Obstanovka Meeting 12-13 March 2007 Budapest

1 downloads 0 Views 3MB Size Report
Experiment Interface Types. RS422 - LP, LP, DP, DP, baud rate 38,4k. RS422 - CORES, baud rate 115,2k. RS422 - RFA, baud rate 19,2k. RS232 – ...
János Nagy, Kálmán Balajthy, Sándor Szalai, István Horváth Hungarian Academy of Sciences, Wigner Research Center for Physics, (former name KFKI-RMKI), Budapest, Hungary  

International Space Station Research Investigations and Experiments IKI RAS, Moscow, Russia, April 9-11, 2015

Block Diagram of Obstanovka

2

3

Advantages of Multiprocessor Arrangement experiments are located on two space branches both are galvanic isolated, and supplied by power from different feeders individual DACU units in every branch suppress coupled noise, EMC interactions and avoids creating ground loops Reserve computing capacity by distributing tasks between two parts

Location of DACU Units in ISS

4

5

Experiment Interface Types RS422 - LP, LP, DP, DP, baud rate 38,4k RS422 - CORES, baud rate 115,2k RS422 - RFA, baud rate 19,2k RS232 – DFM2 SAS3 10 Mbit/s Ethernet Analogue Inputs DFM1, CWZ, CWZ +-2V Normal and Burst mode

Three Onboard Computers of Obstanovka

6

The opened BSTM, PC/104 cards and heatsink is visible

7

BSTM Interface Types Ethernet 10 or 100 Mbit/s - ISS Onboard Ethernet 10 Mbit/s, optically isolated –Amateur

Radio Special Onboard Interface, optically isolated – BITS Special Onboard Interface, optically isolated – Slow Telemetry DACU1, DACU2, SAS3 - Ethernet 10 Mbit/s, optically isolated

8

PC/104 cards Processor card DC-DC Power Supply unit Serial interface card Ethernet switch and HUB power switch cards BITS interface card Slow Telemetry Interface Analog-to-digital converter EGSE cards Simple signal conditioners, in DACU

9

10

Critical Technological Points Power consumption BSTM 30 Watt, DACU 12 Watt Weight, mass BSTM 4.7kg, DACU 3.1kg Thermo vacuum test Vibration test EMC Data Transmission through Ethernet between BSTM and DACU units HDD power and vibration test

11

Input current at Power On

Test Facilities, Vacuum Test and Vibration Test

12

13

First Heatsink

14

First Heatsink

Redesigned Heatsink

15

16

2.5” Removable HDD RACK

Ethernet Test UTP - Unshielded Twisted Pair - cable of cat 5 was

applied in transmission tests. The nine-meter long cable contained two pairs of PC-50 and six pairs of PC-19 type connectors. The distance between the neighboring connectors measured 1 m.

17

Major Results of Testing Ethernet Line for ISS 100 MHz transmission speed could be achieved.

There was no loss in data packets during long time test without external noise. External noise sensitivity is high, especially at connectors. Waveform distortion reached 5-7%, and it was 15% if external noise was applied. The application of S-STP – shielded twisted pair – with galvanic connected connectors is suggested

18

Arrangement of Ethernet Test

19

20

BSTM functions Long term storage of enormous data amount Transfer of some data to Earth through different

radio channels Control of the experiments: radio + scenario Powering the experiments

Commanding the experiments (mode and parameter

setting)

Data Quotas Daily Quota = storage capacity / 180 day / 11

experiments. Same for each experiment. Restquota = unused quota of previous day. Redistributed in portion of used space of previous day. A very simple example with 2 experiments: 1. Day: used 40/100 and 100/100 units, remained 60 2. Day: used 40/117 and 143/143, remained 77 3. Day: used 40/116 and 161/161, remained 76

21

Stored data format One new file in each hour Each record contains: Identification: the experiment number Time stamp of origin, when the data block was

created (by the DACU / SAS3 / BSTM) Indicators and control information for example: block length, Housekeeping / science data indicator

22

23

Communication channels IUS On Board Ethernet of RS-ISS Accepts commands from Earth, and sends acknowledgement of them  Sends housekeeping data to Earth Generates time stamps BITS Bit Serial Interface Slow telemetry AMR Amateur Radio Channel

24

Properties of channels Radio visibility: 3 times 5 minutes / day Slow bode rate, only some housekeeping data can be

transferred AMR can be used from different points of the Earth, But AMR is dedicated for educational purposes

Telecommand Generated in EGSE Processed in Command

Center IUS receives radio command, forwards it through BSTM - DACU to experiment BSTM sends acknowledgement Execution at once

25

26

Scenario Generated in EGSE Copy on new data storage disc Astronaut changes the disc in the BSTM A scenario contains: Powering commands for DACU Mode commands and parameters for the experiments Delays

27

Astronaut operations Mounting and caballing the devices Powering BSTM, DACUs BSTM indicates connected DACUs Indicators for disk change Switch BSTM power off Change the data storage pack Switch BSTM power on

Installation of Obstanovka in the space in April 2013

28

29

Obtanovka team in Budapest

Thank you for your attention!

30