GOVT. OF ASSAM - Bongaigaon

134 downloads 283 Views 5MB Size Report
namely Barpeta in the east, Goalpara in the south-east, Kokrajhar in the north- west and. Dhubri in the south-west. The major portion of the areas of erstwhile ...
GOVT. OF ASSAM “MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

2007-08 To 2011-12

PROJECT COST – Rs. 56.10 CRORE

SUBMITTED BY

DEPUTY COMMISSIONER, BONGAIGAON, ASSAM

SEPT-2008 Tele # (03664)230889(O), (03664)230891(R), Fax #(03664)231338(O) Email: [email protected] Web: www.bongaigaon.nic.in

INDEX PARTICULARS Chapter-I Chapter-II Chapter-III Chapter-IV

Chapter - V

Preface District at a glance A brief profile of Bongaigaon Sectors and allocation (Summary) Sector wise plan scheme 1. Agriculture Engineering 2. Agriculture (General) 3. District Rural Development Agency 4. Public Health Engineering 5. Education i) Secondary Education ii) Elementary Education iii) Colleges 6. Health & Family Welfare 7. PWD (Rural Roads) 8. PWD (State Roads) 9. Irrigation 10. Sericulture 11. Fisheries 12. Handloom & Textiles 13 Animal Husbandry & Veterinary 14. Dairy 15. Industries & Commerce 16. Forestry i) Social Forestry ii) Territorial Forest 17. Industrial Training Institute 18. Employment 19. Social Welfare 20. Char Development Project 21. Bongaigaon Municipality Board 22. Abhayapuri Town Committee 23. PWD Building 24. Total Literacy Campaign Monitoring & External Evaluation

PAGE NO. 1 2 4 17 24-44 45-55 56-58 59-65 66-70 71-74 75-78 79-81 82-86 87-90 91-94 95-99 100-106 107-113 114-120 121-131 132-139 140-144 145-148 149-151 152-159 160-164 165-169 170-175 176-180 181-187 188-194 195

INDEX FOR TABLE COMPONENT/SECTOR

TABLES

A brief profile of Bongaigaon

Table-1,1.1 Table-2, 3 Table-3.1 Table-4,4.1,4.2 Table-5 Table-6 Table-7 Table-8,9 Table-10 Table-11 Table-12 Table-12.1 Table-12.2, 12.3 Table-12.4 Table-12.5 Table-13 Table-13.1 Table-13.2 Table-14 Table-15 Table-15.1, 15.2 Table- 15.3.1, 15.3.2 Table-15.4.1,15.4.2 Table-15.5.1, 15.5.2 Table-16 Table-17 Table-19 Table-20,21 Table-22,22.1 Table-22.2 Table-23 Table-24 Table-25 Table-26 Table-26.1 Table-26.2 Table-27 Table-28

Agriculture Engineering

Agriculture (General)

Secondary Education Elementary Education Fisheries Animal Husbandry & Veterinary Dairy Social Forestry Territorial Forest Social Welfare Bongaigaon Municipality Board

Abhayapuri Town Committee PWD Building

PAGE NO. 5 6 7 8 9 10 11 13 15 16 25 26 27 28 31 33 34 35 38 48 50 52 53 55 67 72 105 116 123 124 144 147 164 172 173 174 179 183

CHAPTER-IV SECTOR WISE PLAN SCHEMES

CHAPTER- V MONITORING AND EXTERNAL EVALUATION : Experts guidance and opinion for making the schemes fully viable and visible prepared under Multi Sectoral Development Plan (2007-08 to 2011-12) for minorities of the district, the following institutions will be used: 1. Indian Institute of Technology, Guwahati. 2. National Institute of Fashion Technology. 3. National Institute Rural Development, Guwahati. 4. State Institute of Rural Development, Guwahati. 5. Assam Administrative Staff College, Guwahati. 6. Indian Institute of Entrepreneurship, Guwahati. 7. Weavers Training Center. 8. National Centre for Jute Diversification.

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

PREFACE Since disadvantaged segments of a society can not remain as disadvantaged in a Welfare State, the ‘development deficits’ must be addressed through a method so as to bring them at par with national average. It has been experienced that few social groups which are termed as minority groups are either oppressed or stigmatized on the basis of racial, biological or other characteristics. Marginalization takes place where a social group starts lagging behind other social groups causing social exclusion . A particular segment of a society experiences deprivation either of resources or of social links. Economic benefits provided to these groups may remove the deprivation which causes social exclusion. The Sachar Committee looked into the relative deprivation of Muslims and focused on the deficits and deprivations of Muslims in it’s report. Later on, the Govt. of India decided to identify districts on the basis of minority population, namely Muslims, Sikhs, Christians, Buddhists and Parsis and backwardness parameters such as literacy rate, female literacy rate, work participation rate, female work participation rate, percentage of households with pucca walls, safe drinking water, electricity and water closet latrines etc. and the result is Multi-sectoral District Development plan for Minority concentrated district so as to remove the deprivations. Bongaigaon District is one of 90 Minority concentration districts in the country and classified in category ‘A’ i.e. the district is having both SocioEconomic and Basic amenities parameters below national average. Based on the guidelines of Ministry of Minority Affairs, Government of India, base line survey of the district was carried out by Omeo Kumar Das Institute of Social Changes, Guwahati, Assam. On the basis of the survey the Multi Sectoral Development Plan for Minorities has been drafted for the district. Plan schemes covering 24 sectors have been prepared under this programme. Priorities have been given on better infrastructure of schools, pucca housing, drinking water, basic health, all weather roads, critical infrastructure linkages that are required for optimizing services, skill development, marketing facilities which are required for improving living conditions besides beneficiary oriented schemes for creating income generating activities . While preparing the schemes, views of the members of the District Level Committee on PM’s New 15 pt. programme have been obtained along with the PRIS. The Plan/Project has been approved by the District Level Committee. The MSDP, which will change the socio-economic scenario of the minority people of Bongaigaon District, may be implemented successfully only through joint effort and responsibility of the Govt. functionaries as well as PRIS. Proper evaluation and external monitoring will be carried out at the time of implementation. There is no doubt that inclusive growth, accelerated development

and improvement in the quality of life of the people will be arrived at in the District of Bongaigaon with the help of all. (Dr. M. Angamuthu, IAS) Deputy Commissioner Bongaigaon

2

CHAPTER-I THE DISTRICT AT A GLANCE Basic figures about the district of Bongaigaon are presented below. • • •

Headquarter No. of Sub-Division No. of Revenue Circles



No. of Blocks

• • • •

No. of Gaon Panchayat No. of VCDCs No. of Towns No. of Police Stations

: Bongaigaon Town : 3 (Bongaigaon, Bijni, North Salmara) : 5 (Bongaigaon, Boitamari, Sidli(part), Bijni, Srijangram) : 7 (Dangtol, Boitamari, Tapattari, Srijangram, Manikpur, Sidli(part), Borobazar. : 65 : 50 : 3 (Bongaigaon, Bijni, Abhayapuri) : 8 (Manikpur, Bijni, Dhaligaon, Sidli, Bongaigaon, Abhayapuri, Jogighopa, Amguri).



• • • • • • • • • • • • • • • • • • • •

No. of outposts

: 15 (Salabila, Noagaon, Borobazar, KoilaMoila, Ouguri, Kumguri, Garubhasha, Dangtol, Bidyapur, Rowmari, Boitamari, Jogighopa, Majeralga, North Salmara, North Bongaigaon ) Fire Brigade Station : 1(one) Area (as per 2001 census) : 2510 sq. km. Location : North Eastern Himalayan sub region of India. Longitude range : 890 East to 90096/ East Latitude range : 26028/ North to 26054/ North Distance from state capital : 210 km. Bordering districts : Kokrajhar, Barpeta, Dhubri and Goalpara. Rainfall : 2500 mm to 3500 mm Temperature : Min: 130 C. max: 320 C. Clothing pattern : Light cotton in Summer and Woolen in Winter. Language spoken : Assamese, Bengali, Hindi, Bodo. Reserved Forest Land : 42868 Bigha 3 Katha 14 Lesa Government Land : 291075 Bigha 2 Katha 19.5 Lesa Area of Periodic Patta Land : 715607 Bigha 1 Katha 15.5 Lesa No. of Periodic Patta Land : 96645 Area of Annual Patta Land : 57556 Bigha 4 Katha 1 Lesa No. of Annual Patta Land : 14639 Total Area and no. of VGR/PGR:58978 Bigha, 3 Katha, 10 Lesa., 155 nos. Net cropped area : 93875 hac. Fallow Land : 8882 hac.

3

• • •

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Land not available for cultivation : Area under irrigation : Size of land Holding ƒ Less than 1 hac. : ƒ Between 1 and 2 ha : ƒ Above 2 ha : District Civil Hospital : CHCs : PHCs : Sub-Centre FW : State Dispensaries : Rural Hospital : Railway Hospital : BRPL Hospital : Private Hospitals : Railway Dispensary : Govt. Subsidiary Hospitals : Rural Family Welfare Centres : Blood Bank Facility : Primary Schools : Middle English Vernacular Schools : High Schools : Higher Secondary Schools : Junior College : General Colleges : DIET : B.Ed. College : Basic Training Centre : Polytechnic : ITI : Law College : Normal School : Plough Animals : Buffaloes/Cows (Local and Jersey): Sheep : Goats : Poultry birds : Pigs : Artisans : Household Cottage Industries : Allied Agro Activities : Marginal Workers : Other Workers :

4

76,407 hac. 25,403 hac. 66065 nos., 66.10% 21802 nos., 22.00% 12390 nos., 12.00% Nil 4 Block: 6 and Mini: 16 117 20 5 1 1 5 1 3 6 2 970 nos. 261 nos. 114 nos. 17 Nil 8 1 1 1 1 1 1 1 37170 5915 nos.+ 301638 nos. 28784 116404 571278 20550 1888 1956 3182 39135 65524

CHAPTER -II A BRIEF PROFILE OF BONGAIGAON 1. Area and location Bongaigaon District was created in 1989 carving, out areas of Goalpara and Kokrajhar District with its headquarter at Bongaigaon. It is surrounded by four districts, namely Barpeta in the east, Goalpara in the south-east, Kokrajhar in the north-west and Dhubri in the south-west. The major portion of the areas of erstwhile Bijni and Sidli estates along with tracts of Eastern Duars was carved out of Goalpara and Kokrajhar District in October, 1989 in order to create a new district of Assam, i.e. Bongaigaon, Although the rationale behind the creation of this new district was no doubt an administrative one, however, political and economic exigencies were also responsible behind its creation. The District falls within 26028/ N to 26054/ N latitude and 89028/ E to 90096/ E longitude. The district has a total land area of 2152 sq. km. as per the records of Census 2001, of this total rural area is 2123.92 sq. km. and urban area is 28.08 sq. km.

2. Administrative Division. Administratively, the district is divided into three subdivisions viz. Bongaigaon, Bijni and North Salmara. There are five revenue circles and seven community development blocks (CD) in the district.

Revenue Circles and Blocks in Bongaigaon district. Name of Revenue Circles Bongaigaon

Boitamari Sidli (Part II) Bijni Srijangram

Name of Blocks. Dangtol Borobazar Boitamari Boitamari Sidli-Chirang Pt. Dangtol Borobazar Manikpur Srijangram Tapattari

The total number of villages in the district is 917 of which 881 are inhabited. There are 93 Gaon Panchayats in Bongaigaon district.

5

3. Resource Base 3.1. Population As per the Census data 2001, the demographic profile of the district shows that 45.08 percent of the total rural population in the district belongs to the minority community of which Muslims comprise 94 percent. The population density in the district stands at 420 persons per sq. Km. is significantly higher than the state average which stands at 340 persons as per the 2001 census. With a total of 168556 households, the district comprises 145300 rural households and 23256 urban household.

Table-1. Total Population of Bongaigaon District (2001) Residence

Persons

Hindu

Muslim

Christian

Total

904835

535464

348573

18728

Urban

109782

98783

8861

718

Rural

795053

436681

339712

18010

Source : Census of India, 2001

The population distribution of religious minority groups in the rural areas is shown in the table below. The percentage of total Muslim population in the rural population of Bongaigaon district is estimated to be 43% approximately. The Muslim population in district which was 23.38 percent as per the estimates of 1991 census has increased to 24.77 percent as per the estimates of 2001 census data. The share of ST population in the district is 12.23%.

Table-1.1 Religious distribution of rural population in Bongaigaon district (2001). Total Muslim Minority 358372 339712

Christian Sikh

Buddhist

Jain

Others

18010

113

147

56

8

Not stated 326

(45.08)

(2.27)

(0.01)

(0.02)

(0.01)

(0.001)

(0.04)

(42.73)

Source : Census of India, 2001.

3.2. Sex ratio An important indicator of gender equality is the number of females per thousand males. As per the 2001 census data, the sex ratio of Bongaigaon stands at 945 females per thousand males while the child sex ratio for (0-6 years) is 972. Significantly, the sex ratio for rural areas in the district stands higher than the district total. Caste and religious group wise sex ratio shows that although the Muslims and Hindu SC population have low sex ratio

6

in the district however, the Muslims fare better than the SCs. The sex ratio of the ST population comprising mainly the ethnic groups of Bodo Kacharis which is equal is traditionally less gender unbiased society.

Table-2. Religion wise sex ratio for rural and total population in Bongaigaon district (2001) Residence District total District Rural

Total 945 950

Hindu 951 960

Muslim 935 936

Christian 975 975

SC 924 923

ST 1000 1005

Source : Census of India, 2001.

3.3. Literacy Rate The literacy rate in the district as per the Census, 2001 is lower than the state average. Although the female literacy rate in the urban areas of the district is same as that of the state average for urban female, however in rural areas the female literacy rate is much lower than the state average which clearly shows the poor status of educational attainment for women.

Table-3. Literacy Rate by Sex and Area in Bongaigaon Population total

Rural

Urban

Total

Male

Female

Total

Male

Female

Total

Male

Female

63.25

71.28

54.61

59.73

68.22

50.70

85.35

89.74

80.24

Bongaigaon 59.33

67.67

50.44

55.31

64.02

46.09

85.86

91.28

79.86

Place Assam

Source : Census of India, 2001.

Religious community wise literacy rates in the district reveal that literacy rate for Hindus is not only the highest among the religious groups of the district but is also significantly higher than the district average rural literacy rate. The literacy rate of the Muslims is much below the average rural literacy rate of the district particularly the Muslim female literacy rate in rural areas. This low level of literacy and consequent educational attainment has its bearing on the employment and livelihood opportunities of the Muslims. The main reason for educational backwardness of Muslims is poverty due to which children are forced to drop out after the first few classes. This is particularly true for Muslim girls. Little children are expected to provide for their families by working in karkhanas (small workshops), as domestic help or by looking after their siblings while their mothers to work (Sachar Committee Report, 2006). The opportunity costs involved in sending children to school is also too high for poor and illiterate parents. The community specific factor for low

7

educational achievement is that Muslims do not see education as necessary translating into formal employment (Sachar Committee Report, 2006). Table-3.1. Literacy rate by religious groups and place of residence in Bongaigaon.

Religion

Residence

Literacy Rate(2001) Person

Male

Female

Hindus

District Total

69.69

79.18

60.23

Hindus

Rural

65.84

75.88

55.36

Muslims

District Total

40.93

48.08

33.19

Muslims

Rural

40.17

47.32

32.43

Christians

District Total

58.72

66.66

50.62

Christians

Rural

57.27

65.44

48.93 Source : Census of India, 2001.

The gender discrepancy in terms of sex ratio and literacy rate is thus more prominent for Muslim females in Bongaigaon district which corroborates the findings of Sachar Committee Report.

3.4. Workforce The workforce distribution of the total population in the district shows that only 32.41% of the population is in the total workforce, while 67.59% of the total population of the district is non workers. The urban work participation rate (31%) is marginally lower than the rural work participation rate (32%). Cultivators comprise the major work rural force in Bongaigaon. However, the size class wise landholding distribution in the district shows that 66% of the total landholdings in the district are less than one hectare which shows that most of the farmers have landholding, sizes less than marginal size class, 22% of the cultivators have marginal holdings and 12% have landholdings of more than two hectares. The phenomena of fragmentation and land alienation are well captured by the fact that while there has been 52% decrease of cultivators in the workforce in the district, simultaneously the agricultural workers has increased by almost 25% compared to the figures for 1991. Religious groups wise work participation rate reveal that although Hindus comprise 55% of the total rural population in the district, 60% of the total rural workers in the district are Hindus. On the contrary, although 43% of the total rural population in the district belongs to Muslims, the share of the community in the work force is only 37% which indicates that 73% of the Muslims are without any work.

8

Table- 4. Percentage of workers by religious groups in total rural workers. Cultivator

Agricultural worker

Household industry workers

Other workers

Total

Hindu

26

10

2

21

60

Muslim

16

9

1

11

37

Christians

2

1

0.1

1

3

Total Rural

44

20

3

Religion

33 100 Source : Census of India, 2001.

Further disaggregated figures on gender based work participation rate indicate that female work participation rate is one third the rate of males in the district. The differences are more pronounced in the urban areas where the female work participation rate is only 8% compared to 51% for males.

Table-4.1. Percentage of male workers by religious group in total rural workers. Religion

Cultivator

Agricultural worker

Household industry workers

Other workers

Total

Hindu

18.0

5.6

1.0

17.0

42

Muslim

14.0

7.0

0.4

10.0

31

Christian

1.0

0.3

0.02

1.0

2

Total Rural

33

13

1

28 75 Source : Census of India, 2001.

Table-4.2. Percentage of female workers by religious group in total rural workers. Religion

Cultivators

Agricultural workers

Household industry workers

Others

Total

Hindu

8

4

1

4

17

Muslim

2

2

0.4

2

6

Christian

1

0.3

0.03

0.2

1

Total Rural

11

7

2

6 25 Source : Census of India, 2001

This indicates that with almost 80% literates among urban women, there is however limited work opportunities for them. Religion and gender based disaggregated data shows that Muslims women’s work participation is only one fifth of their male counterparts. The share of female workers in the total rural female population in Bongaigaon is 21% while the same for Muslims is only 10%. The gender discrepancy in terms of sex ratio, literacy rate and work participation is therefore more pronounced for rural Muslim women in Bongaigaon district.

