.

FloW.

AND BURVET

GR 5652

COMPL.,

AND

(MD

NAME

22,

COUNTT

EL'N

LOGS

C

16" 9-5/8" 7"

DATR

River

River

2

see

WILDCAT

OR

Wash-Green

U

ELEVATIONS (DF,

18.

i 22.

MD A TVD

COMPLETION-TOP.

THIS

Lower

ELECTRIC

CABING

POOL,

SEC.. T.. R., M., OR BLOCK OR AftEA

12.

ISSUED

5795 INTERVAL(S),

5167-5640 TTPE

DATE

2-23-85 BACK

PLUG,

5907

20.

1Î.

REACHED

T.D.

12-25-84

PRODUCING

AND

Red

//- /S~Î

43-047-31577

24.

(11-22B)

FIELD

Sec.

18.

DEPTH,

NAME

GAS & MINING

SPLDDED

20. 1erAL

LEASE

DIVISION OF OIL

below

14

DATE

*

**

s.

Tl.

NWNW

At total depa

15.

NAME

Wash Uit

295 10.

4.

TRIBM

OR

---

RECEIVED

Inc·

3.

NO.

SERIAL

AN[>

ALI.OTTEE

"

Red

DIFF.

i i i G K

i

INDIAN,

NIT

O her

Day

DESit;NATiuN

U-081

WELL COMPLETION OR RECOMPLETION REPORTAND LOG * ta. †VPË OF

N31,11090845-0

rea

certify

that

the f

& frac

details

egoing and attached

information

is complete

TITLE

SIGNED

and correct

Permit

as determined

Title 18 U.S.C. Section United States any false,

1001,

makes

fictitious

it a crime or fraudulent

all available

Coordinator

(See Instructionsand Spaces fer Additional Data knowingly

from

on

records

March

DATE

29,

Revers. Side)

and willfully for any person to make statements or representations as to any matter

to any within

department its

or

agency

of the

1985

37.

w5875

3050

Surface

TOP

portus Numerous zones CNL-LDT Schlumberger

FM

River Fm.

Green

Wasatch

Fm.

Uintah

FORMATK)N

oc :ur

contents

through