9

3.5. Education and Health The educational level of the population of the district is abysmally low. Stage wise enrolment figures for the district shows that pre-primary enrolment in the district is 13% while the same for primary level is 55%. The enrolment rate in the middle school is merely 20% while at the high school and higher secondary level the figures stand 9% and 3% only. The poor educational attainment in the district also reflects the poor quality of employable human resource and low work status for the vast majority of the workforce. The educational attainment of the total literate population in the district as per Census 2001 shows that 2% are just literate without any attainment level. The educational attainment for pre-primary is 32% and primary is 24%. The educational attainment of the district in respect of middle and high school/ higher secondary and diploma is 19% each. The corresponding figure for graduates is only 4%. An important indicator of health status is the sex ratio especially of children in the age group of 0-6 years. The child sex ratio in the district as per the estimate of Census, 2001 is higher than the state average. Although the rural child sex ratio in the district stands higher than the state average, the urban child sex ratio in the district is much lower than the state average. A comparative picture across religious groups shows that child sex ratio among the Muslims in the district is the highest across all religious groups. The high child sex ratio of the Muslims can be attributed to high birth rates. Although the rural child sex ratio of the Muslims is significantly higher than the state and the district average, the urban sex ratio is the lowest across al religious groups and is significantly less than the state and the district average. The infant mortality rate in the district which stands at 122 per thousand live births is the second highest among the districts of Assam as per the estimate of the Assam Human Development Report (AHDR) 2003. The health index of the district as per the AHDR (2003) ranks second from bottom at 0.129.

Table-5. Religion wise child sex ratio in Bongaigaon district (2001) Religion

District Total

Rural

All Religion

972

975

938

Hindu

968

972

938

Muslim

977

978

928

Christian

949

947

1000

Assam

965

967

943

10

Urban

3.6. Human Development Index In respect of Human Development Index (HDI), Bongaigaon is one of the lowest ranked districts of Assam. The district ranks 21 in respect of HDI with an index value of 0.263 which is much lower than the state index at 0.407. The Human Poverty Index (24.03) as per the AHDR (2003) indicates that almost a quarter of the population in the district is in poverty. The Gender related Development Index (GDI) for Bongaigaon in 2001 is estimated to be 0.376, which is far less than the state average of 0.537. The GDI rank of Bongaigaon which stands at 16 is higher than the HDI rank at 21. The high GDI rank compared to HDI indicates low gender disparity in the district.

4. Natural Resource Base 4.1. Land and its quality Among the 15 agro-climatic regions of the country, categorized/ identified on the basis of homogeneity in agro-characteristics, Bongaigaon falls in the Lower Brahmaputra Valley zone. The agro climatic conditions of the district are conducive for various agricultural activities. The topography of the district represents mostly plain lands except a small portion of isolated hills in Bijni sub-division, bordering Bhutan. The district is drained by the Brahmaputra on the south and two of its major tributaries viz. Aie & Manas flowing from the north to south. About 72% of normal rainfall is received during May to August. Heavy rainfall coupled with high intensity of wind causes severe soil erosion, particularly on upper reach and in flood prone areas. Sheet Gully erosion and riverbank erosion, are the main types of erosion commonly seen in the district. It may be observed that there is vast scope for land development activities, water management and soil conservation in the district. The total estimated potential area for land development activities is 15700 hectares in the district.

Table- 6.Land Utilization pattern in Bongaigaon district (2001-02) (Area in hectares) Total Area

Not available for cultivation

Other uncultivable excluding fallow land

Fallow land

Net sown area

Total cropped area

Area sown more than once

251000

74794

14077

10100

94908

156397

61489

Source : Statistical Handbook Assam, 2006

11

Agriculture in the district is characterized by over dependence on rainfall, predominance of seasonal crops and traditional methods of cultivation. Agriculture is the predominant economic activities of the district. Paddy is the major crop of the district and covers 75% of the total gross cropped area. Net area under different crops in the district works out to forms about 38% of the total geographical area.

4.2. Forestry The forest cover in the district is estimated to be 56598 hectares i.e. 22.6% of its total geographical area as per the estimates of Forest Statistics of Assam 2005. The per capita forest coverage in the district is 0.07. Although the total area under reserve forest in the district is 48953.13 hectares, the rate of deforestation of reserved forest during the period 1994-2005 in the district has been estimated at 9% per annum. In respect of farm forestry, the district has vast scope for development of bamboo sector. The Manas National Park falls in the northern part of the district.

4.3. Soil and Water The district falls under Brahmaputra river basin. The district has large reservoir of water resources with the river Brahmaputra and its two tributaries of Aie and Manas. The soil type is generally sandy to sandy loam with alluvial deposits. The soil is highly porous and therefore, lacks moisture retention capacity and is susceptible to erosion. The water level in the district is very low. The rivers also act as reservoir for fisheries. The district has a total of six registered beel fisheries. The district experiences annual rainfall in the range of 2500 mm to 3500 mm. Goalpara Soil Conservation Division with its head quarters at Kokrajhar is the nodal agency to oversee the soil conservation and water management works in the district. There is only one range office in the Bongaigaon district which was under the jurisdiction of Goalpara Division. The district approximately shares four percent of the usable ground water resources in the State of which only 15% is usable for drinking water purpose. This indicates the necessary for harnessing alternative water use facilities as source of drinking water in the district.

Table-7. Dynamic Ground Water Resource Potential in Bongaigaon district. Gross dynamic ground water resource (mcm)

Drinking water (15%)

Utilizable ground resource(mcm)

622.21(3.46)

93.33(3.46)

528.28(3.46)

Source : www.planning commission.nic.in accessed on 16.02.2008 Note : Figures in italics are percentage to State totals.

12

5. Economy 5.1. Agriculture The economy of Bongaigaon district is basically agrarian in nature with about 80% of the population dependent on agriculture. Paddy is the major crop. Other important crops include oil seeds, pulses, cash crop like jute, vegetable etc. The agro climatic conditions of the district are conducive for various agricultural activities. Agriculture in the district is characterized by over dependence on rainfall, predominance of seasonal crops and traditional methods of cultivation. The sector contributes 38% of the total income in the Gross District Domestic Product while secondary sector contributes 19%. The tertiary sector’s contribution is estimated to be 43%. The per capita Gross District Domestic Product of Bongaigaon estimated at Rs.7619 is the second lowest among the districts of the state.

5.2. Industries and mineral base The district is endowed with natural mineral resources and has high industrial growth potential. The existing industrial base of the district comprises the BRPL (Bongaigaon Refinery & Petro Chemicals Limited) one of the large scale industries of the whole NE Region which has given more than 1700 Nos. direct employment. The two spinning mills at Noapara near Bijni and Boitamari, LPG Bottling Plant at New Bongaigaon, Bharatpur Oxygen Gas, Dhaligaon, are the other major industrial units in the district. Further, there are about 867 SSI units functioning in the district. The district has one industrial estate at new Bongaigaon with 35 sheds. The total number of registered SSI units in the district is 867 (1.71% of State total) and 36 registered factories which comprise of wood and wood products, saw timber etc. and food product and beverages. The largest concentration of industry is in around Bongaigaon due to availability of various infrastructure facilities. The infrastructural facilities available for the entrepreneurs include industrial estate with an area of 2,73,600 sq. ft with 35 sheds of which only 26 are functioning. There is an industrial area at new Bongaigaon with an area of 2,73,600 sq. ft where M/S Brahmaputra corporation and S.S. Dying industry have been established. There are four Commercial Estates one each at North Bongaigaon and Abhayapuri and Bijni. The commercial estate at Khasikotra has been developed for the ST population. The district has two growth centres at Khazira and Dhaligaon and the centre has been used for promoting pork processing unit.

13

5.3. Livestock and veterinary facilities Dairying is practiced by most of the small and marginal farmers and landless labours in the district and to them this activity provides economic security by serving as a hedge against crop failure. The economy of the district is highly dependable on agriculture and allied activities. Traditionally, diary farming is a subsidiary occupation of the farmers of the district. Despite the large population of live stock, the milk production in the district is low mainly due to predominance of local cows with a poor genetic make up.

Table-8. Livestock and Poultry population in Bongaigaon district. (as per Livestock census 2003) Cattle Indige- Cross nous breed

Buffaloes Indige- Cross nous breed

Sheep

Goat

Pigs

Horses & Ponies

Fowls

Ducks

319260

3809

16814

127300

34612

30

169358

670936

12533

2469

Source: Statistical Handbook, Assam,2006.

Though the district has conducive climate condition for poultry farming, particularly commercial broilers, the activity has not made any significant progress as majority of the population practicing poultry farming are under SF/MF categories whose risk bearing capacity is very less.

5.4. Sericulture The agro-climatic condition of the district is suitable for sericulture. The activity is specially practiced by the local people including SC/ST families in the district. Since sericulture mainly involves women in rearing and spinning, it has great potential for creating employment opportunities for them. Round 159 villages in the district are involved in sericulture activities. The present status of development is as follows.

Table-9. Status of sericulture in Bongaigaon district. Activity

No.of Families Involved 1604

Yield of cocoons(MT)

Muga Mulburry

Eri

18

Production of worms(MT) 13.78

Area under silk worm food plants (ha)$ 164.1

No.of Reeling units Nil

121

2823*

0.57

125.6

Nil

84

0.15

0.01

201

Nil

Note: * in ‘000 nos. $Taken from PLP, NABARD (2006-07)

Source: Statistical Handbook, Assam 2006.

The silk and weaving industry of Assam is one of the traditional handicraft activities which has generated employment and provided livelihood opportunities to people in the

14

district. It is the most important agro based cottage industry in the district in terms of employment and income generating activities.

5. 5. Plantation and Horticulture The district of Bongaigaon is under the North East Sub Tropical horticulture zone of India. The district has favourable agro climatic conditions for the development of various plantation and horticulture crops. However, the horticulture & plantation crops are generally not grown on commercial scale in the district. Approximately 104454 farmers are involved in growing horticulture crops. As per the estimates of PLP, NABARD 2006-07); the total area under plantation and horticulture in the district is 18839 hectares. The district has high potential for growth of citrus fruits, pineapple, areca nut, and medicinal and aromatic plants besides rubber plantation.

5.6. Roads Infrastructure and Connectivity 5.6.1. Roads The road density in the district per lakh population which stood at 79.4 km. in 1991 has increased to 109 km in 2005. Per sq. k.m road density in the district has increased from 25.5 k.ms. in 1991 to 39 kms. In 2005. the total road length in the district is 990 km of which only 25% is surfaced.

5.7. Banking Access to credit and banking facilities is an important indicator for socio-economic development. The total number of reporting offices in the district stands at 38 which comprises of SBI, SCB and OSCBs. The population coverage of banking services is estimated to be 26,613 persons per bank office as per the number of offices in 2006. the credit deposit number in the district ratio in the district which stands at 47.18% is much lower than the stipulated norm of 60%.

5.8. Health and Educational establishments The health infrastructure of the district includes 23 PHCs, 95 sub-centres and 10 dispensaries. The number of beds available in the government health institution is 90. the district has a total of 25 birth and death registration centres. Thus every PHCs/Subcentre in the district covers 6738 persons while number of beds is only 11 per one lakh population in the rural areas of the district. The educational establishments of the district are shown in the table below.

15

Table-10. Educational establishments in Bongaigaon district (2004 - 05) Educational establishments

Numbers

LP School

966

Middle School

288

High School

187

HS School

19

College

32

ITI

1

Teachers LP School

2456

Middle School

2427

High School

1782

HS School

613

Source: Statistical Handbook, Assam, 2006. An estimate of the teacher pupil ratio in the district shows that for every 51 primary students there is one teacher while in middle school the number of students is only 19 per teacher. In high school and higher secondary the teacher student ratio stands at 11 students per teacher. The high school student teacher ratio in the primary level is perhaps one reason for high drop out rate from primary to middle level school. The density of primary school in the district was estimated at 38 schools per sq. km. area in 2005.

5.9. Basic amenities As per the records of Census of India 2001, the housing types in the district shows that 18% live in permanent houses, 39% live in semi permanent and 43% occupy temporary houses. In respect of amenities in rural areas, there are facility wise variations. The total number of census villages in Bongaigaon district is 917 as per 2001 Census while the total number of inhabited villages in the district stands at 881. The population of the villages as per Census 2001 is 795053 persons. The caste wise distribution of village population shows that 10% of the village population belongs to SC while 13% belong

16

to ST.

Table-11. Distribution of Amenities in inhabited villages in Bongaigaon district. Amenities

Numbers(Percentage)

Total inhabited villages

881

Total Households

168556

Safe Drinking water facilities

876 (99%)

Electricity (Power Supply)

839

Electricity (domestic)

839(95%)

Electricity (Agriculture)

11(1%)

Primary School

805(91%)

Middle Schools

340(39%)

Secondary/Sr. Secondary schools

138(16%)

College

4(0.45%)

Medical facility

112(12.71%)

Primary Health Centre

25(2.84%)

Primary Health Sub-Centre

35(4%)

Post, telegraph and telephone facility

132(15%)

Bus services

299(34%)

Paved approach road

347(40%)

Un-paved approach road

385(44%)

Source: Statistical Handbook, Assam, 2006, Census of India, 2001.

The census data for the district reveals that access to safe drinking water is available in 99% of villages in the district. The connectivity status of the villages shows that 34% of the villages have bus services. The census records on conditions of approach road shows that 39% of villages have paved approach road while only 44% have mud approach roads. The infrastructural gaps in the villages have a bearing upon the overall economic status of the population and the employment scenario in the villages. A casual analysis of the development deficiencies in the rural areas of the district reveals that three major deficits in the rural areas are: connectivity-both physical and telecommunication, education-secondary and vocational educational institutions and access to credit particularly farm credit for investment. It may be noted that demand for investment credit in agriculture is also adversely affected by low level of electricity consumption for agricultural use in the villages. The deficit need critical intervention for synergizing the growth process in the district.

17

CHAPTER-III SECTORWISE ALLOCATION : SUMMARY 1.

AGRICULTURE ENGINEERING

Component

Name of Project

Unit Cost in Lakh

Qty (in Nos.)

Subsi dy Patter n

Schematic Amount/ Project cost (Govt. Share) in Lakh

Project No 1) Farm Mechanisation with Farm Machinery Training a) Powertiller A. Machinery Subsidy

B. Farm Processing

0.6

a) Sprayer 0.12 b )STW with Electric Pump 0.25 S Mechanised Paddy cutter e) 0.35 f) Manual Equipment Set Sub Total for Farm Machinery subsidy g) Onion Dehydrator Unit . 2.25

140

50%

84.0

1200 1200 30 0.02

50% 50% 75% 100%

1

100%

10.8 150.00 7.875 3.00 255.675 2.25

h) Turmeric Grinding Unit

2.25

2

i) Chilli Processing Unit

2.25

1

4.50

100%

2.25

100%

Sub Total for Farm Processing C. Farm Machinery Training

9.00

a) District Farm Machinery training Centre

20.0

Civil work: = 14.0 Machinery: = 6.0

100%

20.0

b) Training of Rural Mechanics

0.01

1000

100%

10.00

c) Incentive to Rural Mechanics

0.1

47

100%

4.7

Sub Total for Training

34.7

Office Expenses & Vehicle Maintenance

0.625

TOTAL COST ESTIMATE FOR PROJECT NO. 1)

300.00

PROJECT NO. 2) Construction of Cold storage of 2000 ton capacity in Manikpur Block @ 10,000/- per ton a) Machinery : 80.0 lakhs b) Site Dev., Boundary wall & other civil works : 120.00 lakhs

200.00

Grand total Estimated cost of Agricultural Engineering Sub Sector

Rs. 500.00 Lakhs

AGRICULTURE (GENERAL)

2.

A. GENERAL AGRICULTURE Sl. No.

Name of Project

1

Demonstration of crop diversification

Schematic amount (Rs. in lakh) Rs. 22.50

2

Establishment of Agri. Clinic cum Service Centre

Rs. 75.00

SubTotal Rs. 97.50 lakh

18

B. HORTICULTURE Sl. No.

Name of Project

1 2 3

Area expansion of Veg. & fruit crops Mushroom Production Unit Capacity Building (Farmers training)

Schematic amount (Rs. in lakh) Rs. 195.00 Rs. 50.00 Rs. 17.50 Sub Total Rs. 262.50 lakhs

C. AGRICULTURE MARKETING Sl. No.

Name of Project

1

Infrastructure Development (Construction of Marketsheds)

Schematic amount (Rs. in lakh) Rs. 40.00

Sub Total Rs.40.00 lakhs Grand Total(A+B+C) Rs.400.00 lakhs

DISTRICT RURAL DEVELOPMENT AGENCY

3.

Sl. No. 1

Name of Project Construction of dwelling houses with Low-cost Sanitary Latrine and Hand Tube well for beneficiary of Minority Communities (2000 unit) @Rs.35,000/Total

Schematic amount (Rs. in lakh) Rs. 700.00

Rs.700.00 lakhs

4. PUBLIC HEALTH ENGINEERING Sl. No. 1

Name of Project Installation of singur Hand Pumps (847 Nos.) @Rs.17,700/Total

Schematic amount (Rs. in lakh) Rs.150.00 Rs.150.00 lakhs

5. EDUCATION I) SECONDARY EDUCATION Sl. No. 1

2

3 4 5 6

Name of Project Construction of 6 No. of addl. Classroom with library cun reading room and toilet facilities for both boys and girls to 3 nos. of prov. HSS & 1 no. of prov. Sr Mad. @Rs.17,06,000/- each. Construction of 3 nos. of addl. classroom with library cum reading room and toilet facilities for both boys and girls to 11nos. of prov. high school/Mad. @ Rs.10,62,000/- each . Construction of addl. class room for 26 nos. of Recognized High school/[email protected],00,000/- to each Construction of addl. Class room @ 10,00,000/for 10 nos. of non-provincialsed degree colleges Purchase of furniture for school/Madrassa. Purchase of Book for school library Total

19

Schematic amount (Rs. in lakh) Rs. 68.24

Rs.116.82

Rs.130.00 Rs.100.00 Rs.100.00 Rs. 33.44 Rs. 548.50 lakhs

II) ELEMENTARY EDUCATION Sl. No. 1

Name of Project Bldg.construction (200 no @ 1.00 Lakh) Total

Schematic amount (Rs. in lakh) Rs 200.00 Rs. 200.00 lakhs

III) COLLEGES Sl. No. 1

Name of Project Setting up of Modern ICT & Vocational center for minority community student at Colleges. Total

Schematic amount (Rs. in lakh) Rs.154.713 Rs. 154.713lakhs

6. HEALTH & FAMILY WELFARE Sl. No. 1 2

Name of Project Construction of Sub-Centre, @Rs.7.5 lakh X 4 nos. of S.C. River Ambulance cum mini Boat Clinic @Rs.15 lakh per Boat Clinic X 3 Total

Schematic amount (Rs. In lakh) Rs. 30.00 Rs. 45.00 Rs. 75.00 lakhs

7. PWD (RURAL ROADS) Sl. No. 1

Name of Project

Total

Schematic amount (Rs. in lakh) Rs.830.00 Rs.830.00 lakhs

Total

Schematic amount (Rs. in lakh) Rs.120.00 Rs.120.00 lakhs

Construction of all weather roads

8. PWD (STATE ROADS) Sl. No. 1

Name of Project Construction of all weather roads

9. IRRIGATION Sl. No. 1

Name of Project

Schematic amount (Rs. in lakh)

Flow Irrigation Scheme 2 Nos. at Bongaigaon dist. Total

Rs. 130.00 Rs. 130.00 lakhs

10. SERICULTURE Sl. No. 1

2

Name of Project Construction of Training cum Production center having sophisticated equipments with Hostel facilities including Water Supply & Electrification (For 10 Nos. Training in Each Group) Awareness Campaign & Skill up gradation training on Plantation, Silk Work rearing, Grainage Technology & Post Cocoon Technology for 7 days each group (10 Nos. Trainees) (Period 2008-09 to 2010-11)

20

Schematic amount (Rs. In lakh) Rs. 47.550

Rs.

7.355

3 4 5 6 7 8

Raising of Block Plantation of SOM 15 acre & kesseru in 15 acre for 60 Nos. S.H.Gs (1/2 Acre for each S.H.Gs) Raising of Som & Kesseru Nursery Assistance to Provide Modern rearing equipment @Rs.12,500/- for each Group Maintenance cost of Plantation for 2nd & 3rd year Supplying of Eri Spinning Machine with 50% Subsidiary ate @Rs.5500/- each. Administration Cost Total

Rs. 7.500 Rs. 1.250 Rs. 7.500 Rs. 2.200 Rs. 1.650 Rs. 0.095 Rs. 75.00 lakhs

11. FISHERIES Sl. No. 1 2 3 4 5 6 7

Name of Project

Schematic amount (Rs. in lakh)

Development of Beel Fisheries/ Dead River Construction of Community Tank Development of Community Tank Construction of Hatchery Construction/ Renovation of Tank of SHG/ Integrated Fish Culture Training Awareness Camp

Rs.50.00 Rs.15.00 Rs.5.00 Rs.12.00 Rs.15.00 Rs.2.00 Rs.1.00

Total

Rs.100.00 lakhs

12. HANDLOOM &TEXTILES Sl. No. 1 2 3 4 5 6 7 8 9 10

Name of Project Training of Weaving Training on dyeing Supply of looms & accessories @Rs.8000/-x 160 Nos. Pre Weaving @Rs.8000/-x 10 Nos. Jacquard Machine @Rs.4000/-x 40 Nos. Yarn @Rs.1000/ each X 160 Nos. Training centre cum production Hall 10 Nos. x 4.00 lakhs Furniture @Rs.40,000.00x 10 Nos. Design Development (Rs.10,000/-x 10 Nos) Administrative and Publicity

Schematic amount (Rs. in lakh) Rs. 5.60 Rs. 7.05 Rs.12.80 Rs. 0.80 Rs. 1.60 Rs. 1.60 Rs.40.00 Rs. 4.00 Rs. 1.00 Rs. 0.55 Total Rs.75.00 lakhs

13. ANIMAL HUSBANDRY & VETERINARY. Sl. No. 1 2 3 4

Name of Project Semi intensive Goat farming for SHG beneficiary @Rs.1.00 lakh x 35 unit. Semi intensive Pig cum Fishery for SHG beneficiary @RS.1.00 lakh x 40 unit. Semi intensive Duck cum fishery for Women SHG @Rs.0.50 lakh x 30 unit CAPACITY BUILDING a) Awareness cum training of livestock farming @Rs.27,000/- x 26 Nos. b) Training & Vaccination camp of livestock @Rs.10,000/- x 30 Nos. Total

21

Schematic amount (Rs. in lakh) Rs.35.00 Rs.40.00 Rs.15.00

Rs. 7.02

Rs. 3.00 Rs.100.02 lakhs

14. DAIRY Sl. No. 1 2 3

Name of Project

Schematic amount (Rs. in lakh) For organization of Dairy Cooperative Society Rs. 16.51 Support for Milk production Rs.150.00 Support for Milk processing Rs. 58.49 Sub Total Rs.225.00 lakhs Less 50% of cost of animals which is under the beneficiary and (-)Rs.75.00 bank loan as per funding pattern 10:40 through NABARD’s Venture Capital Fund scheme Total Rs.150.00 lakhs

15. INDUSTRIES & COMMERCE Sl. No. 1

2

Name of Project Construction of 2 (two) Nos. “Entrepreneurship Development Training Halls (Edth)” one in Bongaigaon Subdivision and the other in North Salmara Subdivision Arrangement of Training programmes on Jute Craft/ Jute Diversified products for the Unemployed Youths of Minority Community of the district with an objective of Employment Generation Total

Schematic amount (Rs. in lakh) Rs.30.097

Rs.27.90

Rs.57.997 lakhs

16. FORESTRY 3) Sl. No. 1 2

3

4 5 6

SOCIAL FORESTRY Name of Project

Schematic amount (Rs. In lakh) Rs. 5.00

Farm Forestry/ Agro Forestry Medicinal/ Aromatic Cultvt” Agaru/ Sandal Patchauli Vetiver Sarpagandha Amlakhi, Bahera, Hilikha Nursery (i) MAP Nursery (ii) Forestry Nursery Income Generating Bee-hives Community Welfare Bio-Gas plant Awareness/ Training of farmers on bee-keeping/ MAP cultivation/ Nursery etc.

Rs. 5.00 Rs.10.00 Rs. 5.00 Rs. 2.00 Rs. 4.00 Rs. 5.00 Rs. 2.00 Rs. 1.50 Rs. 5.00 Rs. 1.25 Total

Rs.45.75 Lakhs

Total

Schematic amount (Rs. In lakh) Rs.25.00 Rs. 3.50 Rs. 5.00 Rs.33.50 Lakhs

II) TERITORIAL FOREST Sl. No. 1 2 3.

Name of Project Nursery Orientation Bamboo Nursery

22

17. INDUSTRIAL TRAINING INSTITUTE Sl. No. 1 2 3 4 5 6

Name of Project

Total

Schematic amount (Rs. in lakh) Rs.70.00 Rs.10.00 Rs. 2.00 Rs. 9.00 Rs. 6.00 Rs. 3.00 Rs.100.00 lakhs

Total

Schematic amount (Rs. in lakh) Rs. 7.20 Rs. 3.00 Rs. 3.60 Rs. 3.00 Rs.16.80 lakhs

Civil works (Theory and Workshop Building) Tools & Equipments Furniture Remuneration Training Materials Stipends

18. EMPLOYMENT Sl. No. 1 2 3 4

Name of Project Career counseling & V.G. Programme 12 Nos. Printing of career literatures/ guide books 2000 Nos. Mobile camp registration programme, 12 Nos. Training Programme 2 Nos.

19. SOCIAL WELFARE Sl. No. 1 2

Name of Project Supply of Anganwadi materials & Equipments Distribution of sewing & knitting machine & beautician kits Total

Schematic amount (Rs. in lakh) Rs.17.31996 Rs. 80.72 Rs.98.03996 Say Rs.100.00 lakhs

20. CHAR DEVELOPMENT PROJECT Sl. No. 1

Name of Project Lift Pump Total

Schematic amount (Rs. in lakh) Rs 24.00 Rs 24.00 lakhs

21. BONGAIGAON MUNICIPALITY BOARD Sl. No. 1 2 3

Name of Project All drain within BMB Construction of Modern Guest House for Minorities at Bongaigaon (R.C.C. Two Storied) Construction of Youth Hostel for Minority Students (Two Storied R.C.C. bldg. with 30 Students capacity

Schematic amount (Rs. in lakh) Rs.150.00 Rs. 50.00 Rs. 50.00 Total

Rs.250.00 lakhs

22. ABHAYAPURI TOWN COMMITTEE Sl. No. 1 2 3

4 5 6

Name of Project Construction of Pucca drain & slab of Tengnamari Road in Ward No.4

Construction of Pucca drain at Kabarsthan Road in Ward No.2 Construction of GSB, WBM-II, WBM-III and premix carpeting Road from Muksed Ali’s residence to Biswambar Pathak residence in Ward No.4 Construction of 4 Nos. 1.50m span R.C.C. Slab Culvert at Tengnamari Road in Ward No.4 Construction earth filling of Road at L.B.S. Link Road in Ward No.4

Construction of Black topping of Kabarsthan Road in Ward No.2

23

Schematic amount (Rs. in lakh) Rs.13.10 Rs. 9.50 Rs.12.23

Rs. 4.58 Rs. 4.87 Rs. 6.00

7 8 9 10 11 12

Construction of 2 Nos. 1.50m span R.C.C. Slab Culvert at Kabarsthan Road in Ward No.2 Construction of Praneswar Choudhury Road by WBM-II, WBM-III and premix Carpeting with seal coat in Ward No.4 Construction of 1.50m. span R.C.C. Slab Culvert at M.A.K. Azad Link Road in Ward No.4 Construction of Kumud Narayan Road by GSB, WBM-II, WBM-III and premix Carpeting with seal coat in Ward No.3 Construction of Black topping Road from P.W.D. Main Road to Goni Fakir house Ward No.1 Supply of Sodium Vapour street light set for Ward No.4, Nayapara, Tengnamari area and Ward No.1 & 2 at Rowmari Minority Community dominated area

Rs. 2.29 Rs. 3.86 Rs. 1.145 Rs. 6.89 Rs. 8.66 Rs. 5.495

Total

Rs.78.62 lakhs

23. PWD BUILDING Sl. No. 1

Name of Project

Schematic amount (Rs. in lakh) Rs.389.00

Construction of Community Hall for Sikhs, Buddhist and 8 Nos. Assam Type Community Hall for other minority communities at various places of the district.

Total

Rs.389.00 lakhs

Total

Schematic amount (Rs. in lakh) Rs.93.00 Rs. 4.50 Rs.22.50 Rs. 7.50 Rs. 7.50 Rs. 7.50 Rs. 4.50 Rs. 3.00 Rs.150.00 lakhs

24. TOTAL LITERACY CAMPAIGN Sl. No. 1 2 3 4 5 6 7 8

Name of Project Literacy Training (TLC & PLC) SHG Training Skilled Development Training Community Development Environment building Monitoring & Supervision Evaluation Contingencies

Contingencies 0.5% Monitoring & External Evaluation 0.5%

= =

24

Rs. 28.05 Lakh Rs. 28.05 Lakh

CHAPTER-IV SECTOR WISE PLAN SCHEMES

25

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR AGRICULTURE ENGINEERING

PROJECT COST – Rs. 5.00 CRORE 2007-08 To 2011-12

CONCEPT PAPER 1. Introduction: The Agricultural Engineering Sub-sectoral Plan for the ensuing three year Multi Sectoral Development Plan (MSDP) for Development of Minority community in Bongaigaon district envisages support to the growth of the minority community in the district in the crop husbandry sector by increasing farm power availability from 0.5HP/Hact to national average level, increasing trained manpower in farm machinery repairing manpower in the district, improving current STW irrigation coverage and improving post harvest management of crops by promoting use of modern storage methods which prolong the self life of agricultural produce. A modern cold storage plant is planned to be constructed with an amount of Rs 200.00 lakhs under PPP (Public, Private and Partnership model). A plan involving Rs.500.00 lakhs for the period 2008-09 to 2010-11 under the two following prioritized projects , namely a) Farm Mechanisation Project with Farm Machinery Training & b) Establishment of 2000 tonne capacity Cold storage plant, has been formulated with this aim.

2. General Agricultural feature of the undivided Bongaigaon district 2.1 Agroclimatic condition: The district of Bongaigaon falls under Lower Brahmaputra valley zone C based on variation in altitude. Against the total geographical area of 162840 hac, the undivided district has 102703 hactre cultivable land , out of which 39674 hac is flood prone. The district is further divided into five different Agro ecological situation as follows: Table-12. The blockwise division of the district into different zones is as follows: Name of Block

Land area (hac) Foot hill

2.2

Flood prone

Flood free

Char

Hills

Manikpur

-

12617

15420

-

-

Dangtol

-

1206

16884

-

6030

Boitamari

-

6020

7224

7224

3612

Tapattary

-

7164

1432

5731

-

Srijangram

-

6095

14221

-

-

Borabajar

21353

6570

3285

-

1642

Sidli

-

-

19104

-

-

Total

21353

39672

77570

12955

11284

Rain fall: The district receives average rainfall of around 3000 mm with about 140 days of rainy days, mainly during the Kharif period of May-September. . But the spatial variation is wide among the various sub agroclimatic areas. Borobajar & Sidli blocks on the Himalayan

25

border receive

much lesser rainfall than the Srijongram & Tapattary blocks on the

Brahmaputra. During the Rabi period of Nov-April, the northern areas under Chirang district are badly deficient in moisture & the other blocks also are moderately deficient in rainfall. 2.3

Drought & Flood: The incidence of drought in the Kharif period was pronounced mild in the year 2001, leading to destroyal of mainstay Sali paddy crop of 10% of the farm families. Similarly severe flood occurred in the same season in 2004 & 2007 played havoc with kharif agriculture affecting 48% farm families in Tapattary block, 40% in Boitamari , 30% in Manikpur, 31% in Borobajar, 28% in Srijangram & 12% in Sidli block. (Data: SREP, ATMA). This proves how much dependent, the farm sector on the mercy of the nature.

2.4

Land based Agriculture system: Agriculture is the source of livelihood of 70% of the rural population. Rice is the main crop of the district occupying 57% during Kharif & 43% during the Rabi season. The other important crops are Wheat, Rape & mustard, Jute, Sugarcane, vegetables, ginger, turmeric, cocnut , arecanut, pineapple, banana , jackfruit

2.5

Cropping System:. The common cropping system followed in the district are as follows: Manikpurblock: a) Ahu-Sali b) Ahu-Pulses 1. Borobajar: a) Ahu-Sali b) Ahu-Pulses c) Ahu- Oilseeds 2. Dangtol: a) Ahu-Sali b) Sali-Wheat/oilseeds/pulses 3. Sidli: a) Ahu-Sali b) Sali- Oilseeds/pulses 4. Boitamari: a) Ahu-Sali b) Sali- Oilseeds/pulses c) Ahu- vegetables 5. Tapattary a) Ahu-Sali b) Jute- Sali c) Ahu-vegetables

6. Srijongram: a) Ahu-Sali b) Sali- Vegetables c) Sali-Oilseeds 2.5.1. Crop Production: Table-12.1. The status of crop production in the district. Name of Block Manikpur Dangtol Boitamari Tapattary Srijangram Borabajar Sidli Total Productivity (qt/hac)

Ahu 6064 4310 6285 4220 3900 6178 3190 34147

Sali 10055 8481 9793 5797 6129 11065 7370 58690 26

Area under Crops (hac) Jute Pulse Oil seed 1221 960 1406 1022 2039 1530 1221 3445 3512 7.5

26

Vegetable 1278 1278

2.6 Land Utilisation Pattern: Table-12.2. The blockwise land use pattern is as follows: (area in Hac) Name of block

Geogra -phical Area

Cultivable area

Cultivated area

Cultivable Waste

Current Fallow

Forest

Pasture

Land put To non Agri.use

Land under misc. plantation

Barren & Unculturable Land (waste land)

Manikpur

28038

18905

17273

713

919

313

2750

3046

531

2493

Dangtol

24121

12433

11364

580

489

2967

3358

3230

990

1143

Boitamari

24080

15974

15497

627

350

379

3218

1269

876

2364

Tapattary

14329

7995

7312

679

397

227

2672

1499

811

1125

Srijangram

20317

11386

12234

741

418

315

3015

1127

973

1501

Borabajar

32851

22207

20288

881

1038

500

3535

3169

453

2987

Sidli

19104

11803

10789

426

588

965

2635

2122

704

875

Total

162840

100703

93857

4647

4199

5666

21183

15462

5338

12488

2.6.1

Soil Type: The soils of the district are mostly red, alluvial and mixed red. The soil texture is sandy loam to clay loam The soil is acidic in nature.

2.7

Operational Land holdings: Against total landholdings or farm families of

73, 832 nos

in the district, 66.14% are small & marginal having 74.8% of land under their possession). Big farmers constitute 11.7% but they possess 25.2% of the land. There are 18,790 nos. of landless families owning only 4087 hac of land. 2.8

Irrigation Status: 77% of the Net cultivable area is rainfed & only 23% is irrigated through canal lift irrigation & STW.

Table-12.3. The blockwise irrigation status . Irrigated area (Actual) in Hac

Name of Block

Rainfed area (Hac)

Minor

Lift

Well/ Borewells

Tank

STW

Other/ FIS

Manikpur

14844

766

766

-

-

3285

-

Dangtol

9748

600

-

600

-

2085

-

Boitamari

13996

300

300

-

-

1678

-

Tapattary

5170

64

-

64

-

2761

-

Srijangram

8004

278

-

278

-

5104

-

Borabajar

18904

2165

390

-

200

1138

1575

Sidli

9027

2220

-

420

-

556

1800

Total

79693

6393

1456

1362

200

16607

3375

Predominance of rainfed agriculture explains the low production & productivity of agriculture in the district.

27

3

Importance of Agricultural Engineering in Bongaigaon district: Agricultural Engineering discipline plays an important supporting role to agricultural

production activities through Farm Mechanisation leading to increased availability of farmpower to do quick succession of unit operations for double/triple cropping, e.g land preparation, interculture operations, efficient application of water , seed & fertiliser, harvesting & post harvesting operations like threshing, milling & storage. Prolonging the self life of perishable agricultural commodity like vegetables & fruit require storage at cold temperature & controlled humidity.

Table-12.4. Current position of agricultural machinery in the district. Name of Block

Nos of villages

Tractors

Power Tiller

STW

Manikpur

141

11

21

2390

Dangtol

104

17

34

Boitamari

158

6

Tapattary

100

Srijangram

Puddler

Weeders

Thresher

10

105

3

1590

9

101

2

35

1419

5

21

3

11

46

2241

9

111

2

112

12

90

3403

23

117

2

Borabajar

210

16

39

759

8

110

2

Sidli

113

9

24

371

7

98

2

Total

938

82

299

12173

71

763

16

The table above shows that the nos. of tractors & powertillers available per village is very low. As the nos. of operational irrigation systems are only around 10-12, STWs are providing crucial irrigation support to Rabi crops. Here again, the nos of STW vailable per village is quite low. NABARD has reported that the district should have 26000 nos. of STW to give agriculture its full potential .

3.1 Identification of Critical Issues & Problems Based on the data available with the department, the critical issues concerning agriculture from the point of view of agricultural engineering are summarized below: Low availability of Farm Power per hac cultivable land a)

Predominance of rainfed agriculture

b)

Low nos. of STW available for Rabi crop irrigation & preponderance of diesel driven pumpset leading to low income per Hac

c)

Very low availability of 3 phase electric line in rural areas affecting the prospect of use of electric motor driven pumpset for irrigation ( as 3 phase power supply is required for electric motors above 3 HP)

d)

In adequate agro processing facility & value addition

28

e)

Non adoption of machinery for rice transplantation

f)

Inadequate post harvest handling in vegetables & fruit

g)

Lack of cold storage

3.2 SWOT Analysis of Agricultural Engineering Sub Sector: Strength: 1)Abundant availability of ground water 2) Hardworking minority farmers , willing to take up challenges 3) Suitable climatic condition for fruit & vegetable cultivation 4) Diversified crops present for exploitation 5) Educated manpower available in rural areas Weakness: 1)Low investment capacity of farmers to take bank loan for machinery 2) Very low nos. of trained mechanics 3) Lack of 3 phase electric line, low use of electricity in agriculture 4) moist soil prevent use of heavy machinery like combine harvester 5) Very less facility available for agro processing & vaddialuetion Opportunity 1)Potential for setting up agro processing units 2) Unavailability of cold storage in nearby Goalpara & Barpeta 3) Very good communication facility due to rail & National highway 4) Trained manpower can take up provide self employment 5) Different types of agro clinics can come up & survive in largerly agrarian economy Threat: 1) Flood & drought 2) Frequent bandhs affect supply of machinery in time 3) Erratic electric supply 4) Decreasing size of land holding 5) Presence of large nos. of landless farmers with low investment capacity

4

Existing Schemes of Agricultural Engineering: The following schemes are in operation under the department: a) Land Reclamation b) Agricultural implements production c) Microwatershed Management d) Agro Service center : Quantum of plan

fund available under these salary driven

schemes is very low. At present the following projects are running:

29

e) AACP: Farm Mechanisation project: provision of tractor & power tiller at 20: 30:50 basis to 10 & 5 member ASG/SHG respectively f) AACP Irrigation project: provision of STW & LLP to 3-5 member ASG/SHGs at 50% subsidy g) AACP Land development Component: Microwatershed based small flow irrigation & drainage projects at 70% subsidy. h) AACP Market development project: Rural wholesale & Haatts at 80% subsidy i)

Provision of subsidized tractor & powertiller under State Priority Sector scheme, Assam Bikash Yojana & Macromanagement mode of agriculture & Rashtriya Krishi Bikash Yojana (RKVY)

5. Development Deficits of Minority Community Identified in Farm Mechanisation : The baseline survey of the Omeo Kumar Das Institute of Social Change & Development clearly states the following deficits among the minority community in undivided Bongaigaon district a) Out of about 60000 rural minority households, as per survey 15% & as per departmental data 7000 own a pumpset which is a critical input tool for any agricultural family living in the flood prone area. b) 35% of minority households don’t possess any worthwhile tool for production c) 67% possess a plough. d) Only 15% of minority use tractor & 16% use power tiller for cultivation e) Mechanised farm practice is low with low farm productivity f) Machinery or engine repairing trained manpower among the minority is very low g) The minority farming community is predominantly dependant on rainfall & predominantly doing seasonal crop depending on traditional method of cultivation h) Electricity in agriculture is only 15% The baseline survey is clear that agriculture related services can raise income of farm families & the dependant wage labourers.

5.1 Critical Gaps Identified: The following critical gaps are identified for action a) Farm Power availability has to be increased b) Trained manpower availability in farm machinery repair c) Use of electricity has to be increased d) Perishable agricultural commodity has to be stored in cold storage e) Agro processing has be encouraged for value addition

5.2 Goals Adopted to fill the Critical Gap The following goals are set up to address: a) Each minority village will have at least one power tiller

30

b) Each of 57 minority inhabited GP will have one farm machinery repair shop c) Instead of use of 5.0 HP diesel pumpset , minority farmer Agri service Groups(ASG) of all villages will be encouraged to use 2.0 HP electrical motor driven pumpset. d) Agro processing of turmeric, chilli to be encouraged & modern packaging machinery to be brought

e) A Freon Cold Storage of 2000 MT capacity to be built with help of Private sector 5.3 Strategy for Overcoming the Deficits: The following two projects a) Farm Mechanisation & 2) Cold Storage Construction are planned to be taken up under Multi Sector Development Plan for Minority during 2008-2011:

Table-12.5. Schemes in details Comp onent

Name of Project Unit Cost in Lakh

Unit

Qty

Subsidy Pattern

Sub Sector

Schematic Amount/ project (Govt. Share) in Lakh

A. Machinery Subsidy

Project No 1) Farm Mechanisation with Farm Machinery Training a) Power tiller b) Sprayer c) STW with Electric Pump Set

0.6 0.12 0.25

Nos Nos No

140 1200 1200

d) Mechanised Paddy cutter

0.35

Nos

30

e).Manual Equipment Set

% 50% 50%

7.875 75%

0.02

Nos

150

3.00 100%

c. Farm Machinery Training

B. Farm Processing

Sub Total for Farm Machinery subsidy

AGRICULTURAL ENGINEERING

84.0 10.8 150.00

a) Onion Dehydrator 2.25 Unit . b) Turmeric Grinding 2.25 Unit c) Chilli Processing 2.25 Unit Sub Total for Farm Processing a) District Farm 20.0 Machinery training Centre

Nos.

255.675 1

2.25 100%

Nos.

2

4.5 100%

Nos.

1

2.25 100%

Civil work: 14.0 Machinery: 6.0

100%

9.0 20.0

b) Training of Rural Mechanics

0.01

1000

100%

10.00

c) Incentive to Rural Mechanics

0.1

47

100%

4.7

Sub Total for Training

34.7

Office Expenses & Vehicle Maintenance

0.625

TOTAL COST ESTIMATE FOR Project 1)

300.00

31

PROJECT NO 2) Construction of Cold storage of 2000 tonne capacity in Manikpur Block @ 10,000/- per ton a) Machinery : 80.0 lakhs b) Site Dev, Boundary wall & other civil works : 120.00 lakhs

200.00

Grand total Estimated cost of Agricultural Engineering Sub Sector

500.00 Lakhs

6. Brief details of the projects planned: Project No 1. Farm Mechanisation Project with Machinery Training This project is planned with a view to improve the availability of modern farm machinery in minority areas from current level to a desired level at the end of year 2011. The availability of trained manpower & workshops is planned to be addressed in a systematic manner by establishing a Farm Machinery Training Centre at Bongaigaon where course curriculum is to be adopted from the Central Farm Machinery Research & Training Centre , Biswanath Chariali. Four nos of Farm processing units are planned under this scheme where SHGs will be encouraged to process, package & market their produce in a modern fashion. The following three components are placed with details:

6.A Component : Subsidy for Farm Machinery Farm Mechanisation involves introduction and use of modern prime mover based machines for all the sub processes of entire gamut of agricultural crop production like ploughing, fine tilth preparation, sowing, and interculture operations like, weeding, fertilizer application, harvesting, threshing and packaging for storage. Use of tractor and power tiller in the district is limited mainly to soil preparation activity only. The district including Chirang has about 100 nos tractors and 290 nos. power tillers apart from locally available bullocks to help prepare land for cultivation. It is estimated that another 350 tractors and 700 power tillers will be necessary for three crops per year use of the land for maximising agricultural production. Zero tillage planters, tractor drawn harvesters and self propelled reapers, tractor drawn land levellers, potato planters & diggers, rotavators etc. are new agricultural machinery which need introduction in the district for use by the farmers. The following are the point wise procurement for farm mechanization proposed under MSDP during the project period 1) Procurement of powertiller 140 nos. at 50% subsidy with max. of 0.84 lakh 2) Procurement of sprayer 1200 nos. at 50% subsidy 3) Procurement of STW with electrical pumpset at 50% subsidy 4) Procurement of mechanized Paddy cutters at 75% subsidy 5) Procurement of manual equipments150 nos @0.02 lakh at 100% subsidy

6A.1 STW with Electrical Pumpset- The total cultivable area under the district is 1.03 lakh hac under 660 villages in 5 blocks. Against this, under the Irrigation Department there are six

32

working DTW schemes providing 2408 Hac Net Irrigated Area (NIA). Agricultural Engineering has constructed about 11,325 Shallow tube Wells(STW) with diesel driven pumpsets in the undivided Bongaigaon district from 1989 to 2004. And under AACP program 1000 nos of STW have been installed against target of 3000. As per the survey report of OKDIDR, the ownership pattern of pumpset among minority community is about 73%. It is estimated that against this 12,325 nos. of pumpsets in the district, about 8,4 00 nos i.e. 75% is owned by about 40,000 odd minority families in the district.

Increase in both

rainfed Rabi crop area and irrigated land area is absolutely essential to produce more pulses, oilseeds and cereals for achievement of a 2% growth rate in agriculture sector. Ownership of pumpset by 3-5 member group of minority families belonging to the BPL strata will help increase the Rabi crop area as about 75% of the minority families live in flood prone areas. Actual field observation indicate to need of eradication of following two prominent constraints:

1) The lower strata of minority is still unable to own pumpset due to the maximum limit of 10000/- per STW prescribed by the World Bank. 2) Almost zero use of electricity in irrigation & the resultantly high input cost of diesel & kerosene is reducing the per Hac income of farmers to a very low level Hence emphasis on water use efficiency by using sprinkler irrigation set in Char areas is required. Moreover, there is a need to shift to electric motor driven pumpset as per situational feasibility ( use of 2 HP motor in case of single phase line & above 3 HP motor in case of 3 phase power line) is the need of the hour. The following two components are proposed to be implemented under MSDP:

Provision of electrical pumpsets for STW Irrigation- It is proposed to take up 3000 nos. additional STWs under MSDP during the period 2008-09 to 2010-11 to bring another 3600 hac under irrigation in the minority in habitated areas.

It is expected that 2000 nos. of STW will be

additionally provided to minority areas under currently running (2004-2010 AACP program. Taking the NABARD approved unit cost of Rs 0.29 lakh per STW, a total amount of Rs 435.00 lakh will be required against total cost of Rs.870.00 lakh. Against the unit cost of Rs 29000.00 , the selected Agril Service Group of 3-5 farmers will have to bear Rs 14,500.00.

Financial Implications of Subsidy for Farm Machinery Tabl-13. Year wise Fund Requirement of Farm Machinery subsidy programme i. Physical in Nos. ii. Financial Rs. in lakh Sl No. 1. 1 2

Items

Unit cost

Power tiller

0.6

Sprayer

0.12

Electric Pump Set for STW at 50%

0.125

Unit

Year wise requirement of fund 2008-09 2009-10 2010-11 50 50 40 30.0 30.0 24.0 400 400 400 3.6 3.6 3.6 400 400 400 50.00 50.00 50.00

Physical Financial Physical Financial Physical Financial

33

Total 140 84.00 1200 10.8 1200 150.00

1

Mechanised Paddycutter Manual Equipment Total

2

0.35 0.02 87.225

Physical Financial Physical Financial 87.225

10 2.625 50 1.0 81.225

10 2.625 50 1.0 255.675

10 2.625 50 1.0

30 7.875 150 3.00

6. B. Farm Processing Component : Post harvest processing of spice crops like chilli, turmeric, ginger etc produced in he minority areas require unit operations like threshing, drying, winnowing, storage and packaging locally for value addition. This will help the future efforts of farmers to grow more, in diversified items and in a sustained manner. Secondary processing of food items is of industrial nature. Hence, keeping in view of the possible growth of primary agricultural growth of about 2% in next FYP, specially in minority areas, it is proposed to take up measures which enhance the capacity of the farming organizations like FMCs, primary cooperatives, Bajar committees etc. to buy spice products like Onion, Turmeric, Chilli etc from the farmers, do primary processing on it and sell it for market consumption in packaged form . The following items are proposed under this component

6.B.a).Onion Dehydrator Unit : 5 nos. of onion dehydration unit s are proposed to be set up @Rs2.25 lakh each in Srijongram , Tapattary , Manikpur, Dangtol & Bijni blocks. The amount of Rs 2.0 lakh will take care of the plant & machinery part & Rs 0.25 lakh will be spent for training. Eligible SHG/FMCs will have to link with a commercial bank for working capital . The SHG will have to arrange the house of the unit.

6.B.b) Turmeric Grinding Unit : Similarly 5 nos. of turmeric grinding & packaging units are proposed to be established in turmeric growing areas of Dangtol & Manikpur block. The amount of Rs 2.0 lakh will take care of the plant & machinery part & Rs 0.25 lakh will be spent for training. Eligible SHG/FMCs will have to link with a commercial bank for working capital . The SHG will have to arrange the housing of the unit.

6.B.c) Chilli Processing Unit : One no. of chilli drying units is proposed to be established in chilli growing areas of Srijangram block . The amount of Rs 2.0 lakh will take care of the plant & machinery part & Rs 0.25 lakh will be spent for training. Eligible SHG/FMCs will have to link with a commercial bank for working capital . The SHG will have to arrange the housing of the unit.

Financial Implications Tabl-13.1. Year wise Fund Requirement of Farm Processing Component . Sl Items No.

i. Unit cost

1.

2.25

a Onion Dehydrator Unit

Physical in Nos. ii. Financial Rs. in lakh Unit Year wise Total requiremen t of fund 2008-09 2009-10 2010-11 Physical 2 2 1 Financial 4.5 4.5 2.25

34

5 11.25

2.

b Turmeric Grinding Unit

2.25

Physical Financial

2 4.5

2 4.5

1 2.25

5 11.25

3.

c Chilli Processing Unit

2.25

Physical Financial

1 2.25

0 0

0 0

1 2.25 24.75

6.C Farm Machinery Training Component In view of the set target as above, the following components are planned :

6.C.a Establishment of District Farm Machinery Training Center -

Introduction of

large nos. of new rural machines will require trained manpower to operate, maintain and repair these machines. It is proposed to establish one training center at Bongaigaon under the Department in the District agriculture Office campus or any other plot of land prescribed by DC, Bongaigaon. Implementation of the same will require about Rs.12.0 lakhs for the civil works & 8.0 lakh towards machinery. The detailed project report will be submitted on receipt of approval from the Govt.

6.C.b

Rural Mechanics Training- As shown in the survey report, the availability of

mechanical skills among youth of minority community is very low. Even for minor repairing of powertiller & tractor , farmers have to run to Barpeta Road town for mechanic. It will be attempted to train 1000 nos. of rural youths @ Rs 1000.00 per trainee the amount being spent for training material, food & to & fro charges. . The training will be conducted by the department in collaboration with ITI & company concerned &

in repair and maintenance of agricultural

machinery like diesel engine, kerosene engine, tractor, power tiller & electrical pumpset It will cost Rs.10.00 lakhs for the period.

The detailed project report will be submitted on receipt of

approval from the Govt.

6.C.c Incentive to Rural Mechanics to open self employment workshop : 20 nos. of selected & trained youths will be provided with lumpsum assistance of Rs 20,000.00 each to open Rural workshops in various rural centres where this facility is not available at present. This will entail an amount of Rs 4.0 lakhs. The detailed project report in consultation with local ITI etc. will be submitted on receipt of approval from the Govt.

Financial Implication Table-13.2. Year wise Fund Requirement of Farm machinery Training Component .

i. Physical in Nos. ii. Financial Rs. in lakh Sl No.

Items

Unit cost

Unit

1.

a) Establishment of District Farm Machinery Training Center b) Rural Mechanics Trainingc) Incentive to

Civil: 12.0 Machinery: 8.0

2.

3.

Year wise requirement of fund 2008-09 2009-10 2010-11

Total

Physical Financial

12.0

8.0

0

20.0

Physical Financial

400 4.0

300 3.0

300 3.0

1000 10.0

Physical

10

5

5

20

35

Rural Mechanics to open self employment workshop

Financial

2.0

1.0

1.0

4.0

Total

18.0

12.0

4.0

34.0

7. Implementing Agency: Office of the AEE(Agri), Bongaigaon will be the implementing agency .

7.1 Existing & Proposed Mechanism for Implementation: All the component schemes proposed under the broadsheet , follow the subsidy norms prescribed by the Govt. of India for agriculture sector. The guideleines set by the Department of Agriculture, Department of Minority Welfare & the existing

District Selection Committee

notified for selection of beneficiary will be followed.

7.2 Management/Operation & Maintenance of Assets created: All the assets created under Component 6.1 & 6.2 will be maintained & managed by the local SHG/ASGs. The farm Machinery Training Centre will be managed by the Department of agriculture.

BRIEF PROJECT PROPOSAL ON CONSTRUCTION OF COLD STORAGE IN MANIKPUR BLOCK. 1. Introduction Cold storage is one of the major infrastructure lacking in the district of Bongaigaon. NABARD has identified that lack of storage facilities for excess quantity of perishable agricultural product like pineapple, mango, orange, jackfruit and different types of vegetables is creating problems for the farm producers community. The quantum of excess vegetables produced and traded in the Manikpur and Borobazar blocks has been identified as the main basis for establishment of a cold storage of about 2000 metric ton capacity. All the vegetable and fruit farmers especially, for the minority community will be able to abstract benefit out of the project with this. The self life of the produce can be extended. 2. Objective of the Project Though Bongaigaon is traditionally a agrarian one, the farmers are not able to produce up to their potential capacity due to inability to prolong self life of vegetables & fruits. They require a controlled atmosphere to keep their produce natural with freshness for about 100 days time. The objectives of the proposed Cold Storage are:1. To avoid wastage of perishable agricultural commodities. 2. To provide incentives to the farmers to produce up to maximum capacity. 3. To avoid distress sale of their produces particularly during peak season. 4. To provide maximum returns to the farmers compared to their investment in the production of horticultural produces.

36

5. To motivate farmers to produces more perishable commodities since the Cold storage is available for their producers. 6. To generate more employment in the respective district as well as neighboring districts of Bongaigaon. 2.1.A) Background of the Project : - The climatic condition, land type and topography, soil condition etc. being highly congenial for the practice of various kinds of crops and vegetables throughout the year, the productions and yield of crops are significantly high. The region itself is the major grower of vegetables like potatoes, chilies, peas, brinjals, cauliflower, cabbage, spices like ginger, turmeric, bay leaves, black leaves, black pepper, and fruit oranges, pineapple, passion, fruits, guava, palm etc. Preservation by cooling and enhancing the life of perishable fruits and vegetables in organized sector to get proper value of produces, would contribute to the economic growth and industrialization. Availability of perishable fruits and vegetables becomes abundance during its harvesting seasons and currently has sold at very cheap rates by the farmers of the District. As a result, the farmers cannot realize its value and incur losses and finally get discouraged. At present, there is no cold storage available in the district where the perishable fruits and vegetables can be preserved and bring to the market when its harvesting season is over and farmers can realize its proper value in order to make agricultural business a profitable business out of their own products. (B) Location (i) Proposed project site selection in Manikpur block on NH 31

between Patiladoha &

Rakhaldubi (ii) Assessment of Environmental impact on the Project site: - The project site selection is to be away from major human habitat. Further, it does not cause any environmental pollution. As such, obtaining clearance from Pollution Control Board is not necessary. (iii) Availability of Cold Storage in nearby areas: One cold storage is in final stage at Kokrajhar. Another one is coming up at Kajalgaon. Barpeta & Goalpara have no cold storage facility. (C) Description on Initiative of the Proposed Project :-The proposed Cold storage of 600 m2 will be equipped with sufficiently spaced Truck yard, unloading bay, screening and grading rooms, security check post and their change cum rest room, Office room with Bank facilities and an auction yard. Specious internal road for the movement of vehicle bringing materials for the storage and auction shed for auction, parking place for the visitors vehicles also have to be incorporated in the report.

37

Staff quarter with Gr. IV staff along with garage and water facilities are also kept in the project. Provision for storage of water and electric power back – up for uninterrupted power supply is to be made by providing a diesel Generator of 340 KVA. For cold storage. Provision of boundary Walls, Streetlights and amenities for public utilities, and proper drainage facilities. (D) Technology : The proposed Cold Storage is planned as a multi commodity cold storage with 2000 MT capacity comprises of four chambers to be maintained at a temperature of 2° C to 8 ° C using Freon Refrigerant. This technology being new is commonly used in many new and renowned Cold Storage in India, now a days. This technology for Cold Storage was developed after studying the requirement of the storage temperature of perishable commodities. Carrier/ Fedders/ KIRLOSKAR COMPRESSOR “KC” series having guarantee and durable for longer period with maintenance is proposed in the Project Report. (E) Management Arrangement:- It is proposed in the Project report that the Cold Storage will be set up under the management of PPP (private public partnership). It is proposed that the Assistant Executive Engineer (Agri.), Bongaigaon, of the Department of Agriculture, Assam will be the nodal Officer for implementation of the Project.

Table- 14. Implementation Schedule Sl. No.

Different Project activities

Time schedule

1.

Preparation and submission of the DPR to the Govt.

00 to 01 Months

2.

Sanction of fund/ EOI

01 to 03 Months

3.

Preparation of land documents by DC and Settlement Office.

03 to 04 Months

4.

Calling of Bid for construction of Civil works pertaining to the 04 to 06 Months. Cold Storage & residential Campus.

5.

Construction of Buildings & Structures, ordering and procurement 16 to 10 Months of required Plant & Machineries.

6.

Erection & commissioning

10 to 12 Months

7.

Starting of the Cold Storage for commercial business.

12 Months onward

3. Details of Cost Estimate and Project Budget :- The item wise detail estimate to assess the involvement of cost in each item for the construction of the entire project is calculated and furnished below.

38

(I) Cost Abstract of Different Items for the Cold Storage (Civil Work) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.

Cost on construction of internal roads Cost on development of site of land for construction Cost of construction of Cold Storage Plant Building Cost of construction of boundary wall Cost on construction of Unloading, Screening & Grading Yard Cost on construction of Auction centre Cost on construction of Check post Cost on construction of Weigh Bridge Cost on construction of Office facilities Cost on construction of Drivers shed with amenities Cost on construction of Security change room Cost on construction of managers Qtrs (1Nos) Cost on construction of Gr. IV Qtr. Twin type (2 Nos.) Cost on construction of over head tank and bore well Provision of water supply to the campus and cold Storage Provision of campus light for the project

Total =

Rs 120.00 lakh

(II) Cost on plant & machineries for the cold storage 1. 2. 3. 4.

Common Highside Equipments for cold storage Low side Equipments for cold storage Installation of all exposed walls with EPS insulation finished with chicken ware mesh Installation charges of plant & Machineries along with a Diesel generating set of 340 KVA as back up electric supply to give uninterrupted power supply.

Total for Machineries & Equipments

=

= Rs 35.00 Lacs = Rs 20.00 Lacs = Rs.20.00 Lacs = Rs 5.0 Lacs

Rs 80.00 Lacs

(III) Miscellaneous Cost on Fixed Assets :- This will include the items required for Offices, banks, Guest House, expenses on installation of Transformer for electricity, requirement of training to generate man power to run the Cold Storage in an efficient way for profit earning 1.

Office equipments and furniture including Taxes

2.

External

&

Internal

Electrification

including

= Rs 5.50 Lacs installation

of = Rs 15.50 Lacs

Transformer etc. 3.

Expenses on Training & Visit by the Staff

= Rs. 2.00 Lacs

4.

Unforeseen expenses to be incurred during the time of implementation = Rs 2.00 Lacs of the Project.

Rs 20.00 Lakh Rs 220.00 Lakh

Grand total cost of the project = (I+II+III) = (Rupees two crores twenty lakhs ) only. IV) Working Capital requirement for 2 years = Rs 20.00 Lakh -------------------------------------------------------------------------------Grand total ; Rs 240.00 Lakhs Detailed estimates are enclosed in Annexure I, II & III respectively”.

39

(F) Financial and Economic Analysis: -The farmers & traders of Horticultural crops of the Districts are willing to extend their co- operation to utilize these facilities proposed to be created. It is estimated that 2000 MT of potatoes and chilies etc contained in 24000 bags each of 85 kg will be made available for storage for one season of crop, remaining period, milk and its product & other vegetables like peas, fruits like oranges, spices like ginger, turmeric, black pepper, coriander will be stored. As a result, whole year there will be crops available for the Cold Storage.

Income from the Project: In the proposed project, the realization out of potato and chilies rent has been considered. The prevailing rate of potatoes & chilies per bag of 85 kg is Rs. 80/bag/season of 3-4 months, and for extension of storage period for another season will be at half rate i.e. Rs. 40/bag. These rates are very reasonable which the farmers can afford and by charging these rates the operator will earn a reasonable profit. On the other hand the grower and the traders will also be benefited out of this Project. Fixed Expenses:-

(i)

Electricity Bill

(ii)

Salaries to Manager & operator/Chowkider

(iii) Insurance on Plants & Machineries, Building etc (iv) Expenses on publicity & advertisements etc (v)

Running expenses of Machineries on fuel, salt, oil & gas etc.

(vi) Repair & maintenance, which will vary every year (vii) Expenses on Telephone Bill (viii) Legal expenses (ix) Depreciation on plants & Machineries and Building every year On the other hand, the income will generated out of the products stored in the Cold Storage, rent on Auction Shed & Bank facilities and reimbursement of Electricity Bill from the Govt. The detailed Financial Analysis with calculation on internal rate of return(IRR), break-even point etc. of the project will be formulated after Expression of Interest is float from interested Private Partners & their private equity participation. (G) Post- Implementation Management issues Relating to the Subsidy :- Setting up of a new Cold storage or expansion of the existing one requires permission from the State Government through the Director of Horticulture, Marketing Assam. On completion of the Project, Factory

40

License is provided on furnishing the completion reports. The concerned Department/ Organization normally do operation and maintenance of the Project. The proposed Cold Storage will be a new one to the Bongaigaon area, since there is no Cold Storage installed earlier in the area. The operation & maintenance of the Project will be done by the private operator through the Department of Agriculture. The Private operator will have to bring in promotional contribution and working capital requirement from a commercial bank. In lieu P.O. will provide lease rental to the Govt. A detailed EOI will be called shortly to invite proposals. There is ample of opportunities for marketing facilities of the stored products at Guwahati, Tezpur, Tura, Dimapur & other oil towns etc. Considering the quantum of inflow of goods to be stored and the availability of marketing facilities, it is certain that the Project will be self sustainable in future. (H) Return of Investment:- It is estimated that out of spending an amount of 240.00 Lacs, including private participation of 40.0 lakh, the return will start from the successive year and will continue to rise every year. All expenses, depreciations of the machineries maintenance etc the pay back period is calculated to be 7 years, which is considered to be a viable project. (I) Means of Finance & Sources of Fund: - The project investment is proposed from MSDP scheme. National Horticulture Board will be approached for 33% subsidy (Max. 66 lakh) Estimated cost

MSDP Scheme

Contri. Of Private

( Rs in lakh)

(lakh)

participant(lakh)

(A) Capital investment

2.20

200.0 lakh

20.0

(B) Working capital

0.20

0

20.0

240

200.0

40.0

Total

Participation of a Private Operator of the Scheme will be brought with working capital etc investment capacity of Rs 40.0 lakh. (J) Subsidy from National Horticulture Board: The NHB will be approached to provide 33% subsidy ( max Rs. 66 lakhs) for the project from their scheme.

41

ANNEXURE – I (II) List & Cost of Plant Machineries : (A) Common Highest Equipment for the Cold Storage: Sl. No. 1.

2.

3.

4.

5.

6.

7. 8. 9.

10. 11.

Description of Plant & Machineries

Qty

Kirloskar KC – 3 single stage Ammonia reciprocating Compressor, complete with suction and discharge stop valves, flanges, counter flangs, drive set comprising of fly wheel, motor pulley, V- belt, HP, LP cutouts, suction, discharge oil pressure gauges, solenoid valves for automatic capacity control and unloading tools and gaskets complete with base frame and foundation bolts. Compressor having a capacity of 57 Tons at -5°C. suction, + 40 °C. condensing temperature and running at 750 RPM, absorbing 52.2 kw. Is suggested. Kirloskar /NGEF /Crompton make 75 HP SPDA squirrel cage induction motor, 1440 RPM, 3 phase, AC supply, 50 cycles, 440 Volts for above compressor. Star delta strarter L & T/ Siemens make (to be provided in the panel board for the above motors. High pressure Ammonia Oil separates of size 16" dia. x 4 ft. long for the above compressor complete with flanged connections with companion flanges and oil drain valve. High pressure Ammonia receiver of size 24" dia. X16 ft. long complete with liquid inlet/ outlet valves, charging connections, safety valves and gauge valves and gauge connections. Stands single row atmospheric condensers made from Tata “H” pipe having each 12 pipes high 20 ft. long complete with liquid inlet/outlet valves, safety valves, purge valves, charging line and gauge glass with valves. Gas/ liquid header for above. Water header and sprinkler for above. Kirloskar/ Jyoti/ Becon/ equivalent make monoblock pump sets of 120 GPM capacity at 50 ft. head with 10 HP motor for circulation of water between condensers. (one is to act as standby) Star delta starters for the above pumps (to be provided on the panel board) Set of G.I. pipes & pipe fitting as per design and

1 Nos.

42

2 Nos.

2 Nos.

2 Nos.

1 Nos.

10 Nos.

1 Nos. 1 Nos. 2 Nos.

3 Nos. Lot

Price schedule

12.

13.

14.

15.

16. 17.

based on the assumption that the condensers shall be placed at a distance of not more than 5 mtrs. from the plant room G.I. pipes, valves and fitting for water defrosting arrangements. Refrigerant pipes & pipe fitting to interconnect various equipment’s based on close hookup. The refrigerant piping shall be ERW heavy “C” class and valves of Super/ Crown/ Amcon. (Interconnection of all Highside/ Lowside) Suction line insulation with thermocol (Expanded Polystyrene Slab) Bitumen 85 x 25 Grade, finished with chicken wire mesh. Cubical Panel Board made from heavy duty gauge sheet steel aluminium bus bar complete with switch fuse unit, voltmeter selector switch ammeter with selector switch, indicating lights, starter with switch fuse units, toggle switch and star delta starters L & T/Simens make for the above compressor, motors, pump motors, and Air cooling units motors. The panel shall be spray painted. Electrical wiring materials comprising of power cable, PVC insulted armoured aluminium conductor, copper control cable, G.I. Class “A” pipes for conduits, earthing materials. First charge of Ammonia gas compressor oil. (in returnable cylinder) Structural base for mounting compressor and motors. Total on Common Highside Equipments

Lot

1 Nos.

1 Nos.

Lot

Lot 2 Nos.

(B) Lowside Equipment for the Cold Storage: Sl. No. 1.

2. 3.

Description of Plant & Machineries

Qty

Ammonia air cooling units ceiling & wall 24 Nos. mounted frigid coil of coil company, consisting of ammonia finned type coil of 5/8 " O.D. steel aluminium fins, propeller fan, fan motor, (each unit with two fans and 0.75 HP motor, G.I. steel casing and electro static power coated paint with accumulator and hand expansion valves, 3 units for each chambers) D.O.T. starter to be fitted in the panel board. 24 Nos. Digital type Thermometers. (one for each cell) 8 Nos. Total on Lowside Equipments

43

Price schedule

Sl. No. 1.

2. 3. 4. 5. 6. 7.

Description of Insulation

Qty

Expanded polystyrene insulation of normal density based on 80 mm (2 layers of 40 mm) on all exposed walls, floor and ceiling. Bitumen & shalikote. Aluminium foil as vapour barrier Double layer of Tarfelt for cold storage flooring with concreting. Wooden gutties, battons, G.I. wire washers, clamps for fixing insulation. Chicken wire mesh for all walls/ ceiling of cold storage over insulation, followed by plastering Heavy duty insulated cold storage cold storage doors of size 6.5’ x 3’ complete with teakwood frame, door panels duly insulated with 80 mm thick insulation, aluminium/ G.I. cladded from both sides with latches, hindges and chromium plated push knobs. Total Insulation

Lot

Price schedule

Lot Lot Lot Lot Lot

Installation Charges of Plant & Machineries Sl. No. 1. 2. 3. 4. 5.

6.

7. 8.

Description of Plant & Machineries to be installed Lifting, shifting, positioning of the equipments on the foundations. Carrying out necessary piping for condenser plumbing system and defrosting. Carrying out necessary refrigeration piping for discharge line/ suction line/ liquid line. Carrying out electrical wiring of the plant. Labour charges for fixing of EPS insulations finished with chicken wire mesh/ cold storage doors. Complete erection, testing, charging and commissioning of the plant in satisfactory operation condition. Cost on staff for operation of the plant for 3 days to observe the performance of operation. Cost of 340 KVA Diesel Generator set along with charges on installation and testing etc. Total on Installation Charges

44

Qty -

-

1 No.

Price schedule

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

AGRICULTURE

PROJECT COST – Rs. 4.00 CRORE 2007-08 To 2011-12

45

CONCEPT PAPER 1. DETAILS OF SCHEMES INCLUDING SWOT ANALYSIS A. GENERAL AGRICULTURE 1. Demonstration of Crop ( Mustard ) : Rs. 22.50 lakh Strength : I. Suitable agro-climatic condition. II. Availability of suitable land area. III. Sufficient extension machinery. Weakness : I. Lack of HYV seeds. II. Imbalanced nutrient application. III. Lack of irrigation. Opportunity : I. Increase of productivity & production. II. Advantage of other schemes like NFSM, AACP, Banks for KCC, NERAMAC for HYV seeds. Threat : I. Remunerative price of product is not certain. 2. Establishment of Agri clinic cum service centre : Rs. 75.0 lakh Strength : I. Availability land & technical staff at Block HQs. Weakness : I. Farmers participation is not upto the mark. Opportunity : I. Technical guidance & availability of inputs to the farmers at doorsteps. Threat : -- Nil.

B. HORTICULTURE 1. Area expansion under vegetables & fruit crops : Rs. 195.00 lakh. Strength : I. Suitable agro-climatic condition. II. Availability of suitable land area. III. Sufficient extension machinery. Weakness : I. Lack of cold storage & market net work. II. Lack of HYV seed/ planting materials

46

Opportunity : I. Increase of area & quality production. II. Attraction of Minority farmers to grow Hort. crops for more profit. III. Provision for processing units. Threat : I. Wastage / distress sale of produces for lack of storage facility, processing & marketing. II. Obtaining remunerative price of product.

2. Mushroom Production Units ( 50 units ) : Rs. 50.00 lakh. Strength : I. Vast potential for growing mushroom with availability of raw materials & manpower with ready market. II. Vast export potential. Weakness : I. Improper infrastructure II. Habit of mushroom eating. Opportunity : I. Self employment to a large extend through SHG. Threat :

---- Nil

3. Capacity Building ( 175 trainings of 25 trainees each ): Rs. 17.50 lakh Strength: I. Sufficient nos. of technical experts of the Department and the KVK. II. Existence of sufficient nos. of training Halls like STC, Gardeners training Hall, Community Halls, SIRD etc. Weakness: I. Lack of farmers awareness about modern Technology. II. Inadequate information of HYVs recently developed. III. Insufficient knowledge of cold storage, Internet facilities for market occupation etc. Opportunity : I. Adequate technical knowledge will contribute to increased quality production. Threat :

----- Nil.

47

C. AGRICULTURE MARKETING 1. Development of Rural Markets ( Construction of Market Sheds ): Rs. 40.00 lakh. Strength : I. The Bongaigaon district is producing 75054 M.T. of food grains, 36241 M.T. of fruits and 58929 MT of Vegetables annually. II. About 45 nos. of Rural Markets are scattered within the district. Weakness : I. Lack of proper infrastructures in the rural markets. II. High volume of middleman involved. Opportunity : I. Encouraging farmers for more production with better market facility. II. Discourage middleman. III. Generation of employment.

2. SCHEMES PROPOSED UNDER AGRICULTURE DEPARTMENT Year 2007-08 To 2011-12. A. GENERAL AGRICULTURE Project Cost: 1. Demonstration of crop diversification Rs. 22.50 lakhs. 2. Establishment of Agri. Clinic cum Service Centre Rs. 75.00 lakhs. Total : Rs. 97.50 lakhs. B. HORTICULTURE 1. Area expansion of Veg. & fruit crops Rs. 195.00 lakhs 2. Mushroom Production unit Rs. 50.00 lakhs 3. Capacity Building ( Farmers training) Rs. 17.50 lakhs Total : Rs. 262.50 lakhs. C. AGRICULTURE MARKETING 1. Infrastructure Development ( Construction of Marketheds) Rs. 40.00 lakhs Total : Rs. 40.00 lakhs Grand Total ( A + B + C ) = Rs. 400.00 lakhs.

Table- 15. YEAR WISE BREAK UP OF FUND REQUIREMENT Year wise requirement of fund Sl No.

Items

A. 1.

Agriculture Demonstration of crop diversification Establishment of Agri. Clinic cum Service Centre Total =

2.

Unit cost (Rs.)

2008-09

20092010

2010-11

Total (Rs. in lakh)

1,500/-

7.50

7.50

7.50

22.50

15,00,000/-

15.00

30.00

30.00

75.00

22.50

37.50

37.50

97.50

48

B. 1.

2. 3.

C. 1.

Horticulture Area expansion of Veg. & fruit crops a. Potato b. Banana Introduction of Mushroom Production unit Capacity building farmers training Total Agriculture Marketing Construction of Market shed Total

6,00,000/1,50,000/1,00,00/-

36.00 15.00 15.00

48.00 30.00 20.00

36.00 30.00 15.00

120.00 75.00 50.00

10,000/-

5.00

7.50

5.00

17.50

71.00

105.50

86.00

262.50

10.00 10.00

15.00 15.00

15.00 15.00

40.00 40.00

5,00,000/-

A. GENERAL AGRICULTURE 1 .A. Impact of existing schemes : a) Through different ongoing schemes, area under oil seed, vegetables & fruit has been increased but the production target as well as demand could not be achieved yet.

b) The district is producing 4558 MT, 58929 MT & 36241 MT of oilseed

vegetables

& fruits per year against 7592 MT, 22776 MT & 11388 MT of demand for oilseed, vegetables and fruit respectively. The district is deficient in oil seed production.

1.B. Constraints and gap: a) There is a need to increase yield/ productivity. Effort to be done to meet the demand and surplus production if possible. b) The present rate of adaptability of farmers to modern technology to be increased. c) The feasible land area lying vacant or improperly utilized may be effectively used for growing mustard, vegetables & fruit crops. d) The growers have to be satisfied with remunerative price of produce through proper storage and marketing facility.

2. Proposed intervention under Multisectoral Development Plan for Minorities: a) Demonstration of crop diversification ( Mustard ) : - Under this programme, it is proposed to increase the area under Seed Certification programme Mustard through registered growers of different seed villages. The total nos. of demonstration will be 1500 Nos. in 3 yrs( 500 nos/yr) with a total outlay of 22.50 lakh where 20% cost will be borne by the beneficiaries. The total amount of Govt. subsidy i.e. Rs.22.50 lakh, will be used to supply the foundation seed of Mustard, nutrients & Pl. protection measures. The cost of labour, land preparation, irrigation etc. will be borne by farmers. The fund will be made available from the total amount of Rs. 97.50 lakh allotted against Gen. Agriculture. Target will be adjusted accordingly.

49

b) Establishment of Agriculture Clinic cum Service Centre: It is proposed to establish 5 units of Agri Clinic ( One in each Block) for transfer of Technology, propositioning and serving inputs like seeds, fertilizers, pesticides and to serve as agro service centre. Those will be run by NGO/SHG under the direct supervision of BAOs. An outlay of Rs. 75.00 lakh is proposed for 5 units @ Rs.15.00 lakh each. The working capital to run the clinics will be borne by the NGO/SHG on managemental ownership agreement on profit sharing basis with the department. The Fund allotted as Govt. share i.e. Rs. 75.00 lakhs will be adjusted from the total allocation of Rs. 97.50 lakh for General Agriculture. Target will be adjusted accordingly.

Table- 15.1(a) Break up of beneficiary contribution: i. Physical in Nos. ii) Financial Rs. in lakh Sl

Items

Unit cost

No 1.

Unit

Year wise requirement of

(Rs.)

fund 2008-09

2009-10

2010-11

Physical

500

500

500

1500

2,500/-

Financial

7.50

7.50

7.50

22.50

20,00,000/-

Physical

1

2

2

5

Financial

15.00

30.00

30.00

75.00

Financial

22.50

37.50

37.50

97.50

Demonstration of crop diversification -

Total

Mustard Seed Certification

programme 2.

Establishment of Agriculture Clinic cum Service Centre Total

Table- 15.2.(b) Time and cost of schedule of General Agriculture: Rs. in lakhs. Name of scheme

1.Demonstration of crop diversification 2. Agriclinic Total

Total cost for 3 yrs

Quarterly cost scheduling 2008-09 st

nd

2009-10

2010-11

1 Qtr

2 Qtr

3 Qtr

4th Qtr

1 Qtr

2 Qtr

3 Qtr

4th Qtr

1 Qtr

2nd Qtr

3rd Qtr

4th Qtr

22.50

-

-

-

7.5

-

-

-

7.5

-

-

-

7.5

75.00

-

-

-

15

10

10

10

-

10

10

10

97.5

-

-

-

22

10

10

10

7.5

10

10

10

rd

st

50

nd

rd

st

7.5

B. HORTICULTURE 1. INTRODUCTION The district Bongaigaon is situated in the western part of Assam, in Sub-tropical zone between the latitudes 260 28/ N and 26054/ N and longitudes 89042/ E and 90006/ E. The Topography of it is generally plain, but a few hills are also present. The climate of the district is moderate. Though monsoon starts from April, it experiences heavy rainfall from the month of June to August. The average rainfall is 2640 mm and the minimum & maximum temperature of the district is 18 0C & 38 0C respectively. The soil type ranging from sandy loam to clayee loam is available in the district. The total area under Horticultural crop was 13568 Ha during 2007-08, contributing approximately 24% of district net area.

Area under Horticultural Crops in 2007-08. Fruits 4,587

Vegetables 6,807

Spices 2,174

Area in Ha. Total 13,569

2. ONGOING SCHEMES : Technology Mission for Integrated Development of Horticulture, MM-II. 3. CONSTRAINTS & GAPS: The scheme is being implemented by utilizing the Central Fund. But it is not enough to increase the area under Horticulture crops to the desired level. Moreover, the minorities living mostly in char & charlike area, which is not feasible for all types of fruit crops, except banana. Therefore, the Multi Sectoral Plan for Minorities has been prepared incorporating the compact area demonstration programmes of Potato & Banana with latest high yielding varieties, training of farmers in recent development of cultivation practices, establishment of Mushroom production units. To achieve this farmers have to be motivated and helped with the supply of high yielding planting materials.

4. PROPOSED INTERVENTION UNDER MULTI SECTORAL DEVELOPMENT PLAN FOR MINORITIES: 4.1. COMPACT AREA DEMONSTRATION OF VEGETABLES & FRUITS:- Based on the Agro climatic situation, it is proposed to expand area of Potato & Banana. Under this programme, Seed/ Seedlings of high yielding latest varieties will be procured and supplied to the farmers. The compact area demonstration programme of the two crops with 20 Nos. of units of 10 Ha for potato and 50 Nos. of units of 1 Ha for Banana have been proposed, covering a total area of 170 Ha. in three years where 37% of the cost will be borne by the beneficiary. The scheme will be implemented with suitable beneficiary share of Rs. 72.34 lakhs out of the total cost of Rs. 267.34 lakhs. The target will be adjusted accordingly. The detail analysis of the project is shown below:

51

Table-15.3.1. Scheme wise & year wise proposal of Vegetable and Fruit crops. Compact area demonstration: i. Physical in Nos. ii. Financial Rs. in lakh Sl

Items

Unit cost

No

1.

Unit

(Rs.)

Potato demonstration with

8,36,700/-

TPS – unit size 10 ha 2.

Year wise requirement of fund

Banana demonstration with

2,00,000/-

tissue culture seedling,

Total

2008-

2009-

2010-11

09

10

Physical

6

8

6

20

Financial

36.0

48.0

36.0

120.0

Physical

10

20

20

50

Financial

15.00

30.00

30.00

75.0

Financial

51.00

78.00

66.00

195.00

-unit size 1 ha Total =

-----

Table-15.3.2. Time & Cost schedule of Horticultural Crops: Rs. in lakhs. Name

Total

of

cost

Quarterly cost scheduling 2008-09 nd

rd

2009-10 st

nd

rd

2010-11

for

1

2

3

4th

1

2

3

4th

1

2

3rd

3 yrs

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Potato

120.0

-

-

6.0

30.0

-

-

8.0

40.0

-

-

6.0

30.0

Banana

75.0

-

-

10.0

5.0

-

15.0

15.0

-

-

15.0

15.0

-

Total

217.5

-

-

16.0

35.0

-

15.0

23.0

40.0

-

15.0

21.0

30.0

scheme

st

st

nd

4th Qtr

4.2. ESTABLISHMENT OF MUSHROOM PRODUCTION UNIT : It is proposed to establish 50 nos. of Mushroom Production Units through SHGs at nearly 80% subsidy of Rs. 1.25 lakh per unit cost. The total expenditure of the scheme will be Rs. 62.5 lakhs out of which Rs. 50.0 lakh is Govt. subsidy. Production target is estimated as 3650 kg/unit/yr & total production will be 182.5 MT of fresh Mushroom per year. The scheme will be implemented with suitable beneficiary.

Impact of intervention : a) Production will be increased b) Nutritional requirement could be achieved c) Farmers income will be resulted d) Will generate employment directly or indirectly.

52

4.3. CAPACITY BUILDING : The farmers of the minority community is not adequately aware about the modern technology for more quality production. Therefore the farmers are to be capacitated through field level crop specific training. For this purpose, Rs. 17.50 lakh has been allotted in the plan for three years.

Table-15.4.1. Physical & Financial break up of Horticultural Schemes. Items

Sl

Unit cost

i. Physical in Nos. ii. Financial Rs. in lakh Year wise requirement of fund Total

Unit

No.

2008-09

1

1,25,000/-

Mushroom Production Unit

2.

Capacity building

10,000/-

-Farmers training Total

2009-10

2010-11

Physical

15

20

15

50

Financial

15.0

20.0

15.0

50.0

Physical

50

75

50

175

Financial

5.0

7.5

5.0

17.5

Financial

20.0

27.5

20.0

67.5

Table-15.4.2. Time & Cost schedule of Horticultural schemes: Rs. in lakhs. Name of

Total

scheme

cost for

Quarterly cost scheduling 2008-09

2009-10

2010-11

1st

2nd

3rd

4th

1st

2nd

3rd

4th

1st

2nd

3rd

4th

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

50.0

-

-

5.0

10.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

-

17.5

-

-

2.0

3.0

2.0

2.0

2.0

1.5

1.0

1.0

2.0

1.0

67.5

-

-

7.0

13.0

7.0

7.0

7.0

6.5

6.0

6.0

7.0

1.0

3 yrs Mushroom production unit Capacity building - Farmers Training

Total

53

C. AGRICULTURE MARKETING 1. Introduction The district is predominantly an agricultural district, where more than 80% population are farmers. The percentage is a bit higher in minority community. Due to economic hardship as well as very low land holding, they cannot afford for costlier technology of modern agriculture. Even though the district is gradually up taking the recently developed practices in agriculture. At present the district is producing about 75054 MT of food grains, 36241 MT of fruits, 58929 MT of kharif and Rabi vegetables and 16765 MT of different spices. Most of the horticulture produce get damaged very soon due to lack of cold storage and adequate market sheds in the rural hats, farmers are compelled to go for distress sale during peak harvest season. Moreover, they are being exploited by the middleman as well as consumers. Agriculture marketing can play a vital role to overcome those troubles by organizing sufficient numbers of Growers Committees, who can look after all the operations involved in the movement of the produce from the field to the consumer. It includes the handling of product at farms, initial processing , grading and packing in order to maintain quality and to check wastage. At present the district has nearly 45 nos. of rural markets. Agriculture growers societies have been constituted in some pockets also. But due to lack of some basic needs they are not performing properly. The department is also not capable of assisting them with regular budgetary provision.

Ongoing Schemes: a. Scheme for development of marketing of fruits and vegetables (State Plan). b. Scheme for development of rural market ( State Plan). c. Scheme for development of market intelligence (State Plan).

Impact of existing schemes: a. Few farmers are gaining more profit by marketing through organized marketing societies, Growers Societies. b.

Due to development of rural markets, the growers are gradually becoming more market oriented. There is need to construct “Market sheds” in some Rural Markets of minority area.

Marketing Problems: The basic problems which need attention are a. Market density. b. Enactment of market legislation. c. Market infrastructure. d. Organized Marketing. e. Processing facility. f.

Storage facility.

g. Market information. h. Post harvest. i.

Domestic market.

54

2. Proposed intervention under Multi Sectoral Development Plan 2.1. Development of rural market- Construction of Market shed : It is proposed to construct 8 nos. of market sheds in 8 rural markets where no market shed facility is available. The scheme will be implemented in three years. Proposed Fund allocation under Govt. share is Rs. 5.0 lakh per shed and beneficiary share will be Rs. 1.0 lakh at (20%) total fund requirement Rs. 48.0 lakh where Govt. share will be Rs. 40 lakh for 8 Market sheds. Target will be adjusted accordingly.

Table-15.5.1. Year wise proposal of construction of Rural Market shed. Sl

Items

Unit cost

i. Physical in Nos. ii. Financial Rs. in lakh Year wise requirement of fund Unit Total

No. 1.

2008-09

2009-10

2010-11

Physical

2

3

3

8

shed

Financial

10.0

15.0

15.0

40.0

Total

Financial

10.0

15.0

15.0

40.0

Rural Market

6.0

Table-15.5.2. Time & Cost schedule of construction of Rural Market shed. Rs. in lakhs. Name of

Total

scheme

cost

Construction

Quarterly cost scheduling 2008-09

2009-10

2010-11

for

1st

2nd

3rd

4th

1st

2nd

3rd

4th

1st

2nd

3rd

4th

3 yrs

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

Qtr

40.00

-

-

5.0

5.0

5.0

5.0

-

5.0

5.0

5.0

-

5.0

40.00

-

-

5.0

5.0

5.0

5.0

-

5.0

5.0

5.0

-

5.0

of Rural Market shed Total

55

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR DISTRICT RURAL DEVELOPMENT AGENCY

PROJECT COST – Rs. 7.00 CRORE 2007-08 To 2011-12

56

CONCEPT PAPER Name of Scheme Construction of dwelling houses with Low–cost Sanitary Latrine and Hand-Tube well for the beneficiary of Minority Communities Boangaigaon District. (2000 unit @ Rs. 35,000/per unit) 1.

Socio –economic feasibility with justification : As per the records of census of India 2001, the housing types in the district of

Bongaigaon shows that 18% live in permanent house, 39% live in semi permanent and 43% in temporary houses. The base line survey conducted by the “Omeo Kumar Das Institute for Social Changes & Development, Guwahati, Assam” indicates that

housing is a major developmental

deficiency in the district due to poor coverage of IAY and hence a provision of 2000 nos. of dwelling houses is proposed for the beneficiary of the minority communities. 2.

Critical gap: In housing sector, National programme

like IAY gives coverage only 15% in

construction of dwelling houses for the minorities. On looking into holistic approaches of the minorities dwelling much more attention is needed for construction of more houses for giving coverage to more house hold along with amenities like safe drinking water and sanitation etc 3.

Goal and strategy: Our goal and strategies are too obvious in improving Socio economic parameters by

providing a dwelling house with basic amenities like safe drinking water, sanitation etc. Though minority families who are residing in a temporary house, they are to be given priority, our goal may be 100% coverage of those minority families having not a single permanent house but our step would be at present 2000 houses to be provided under this Multi-sectoral Development Programme (MSDP) for minorities. 4.

Out come and benefit: Out effort may not lead us to spectaculars strict in the area of minority development but

it undoubtedly uplift the Socio-economic condition of the minority communities including a better sanitated life. 5.

Milestone: Providing 2000 houses to the minorities in this district after successful implementation of

the programme would become first milestone of monitories development.

57

6.

Approximate cost of project: Rs. 7.00 crore (2000 dwelling @ Rs. 35,000/- per unit)

7.

Year wise physical and Financial Target :

1

Physical Target (Nos.) 2

3

Financial Target (Rs in crore) 4

2008-09

660

33%

2.31

33%

2009-10

680

34%

2.38

34%

2010-11

660

33%

2.31

33%

Year

8.

PC

PC 5

Private investment participation (if any) : Participation of private investment is absent so far.

9.

Project location : Entire district.

10.

Land availability: Private land of the beneficiary.

11.

Intended beneficiaries: The list of intended beneficiaries would be placed at the Gram Sabha for finalization of

the beneficiary list. 12.

Duration of the project: 3 years.

13.

Implementing Agency: G.P wise beneficiary Committee will implement the scheme under the supervision of

BDOs and DRDA, Bongaigaon.

14.

Existing & proposed Mechanism for implementation: Intended beneficiary will submit application to the respective BDOs and BDOs in their

turn will send GP wise list of intended beneficiary to the respective GP for finalization of the same in Gram Shabha.

15.

Management/operation maintenance of assets created: Beneficiary Committee will construct the house keeping close liaison with the GP

Secretary and President 100% inspection and verification of construction will be made by BDO and 10% verification will be cross checked by DRDA, Bongaigaon. At the exit protocol, the beneficiary committee will handed over the dwelling house to the beneficiary and the maintenance of the asset

created would lie with the beneficiary himself.

58

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR PUBLIC HEALTH ENGINEERING

PROJECT COST – Rs. 1.50 CRORE 2007-08 To 2011-12

59

CONCEPT PAPER Bongaigaon District of Assam has been identified as minority concentration district during a fresh exercise based on population figures and the following backwardness parameters of 2001 Census: (a)

(b)

religion – specific, socio – economic indicators at the district level: (i)

literacy rate;

(ii)

female literacy rate;

(iii)

work participation rate;

(iv)

female work participation rate; and

basic amenities indicators at the district level: (i)

percentage of households with pucca walls;

(ii)

percentage of households with safe drinking water;

(iii)

percentage of households with electricity; and

(iv)

percentage of households with water closet latrines.

The Public Health Engineering Department of Assam being the line Department for taking up the matters relating to the point Nos. (ii) & (iv) of (b) has the responsibilities of giving due attention for submission of the plan accordingly. Regarding the households with water closet latrines, it may be mentioned here that, a project, viz: Total Sanitation Campaign (TSC), is in force for the entire district, where all the BPL families of the district have been proposed to cover by providing one low cost latrine to each families with a subsidy of 80% from the Central and State Govt. funds, besides covering all APL families under the project. Also, it has been aimed that all the Schools and Anganwadi Centres shall be covered within 2009. so, the department has not proposed any woks for sanitation. Regarding the households with safe drinking water, it has been observed that although water sources are provided in different times to different localities as per Govt. norms under different programmes, but it does not seems to be adequate in practical field, which have been mentioned in the report by the expert agency. Also the existing sources are in non-functional stage due to improper maintenance by the users. So, the proposal for providing with Singur Hand Pumps to the entire district @ 1 No. Singur hand Pump per 250 population of the minority population, for the entire district has been prepared which shall uplift the water supply scenario of the district in general and minority population in particular, which have been identified as minority district.

60

Keeping in view the fact that all the households of the district are supplied with safe drinking water upgrading the disadvantageous minorities, it has been proposed to install 847Nos. of Singur Hand Pumps in all the Gaon Panchayats with minority population within the district. There are all total 65 Nos. of Gaon Panchayats in the newly created district of Bongaigaon in Assam, and depending upon the population pattern the proposal has been formulated so that all concerned should get the benefit of safe drinking water. And it has been seen that minority communities are spread over 47 Nos. of GP. So the proposal has been prepared accordingly. All the existing P.R.I.s have been consulted regarding the proposal and all of them have consented over the matter. They also assured to bear all the maintenance cost to be born for maintaining the created assets. The entire project has been target to be completed by 2010-11 and for that year wise physical and financial break-up have been made and enclosed with this project. It is also presumed that after installing these sources in the district the critical gap in respect to safe drinking water in the district shall be minimized specially with reference to the disadvantageous minorities. It shall be worth mentioning here that, the sources proposed in the district shall be technically feasible and viable for the entire district. The cost of 1 (one) number of Singur Hand Pump is Rs. 0.177 Lakh and therefore the total cost of the project, which consists of 847 Nos. of Singur Hand Pumps, shall be 150.00 Lakh. The estimate for this purpose has been prepared by this department following the latest schedule of rates which is for the year 2008-09.

1. SOCIO ECONOMIC FEASIBILITY WITH JUSTIFICATION: The inhabitants of Bongaigaon District are mainly cultivators and some of course, are businessmen and very limited are service holder. So, the main lively hood of the district is cultivation. Social status of the rural as well as the urban peoples are not up to the mark and they are very simple in nature. The minorities are spread over around the district in all the areas. The social status of the minorities in particular are not up to the mark and to uplift them up to the mark the multi sectoral development plan shall play a vital role in the coming days.

2. CRITICAL GAP: 1) Almost all the minorities population in the district are facing immense problem for their safe drinking water. Although in past some water supply arrangements have been made by the Govt., due to lack of maintenance facilities those sources are lying non-functional for years together. Moreover, there seems to be no organized water supply facilities in and

61

around the areas of the minority concentration. So, they very much feel the necessity of safe drinking water. Keeping in view the above need the proposal for installation of Singur Hand Pumps in the minority dominated areas of the district have been prepared, which shall be feasible in the district. The reason for selection of Singur Hand Pumps is that, the maintenance cost of a Singur Hand Pump is very less. The Singur Hand Pumps have been proposed to be provided @ 1 No. Pump per 150 minority population and it is hoped that this shall minimize their long standing grievances pertaining to safe drinking water. This shall also reduce the critical gap which has been developed among the minority community in respect of the safe drinking water.

3. GOAL & STRATEGIES: 1) The main goal of the project is to provide safe drinking water to all the masses of the minorities within the district. 2) The strategy for implementation of the project shall be formulated as per prevailing APWD Rule.

4. OUTCOME & BENEFIT : 1) The provision of such Singur Hand Pumps among the minority communities shall fulfill their need for safe drinking water and also these shall develop the health scenario of the masses which shall ultimately help in developing the nation as a whole.

5. MILESTONE: 1) The entire project has been proposed to be completed within three years time frame, viz: 2008-09, 2009-10 & 2010-11. The details of the year wise phasing has been enclosed with the project.

6. APPROXIMATE COST OF THE PROJECT & YEAR WISE TARGET: 1) The total cost of the project has been estimated as Rs. 150.00 Lakh. The year wise phasing are, 2008-09 = Rs. 47.082 Lakh for 266 Nos Singur Hand Pumps, 2009-10 = 59.472 Lakh for 336 Nos Singur Hand Pumps & 2010-11 = 43.365 Lakh for 245 Nos Singur Hand Pumps.

7. PRIVATE INVESTMENT PARTICIPATION: 1) As the minorities in the district are economically very backward, so the beneficiary’s contribution in the project has not been considered.

62

8. LAND AVAILABILITY: 1) For installation of the Singur hand Pumps in different localities within the district, land shall be made available by the beneficiaries.

9. INTENDED BENEFICIARIES: 1) Mostly all the minorities over 37 Nos. of G.Ps. of the district has been targeted as beneficiaries.

10. DURATION OF THE PROJECT: 1) The Project has been estimated to be completed within 2010-11, if everything goes right.

11. IMPLEMENTING AGENCY: 1) Public Health Engineering Department being the line department for the job, shall be implementing agency.

12. EXISTING & PROPOSED MECHANISM FOR IMPLEMENTATION: 1) The PHE department has sufficient mechanism for implementation of the project. 13. MANAGEMENT / OPERATION AND MAINTENANCE OF ASSETS CREATED: 1) Operation and maintenance of the assets so created shall be done by the beneficiaries.

ESTIMATE FOR INSTALLATION OF SINGUR HAND PUMP ( Prepared as per APHE Schedule of Rates for the year 2008-09)

ABSTRACT OF COST [ For 1 (one) no of Singur Hand Pump ]

a)

Labour charge ( Annexure-A)

Rs.

8841.00

b)

Cost of Materials ( Annexure-B)

Rs.

8300.00

Total= Rs. 17141.00 Add 3% Contingency

Rs.

514.23

Grand Total = Rs. 17,655.23 Say ( Rupees Seventeen thousand seven hundred) only

63

Rs. 17,700.00

ANNEXURE-A Estimate for Installation of Singur Hand Pump including construction of Platforms, Drains & Soak pit ( Prepared as per APHE Schedule of Rates for the year 2008-09)

(Average Depth – 40 M) Sl No 1 1.1.1

2.2.1

Descriptions of Items 2 Labour charge for making bore hole of 40 mm dia G.I. pipe up to required depth below ground level and collecting sample of soil at every 3.00 M depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools etc. and withdrawing the pipe for lowering well assembly etc. all complete including as directed. Boring depth for pipe assembly = 40 M 10% allowance for unsuccessful boring 4 M Labour charge for sinking, lowering , fitting, fixing in position 40 mm dia U.P.V.C.pipe with 40mm dia strainer placed in potable water bearing layer with 40mm dia cone / plug at the bottom of the tube well , washing the bore well etc. and supplying necessary jointing materials cutting and threading the pipe where necessary including carriage of materials and cleaing and priming the tube well complete as directed.

Unit 3

Mtr.

Mtr. 3.1.3

3.4.2

4.5.1

Labour charge for making bore hole of 100 mm dia G.I. pipe up and collecting sample of soil at every 3.00 M depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools etc. and withdrawing the pipe for lowering well assembly etc. all complete as directed. Labour charge for providing bentonite clay packing (excluding the cost of Bentonite clay ) around 40 mm dia tube well up to a depth of 6 .00M from top with 100 mm dia boring including carriage of materials all complete as directed and specified. Labour charge for fitting fixing force and lift pump and hand pump with necessary clamp, nuts bolts etc. firmly on the top of the pedestal including cutting threading the pipe as necessary with the carriage of materials including commissioning the pump as directed.

64

Mtr.

Qnty. 4

44.00

38.00

5.00

Rates (Rs.) 5

53.90

5.20

125.90

Amount (Rs.) 6

2371.60

197.60

629.50

Mtr.

5.00

137.60

688.00

Each

1

48.40

48.40

1 5.11.1

6.11.5

7.11.6 8 .N.S

2 Construction of platforms of conventional tube well with cement concrete work in proportion 1:2:4 of 1.5 m dia ( Outside to outside) in two layers with a base layer of concrete of proportion 1:4:8 as per approved drawing of CPHE No. C.E.(PHE) 03/05 including necessary earth work and refilling after completion of the work all complete as directed. Construction of drain with cement work in proportion 1:2:4 in slope of 1:50 with a base layer of concrete of proportion 1:4:8 as per respective approved drawing including necessary earth work and refilling after completion of the work all complete as directed Construction of soak pit as per approved drawing of CPHE No.C.E.(PHE) 05/06. Carriage of materials from departmental store to work site.

3

4

5

6

Each

1

1929.80

1929.80

Mtr.

3.00

282.00

846.00

Each

1

1880.30

1880.30

L.S.

-

250.00

250.00

Rs.8841.20 Say , Rs.8841.00

ANNEXURE –B ( Cost of Materials) Sl No 1

Item of materials

Unit

Qnty.

Rates(Rs.)

Amount(Rs.)

Singur Hand pump

Set

1

2730.00

2730.00

2

40 mm dia U.P.V.C.pipe

Mtr.

36.00

140.40

5054.40

3

40 mm dia 2.00 m ribbed screen

Each

1

185.90

185.90

4

40 mm dia C.I.cone

Each

1

10.00

10.00

5

Bentonite clay

MT

0.025

4972.00

124.30

6

Carriage & handing charges @ 2.5 %

-

-

-

195.48

Total = Rs. 8299.68 Say, (Rupees Eight thousand three hundred) only

65

Rs. 8300.00

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR SECONDARY EDUCATION

PROJECT COST – Rs. 5.49 CRORE 2007-08 To 2011-12

66

CONCEPT PAPER 1. INTRODUCTION The MSD Plan for 2007-08 to 2011-12 is prepared on the basis of guideline of Ministry of Minority Affairs, Govt. of India keeping in view to cover more and more minority students of secondary stage of education of the District subject to availability of fund.

Prov.

Recog.

1.

H.S.S.

11 Nos.

Nil

2.

High School

43 Nos.

47

3.

High Madrassa

02 Nos.

04

4.

Sr. Mad.

01 No

Nil

57 Nos.

51 Nos.

Total

Table- 16. Religionwise enrolment . Hindu 1

Muslim

Christians

Sikhs

Others

Total

3

4

5

6

7

2

31,267

22463

8675

114

15

31267

The % of Minority student in the district at Secondary level = 28.16% Point wise a brief analysis is shown below about the MSD Plan for the year 2007-08 to 2011-12.

2.

Socio economic feasibility with justification:

Bongaigaon district has

already been identified as one of the Minorities concentrated district and is relatively backward in terms of both socio-economic and basic amenities falling far behind the national average and it is classified as ‘A’ category district.

3.

Critical gap:

There are many development deficiencies of better infrastructure for

secondary education such as proper sanitation, classroom, library, furniture, library books, electricity supply etc. Hence, it is required to improve these deficiencies for the development of the minorities concentrated areas.

67

4.

Goal and strategies:

The aim and objective of this plan is to provide better

infrastructure and quality education in respect of secondary education for Minority concentrated areas of the District to reduce imbalance and speed up development in the areas in respect of Secondary education as well as degree level. To improve the above-mentioned deficiencies, provision for construction of School building, toilets, libraries, and purchase of furniture and books for distribution to the schools are made in the MSD Plan 2007-08 to 2011-12 to improve the quality of Secondary education in minorities dominated area’s school of this district. For this purpose following schemes have been taken in MSD Plan: (1)

Construction of 3 Nos. of additional classroom with library cum reading room with toilet facilities for both boys & girls for provincialised high school/high Madrassa.

(2)

Construction of 6 Nos. of additional classroom with library cum reading room with toilet facilities for both boys & girls for provincialised H.S.S. and Sr. Madrassa.

(3)

Purchase of furniture.

(4)

Purchase of library books for distribution.

(5)

Construction of additional classroom to recognised high school/high madrassa.

(6)

Construction of additional classroom to non- provincialised Degree College.

The plan will provide above facilities to 41 nos. of Secondary Schools/Madrassa and 10 nos. of degree college of Bongaigaon District.

5.

Outcome and benefit:

After strengthening the infrastructure for Secondary

education and other facilities in school of minority concentrated areas it is expected the improvement of it’s quality education which is the basic need of human and reduce the imbalance of getting quality education in the minorities concentrated areas of Bongaigaon District.

6.

Milestone:

Formulating & Implementing MSDP of secondary education for

Bongaigaon District which will cover 41 nos. of Secondary school/Madrassa and 10 nos. of colleges of minority concentrated areas of this district for better infrastructure for all round development of Secondary education among the minority communities of the district may be taken as the milestone for the development of minorities in respect of secondary education as well as college level.

68

7.

Approximate cost of project: Name of Scheme/Project

Approximate cost (Rs. In lakhs)

1

2

(a) Construction of 3 nos. of additional classroom with library cum reading room and toilet facilities for both boys’ and girls to 11

Rs. 116.82

nos. of existing high school/Madrassa @ Rs. 10.62 lakh each (b) Construction of 6 nos. additional classroom with library –cum reading room and toilet facilities for both boys & girls to 3 nos.

Rs.

68.24

of HSS and 1 No. Sr. Madrassa @ Rs. 17.06 lakh each (c) Construction of addl. class room for 26 nos. of recognised High

Rs. 130.00

school/mad. @ Rs. 5,00,000/- to each (d) Purchase of library books for schools

Rs. 33.44

(e) Purchase of furniture for schools

Rs. 100.00

(f) Construction of addl. class rooms

to 10 nos. of non

Rs. 100.00

provincialised degree college @ Rs. 10.00 lakh to each. Total Rs. 548.50

7.1 Sl No

Year wise physical & financial target : Name of Scheme /Project

Year wise physical

Financial Target

Total

target 2009 -10

2010 -11

2011 -12

2009 10

201011

201112

1

Construction of 6 No. of addl. 2 Classroom with library cun reading room for 3 nos. of prov. HSS & 1 no. of prov. Sr Mad.@ Rs. 16,20,000/- and 2 (two) sets of Toilets for boys & girls Separately Rs. 86,000/-.

1

1

34.12

17.06

17.06

68.24

2

Construction of 3 nos. of addl. 5 classroom with library cum reading room for 11nos. of prov. high school/Mad. @ Rs. 9,76,000/- and 2 (two) sets of toilets for boys and girls Separately Rs. 86,000/-.

3

3

53.10

31.86

31.86

116.82

69

3

4. 5 6

8.

Construction of addl class room for 26 nos. of Recognised High school/mad @ Rs. 5,00,000/- to each Construction of addl Class room @ 10,00,000/- x10 Purchase of furniture for school/Madrassa. Purchase of Book for school library.

14

6

6

70.00

30.00

30.00

130.00

6

2

2

60.00

20.00

20.00

100.00

27

7

7

61.40

19.30

19.30

100.00

27

7

7

20.40

6.52

6.52

33.44

Rs.

299.02

124.74

124.74

548.50

Private investment participation (if any): For implementing the schemes, respective school authority may contribute fund for further extension or additional construction with approval of concerning authority.

9.

Project location: In view of cover all the C.D. blocks on the basis of population and nos. of schools having minority students in large quantity, availability of land, enrolment status etc. location of the project is selected. Block –wise proposed nos. of project /schemes is furnished below.

10.

Land availability: Land is available for construction of additional classroom in selected and proposed location.

11.

Intended beneficiaries: For selecting proposed beneficiaries, the guideline of Govt. Of India, Ministry of Minority Affairs alongwith the baseline survey report is strictly followed. Moreover, preference is given to the school having maximum no. of minority students in minority concentrated areas with special attention to girls students, Madrassa in the district. The Schemes/project of MSDP for minorities is expected to benefit about 5394 nos. of student of secondary stage of education of Bongaigaon District out of 8789 nos. of minority student which is 61.37% of total minority students of secondary education of this District.

12.

Duration of project: It is intended to complete the project during the year 2007-08 to 2011-12 subject to availability of fund allotment.

13.

Implementing agency: The construction committee of respective schools with Head of the institution as constituted by the I.S., BDC Bongaigaon and duly approved by the Deputy commissioner, Bongaigaon will be responsible for construction work and supervision and monitoring will be done by the Inspector of Schools, BDC Bongaigaon.

14.

Existing & proposed mechanism for implementation: Existing mechanism for implementation of various schemes/Project is the head of institution on supervision of Inspector of Schools, BDC, Bongaigaon

15.

Management/operation and maintenance of assets created:

The

managing committee of respective school is the sole authority to maintain and manage the assets created.

70

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR ELEMENTARY EDUCATION

PROJECT COST – Rs. 2.00 CRORE 2007-08 To 2011-12

71

CONCEPT PAPER Multi Sectoral Development Plan for Minorities 2007-08 to 2011-2012 is prepared on the basis of guidelines of Ministry of Minority Affairs, Govt. of India keeping in view to cover more & more minority students of Elementary stage of Education of the District subject to availability of fund. Targeted no. of schools are shown below: Provincialised Middle school

Recognised Middle school

Govt.aided venture L.P.

Remarks

Nil

100 Nos.

100 Nos.

Construction of school building(one class room)

Total

100 Nos.

100 Nos.

Table- 17. Religion wise enrolment: Category

Hindu

Muslim

Christian

Shikhs

Other

Total enrolment

Recognised U.P.S.

5623

8654

---

---

---

14277

Venture L.P.S.

3127

4338

---

---

---

7465

The Percentage Minority students in the Elementary stage is 60 % Approx.

BRIEF ANALYSIS 1. Socio economic feasibility with justification : Bongaigaon District has already been identified as one of the Minorities concentrated district and relatively backward in terms of both Socio-Economic and basis amenities falling far behind the national and it is classified as “A” category District . 2. Critical gap : There are many development deficiencies of better infrastructure for Elementary Education such as construction of school building (one class room) of L.P. & U.P. (Venture& Recognised Middle school) etc. Hence it is required to improve these deficiencies for development of the minorities concentrated areas.

3. Goal and strategies: The aim and objective of this plan is to provide better infrastructure and quality education in respect of Elementary Education for minority concentrated areas of the district to reduce imbalance and speed up development in the areas in respect of Elementary Education. To improve the above mention deficiencies provision for construction of additional class room, purchase of furniture to the schools are made in the MSD plan 2007-2012 to improve the quality of Elementary Education in the minorities dominated areas school of this district .

72

For this purpose following schemes have been taken in MSD Plan : 1. Construction of 100 nos. of school building (one class room) for recognized Middle School. 2. Construction of 100 nos. of school building (one class room of Govt. aided venture L.P. School The Plan will provide above facilities to 200 nos. Elementary Schools (L.P. & U.P)

4. Outcome and benefit : After strengthening the infrastructure for Elementary Education and other facilities in school of minority concentrated areas it is expected the improvement of its quality education which is the basic need of human and reduce the balance of getting quality education in the minorities concentrated areas of Bongaigaon District.

5. Milestone : Formulating and implementing MSDP of Elementary Education for Bongaigaon District which will cover 100 nos. of Elementary Schools (L.P. & U.P.) for construction of School Building (one class room) each school of minority concentrated areas of Bongaigaon District for better infrastructure. For all round development of Elementary Education among the minorities communities of the district may be taken as the mile stone for the development of minorities in respect of elementary Education as well as Primary level.

6. Approximate cost of project : Sl.No. 1

2

Name of Scheme / Project Approximate cost (in Lakh) Construction of 100 nos. school building (one 100 x 1.00 = 100.00 class room) @ Rs. 1.00 Lakh each of recognized U.P. Construction of 100 nos. school building (one 100 x 1.00 = 100.00 class room) @Rs. 1.00Lakh each of venture L.P.School Total 200.00 Lakh (Rupees Two Crore Only)

7. Year wise physical & financial target : Sl. No.

Name of Scheme / Project

Year wise physical Target(In Nos.) 200910

1 1

2

2 Construction of school building (one class room) of recognized U.P.@ Rs. 1.00 Lakh each Construction of school building (one class room) of venture L.P.@ Rs. 1.00 Lakh each

201011

3

Year wise Financial Target(In Lakh)

201112

200910

201011

201112

5

4

Total

60

30

10

6 60.00

7 30.00

8 10.00

9 100.00

60

30

10

60.00

30.00

10.00

100.00

Total Rs.- 200.00 Lakh (Rupees Two Crore Only)

73

8. Private investment participation (if any) : For implementation the scheme respective school authority may contribute fund for further extension or additional construction with approval of concerning authority. 9. Project location : In view of cover all the CD block on the basis of population and Nos. of schools having minority students in large quantity availability of land enrolment status etc. location of project is selected (Block wise proposed nos. of project/schemes in furnished below. Sl. No. 1 1. 2.

Name of Scheme/Project

Srijangram

Boitamary

Tapattary

Dangtol

Manikpur

2

3 36

4 14

5 20

6 10

7 20

36

14

20

10

20

Construction of school building (one class room) of recognized U.P. Construction of school building (one class room) of venture L.P.

10. Land availability : Land is available for construction of school building in selected and proposed location . 11. Intended beneficiaries : For selecting proposed beneficiaries, the guide line of Govt. of India, Ministry of Minority Affairs along with the baseline survey report is strictly followed. More over, preference is given to the school having maximum no. of minority students in minority concentrated areas with special attention to girls students in the district. The scheme/project of MSDP for minorities is expected to benefit about 6236 nos. of students of elementary stage of education of Bongaigaon District out of 12,292 nos. of minority students which is 48.2% of total minority students of Elementary Education of this district. 12. Duration of project : It is intended to complete the project during the period of the year 2007-2008 to 2011-2012 subject to availability of fund allotment.

13. Implementing agency : The construction committee of respective school with head of the institution as constituted by the guardians of the learners and duly approved by the BMC of the respective block and will be responsible for construction works. Supervision and monitoring by the D.E.E.O., Bongaigaon. 14. Existing and proposed mechanism for implementation: Existing mechanism for implementation of various scheme/project is the head of institution on supervision of District Elementary Education Officer, Bongaigaon.

15. Management/operation and maintenance of assets created: The managing committee of respective school is the sole authority for maintenance and to manage the assets created.

74

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR MODERN ICT LABORATORY AT COLLEGES

PROJECT COST – Rs. 1.5471 CRORE

2007-08 To 2011-12

75

CONCEPT PAPER 1. SOCIO-ECONOMIC FEASIBILITY WITH JUSTIFICATION: Though all of the Colleges having good infrastructure in all fields but still it is lagging behind in IT sector. A large no. of students get admitted every year but these institutions are unable to provide sufficient facilities for basic ICT education to the students of the district. As a result, a large number of students are deprived from basic IT education. In this age of Information Technology and seamless web-world, knowledge , practice and applications of computer based processes has become a necessity and not a mere need. Being a backward district, there is a need of good IT training center where students can get basic training in IT education which will definitely improve the educational standard.

2. CRITICAL GAP: In comparison to students from other states, the student of this district is lagging behind in proper professional IT education. Therefore, by setting up modern ICT Laboratory the gap between such students may be reduced to some extent.

3. GOAL AND STRATEGIES: Setting up of Computer laboratory at Bongaigaon College, Birjhora Mahavidyalaya and Abhayapuri College with all modern facilities will spread IT education among the minority student community as well as other student of the district.

4. OUTCOME AND BENEFIT: Focus has been given on the student from minority class so as to make them IT competent with proper professional skills which will help the student community in making them self-sufficient and cope up with the global present scenario.

5. MILESTONES: After completion of the project these ICT laboratories will be the assets of the district and these will facilitates in producing good IT professionals in coming days.

6. APPROXIMATE COST: The project is to be constructed with an estimated amount of Rs. 1,54,71,300.00 (One Crore Fifty four Lakh seventy one thousand and three hundred) only. The estimate for Civil and Electrical Works has been prepared on basis of the schedule of rate of Chief Engineer, PWD(Building), Assam for the year 2004-2005 under all PWD Division of Assam. The rates of furniture has been considered on the local prevailing market rate. The rates of Computers and its peripherals have been considered on the basis of current market price.

76

7. YEAR WISE PHYSICAL AND FINANCIAL TARGET: Physical

Time Schedule

Financial Target

1. Survey, Drawing/Design etc.

30 days

2. NIT, Issue of work order etc.

45 days

First Phase: 30 % of Projected Amount.

3. Commencement of work

15 days

4. Time of Completion

9 Months

Second Phase: 70 % of Projected Amount.

8. Private Investment Participation (if any): No private participation will be required. 9. Project Location: The proposed locations of the ICT laboratories will at Bongaigaon College, Birjhora Mahavidyalaya and Abhayapuri College respectively. 10. Land Availability: There are sufficient land for setting up the ICT laboratories in the campuses of the respective colleges. 11. Intended Beneficiaries: The student community particularly from the minority areas will be benefited from the proposed project. 12. Duration Project : The project will be completed within one year in all respect. 13. Implementing Agency: The implementation agency will be the PWD, Goalpara Building Division for the Civil Work and PWD, Kokrajhar Electrical Division for the Electrical Work under administrative control of Deputy Commissioner, Bongaigaon . The Executive Engineer, PWD, Goalpara Building Division and Executive Engineer, PWD, Kokrajhar Electrical Division will be Nodal Officer and the Engineer in charge of the project. 14. Existing and Proposed Mechanism for implementation: For implementation of the project there are existing State Govt. line department in the district and the same will be responsible for implementing the project as per state government specifications. 15. Management/Operation and maintenance of assets created: The college authorities of three colleges have agreed to maintain the proposed ICT laboratories by making funds available in its budget.

77

NAME OF WORK: SETTING UP OF MODERN ICT CENTER AT COLLEGES. ABSTRACT OF COST Sl No.

Particulars

Estimated Amount(in Rs)

1

Cost of Computer System and its accessories including UPS, Printer, Switch, LAN Cable etc.

Rs. 52,13,500.00

2

Cost of Civil Works

Rs. 70,67,800.00

3

Cost of Furniture

Rs. 11,26,300.00

4

Cost of Electrical works including installation of 100 KVA sub-station, AC Machine along with Power line etc.

Rs. 20,63,700.00

Grand Total

Rs. 1,54,71,300.00

(One Crore Fifty four Lakh seventy one thousand and three hundred)

ESTIMATED COST OF COMPUTER SYSTEM AND ITS PERIPHERALS:: Sl No

Items

Qty

A. Server and Clients 1 Server (Including Monitor, Keyboard, Mouse) 2 Client (Including Monitor, Keyboard, Mouse) B. UPS 3 UPS 2 KVA UPS 600 VA (Line interactive) C. Printer 4 Laser Jet Color (Inkjet) D. LAN accessories 5 UTP Cables(CAT 6) 6 RJ45 Connector 7 16 Port Switch 8 Fitting and Fixing E. Software including licensed O/S 9 O.S for Server 10 O.S for Clients 11 Office Suits F. Projector 12 LCD Projector G. Installation 13 Installation H. Modem for Broadband Connection 14 Modem

3

Rate(in Rs)

Total Amount (in Rs)

1,50,000.00

4,50,000.00

125

32,200.00

33,81,000.00

3 125

54,000.00

1,62,000.00 375,000.00

6 6

11,000.00 5000.00

66,000.00 30,000.00

8 Coils 300 nos 9 1800 mtrs

7,000.00 5.00 5,000.00 15.00/mtr

56,000.00 1500.00 45,000.00 27,000.00

3 copies 15 Copies 3

50,000.00 8,000.00 6,000.00

150,000.00 120,000.00 18,000.00

3

90,000.00

270,000.00 50,000.00

3

4,000.00

12,000.00

Total : 52,13,500.00 (Fifty Two Lakh Thirteen Thousand Five Hundred Only)

78

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR HEALTH & FAMILY WELFARE

PROJECT COST - Rs. 0.75 CRORE

2007-08 To 2011-12

79

CONCEPT PAPER 1. GOAL: Socio-economic development of Minorities.

2. OBJECTIVE: To provide basic health care facilities to the minority population, living in hard-to-reach “char” and forest areas of Bongaigaon.

3. SITUATION ANALYSIS: As per national norms, there has to be one Health Sub-Center for every 5000 population. In backward and hard-to-reach areas even a population of 3000 is entitled to have a Health SubCenter. At present in many minorities inhabited areas, one Health Sub Center is catering the basic health services needs of 10,000-12,000 population. Manpower deputed from nearby health facilities are rendering services to these population, which has increased their workload. More over sustainability and desired quality of services can not be ensured with such arrangement.

4. CRITICAL GAP: a)

This is identified as, non existence of infrastructure to provide basic health care services.

b)

Non availability of quick mode of transport for critical patients.

5. STRATEGY: This gap must be filled up bya)

Establishing New Health Sub Centers as per need and extension of already existing health facilities.

b)

By providing quick transport facility for Medical Emergencies.

6. OUTCOME : Maternal mortality, Infant mortality will be lowered. People will accept small family norm leading to Population stabilization -> Economic development 6.1 The following is a suggested list of Health Sub-Centers to be established. (PHC wise) A) Under Srijangram PHC-covering Tapatari & Srijangram Dev. Block. 1. Chikatari

:-

Chikatari pt. I & II Dubachuri Pt.I & II Population 5,200 app.

80

B) Under Manikpur PHC: - (Manikpur Dev. Block) 1. Bhandara

:-

Bhandara pt-I, II, IV & VI Population- 5400 app.

C) Under Bongaigaon PHC: -(Dangtal Dev. Block) 1. Bilashpur

:-

Chikibiki Bagulamari Takuamari Nachankuti Halagura Population – 5,900 approx.

D) Under Boitamari PHC: -(Boitamari Dev. Block) 2. Balapara

:-

Chedamari Population-7,900 approx.

6.2 River AMBULANCE cum BOAT CLINIC (mini) : Three (3) numbers of River Ambulance cum Boat Clinic (mini), two under Srijangram PHC and another one under Boitamari PHC to be installed. They will regularly render medical services in the isolated small char areas of their respective block. They will also serve as River Ambulance for transportation of critical and emergency patients to the nearest Land Station where Road Ambulance will take over.

7. BUDGET REQUIREMENT : 1. Construction of Sub Center. @Rs. 7.5 lakh X 4 no.s of S.C.

=

Rs. 30.0 Lakh

=

Rs. 4.5 Lakh

=

Rs. 75.0 Lakh

2. River Ambulance cum mini Boat Clinic @ Rs. 15 Lakh per Boat Clinic X 3 Total

(Rupees Seventy Five Lakh only) Required Manpower to be sanctioned by the Govt.

8. TIME OF COMPLETION OF THE PROJECT - 2 (two) years i.e. by 2009-2010.

81

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR PUBLIC WORKS DEPARTMENT (RR)

PROJECT COST – Rs. 8.30 CRORE 2007-08 To 2011-12

82

CONCEPT PAPER 1. INTRODUCTION: Bongaigaon District is one of the Minority Concentration Districts (MCD) in the country which has both socio economic and basic amenities parameters are below national average. This can be attributed to poor communication scenario in the MCDs. The District has a total of 100.80 Km. of National Highways, 41.00 Km. of State Highways and 603 Km. rural roads. Most of the rural roads are not all weather roads.

2. SECTORAL POLICY: The major road schemes under implementation in the Districts are Pradhan Mantri Gram Sadak Yojana (PMGSY) funded by Govt. of India, Central Road Fund (CRF) funded by Govt. of India, RIDF funded by NABARD, ARIASP funded by the World Bank, etc. Each of the above mentioned schemes have been embarked upon with specific objectives. These Schemes do not specifically target minorities who are one of the marginal sections of the society. The scheme has been proposed under Multi Sectoral Development Plan which envisages infrastructure development for the entire community in the district.

3. THE PROJECT AT A GLANCE : 3.1. Summary of the Project:The project includes Construction/Improvement of 3.50 Km. of B.T. Road including drainage provision, 100Km GWC Road with Cross drainage works under Multi Sectoral Development Plan for Minorities in Bongaigaon District.

3.2. Estimated Amount: - Rs. 830.00 lakh 3.3. How the project fits into long term sectoral policy of the State : The proposed roads have been identified as the roads required to be developed at present to maintain the most effective sequence of road development in the Bongaigaon District. The construction of these roads will increase the utility of several other roads in the district to be developed subsequently.

3.4. Benefits expected to accrue after completion of the Project: The construction of the Roads will give direct connectivity to at least 25 villages inhabitated by minority community. Thus the project will give benefit to at least 15000 Minority Community people in respect of road communication.

83

4. FINANCIAL AND PHYSICAL PHASING OF THE WORK: The work can be completed within the financial year 2008-09 and 2009-10. The actual construction work is expected to start in the 4th quarter of 2008-09. The proposed phasing of the work is as under: Physical : Pre construction stage(i) Preparation of working drawings, estimates: 1(one) month (ii) NIT and issue of Work order

: 2 (two) months

Construction Stage(iii) Commencement of Work: 1 month (iv) Time of Completion: 8 months Financial :

Year

Financial (Rs in Lakh)

2008-09

330.00

2009-10

500.00

5. PROJECT FORMULATION TEAM: This project is formulated under the direction of the Deputy Commissioner, Bongaigaon with data base from the Executive Engineer, PWD, Bongaigaon Rural Road Division and his team of engineers.

6. PHYSICAL ASPECT OF THE PROJECT: 6.1. Physical activities to be taken up: The existing deteriorated damaged road surface is proposed to be converted into all weather road by metalling and black topping/ Gravel wearing Coarse. The proposed road will have 7.5 m formation width with 3.75 m carriageway width, 300 mm thick hard crust for BT Road and 150mm thick for GWC. The work will be executed through contractors after inviting national competitive bids and allotment of the works through departmental procedure.

84

6.2. The physical activities are planned below : COST ESTIMATE Name of Work:-Construction/ Improvement of 3.50Km of BT. Road

and 100Km GWC

Road with Cross drainage works under Multi Sectoral Development Plan for Minorities in Bongaigaon District.

Sl No.

Description of Work

Approximate Amount (in Lakh Rs.)

1

2

3

1

Construction/ Improvement of existing BT road including drain

130.00

2

Gravel wearing coarse including preparation of sub-grade and cross drainage work

700.00

Total

830.00

7. PROJECT MANAGEMENT, IMPLEMENTATION AND MONITORING : The implementing agency will be the Public Works Department of the Govt. of Assam comprising of more than 1300 qualified and experienced graduate Engineers who have several projects of road and bridge construction, road improvement, etc under various project like World Bank, NABARD loan, NEC, Border Roads and state Plan. The Executive Engineer of Bongaigaon Rural Road Division will be the Nodal Officer and will be the Engineer – in – charge of the Project. The progress of this project will be reported on a quarterly basis as per prescribed format. The QPR will be prepared by the additional Chief Engineer, P.W.D., Roads, Assam at the end of each quarter under report. The required information on progress of work will be submitted to the Deputy Commissioner of Bongaigaon to enable him to hold quarterly meeting to review progress of implementation of the ongoing projects. The utilization certificate of the fund received will also be furnished as required before subsequent release of fund. Wide publicity to the project will be given by the department through signboard at project sites and advertisement in newspaper etc.

85

8. STATUATORY CLEARENCE : Since work will be on existing road alignment, clearance from forest is not necessary. Pollution is non-entity. As such permission from pollution control board is not necessary. 9. AVAILABILITY OF LAND : Land acquisition is not at all necessary, as the construction will be on the existing road alignment, which is presently on P.W.D. land. 10. IMPLEMENTATION SCHEDULE :

Action

Likely Date

Sanction

31/10/08

Completion of detail working estimates and drawings

30/11/08

Issue of NIT

15/12/08

Issue of work order

15/01/09

Commencement of work

20/01/09

Completion of work

20/09/09

11. READINESS OF THE PROJECT FOR EXECUTION : The project site is ready for the construction work. The work can be immediately started after sanction and allotment after departmental formalities.

12.POST IMPLEMENTATION, MANAGEMENT, ARRANGEMENT OF THE PROJECT: The P.W.D under the Govt. of Assam has constituted a Road Board named “Assam State Road Board”, chaired by Hon’ble C.M of Assam. The maintenance and repair of the roads and bridges is the subject of the Assam State Road Board.

13. PROJECT FORMULATION PROCESS : This project is formulated under the direction of the Deputy Commissioner, Bongaigaon, with database from Executive Engineer, PWD, Bongaigaon Rural Road Division and his team of Engineers. The Executive Engineer, Bongaigaon Rural Road Division furnished the details of cost on the basis of survey and the computations of the quantities of work on the basis of survey. The rate of the items is from the APWD Schedule of rates of roads, bridges and culverts works for the year 2007-08.

14. BLUE PRINT / DESIGN : The road geometrics will be in conformity with relevant IRC Code of Practice. Cross sections of the proposed roadwork and locations map are enclosed herewith. Detail working drawings showing road curves etc will be prepared for execution after obtaining sanction of the Scheme.

86

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

P.W.D. (STATE ROAD)

PROJECT COST – Rs. 1.20 CRORE 2007-08 To 2011-12

87

CONCEPT PAPER ROAD PROPOSED UNDER MULTISECTORAL DEVELOPMENT PLAN FOR MINORITIES IN BONGAIGAON DISTRICT FOR THE YEAR 2008-09.

1.

i

SH-2 ( Jyoti Nagar ) to Kukurmari- Sutarpara Road .

ii

Kukurmari-Sutarpara Road

iii

Dhaligaon to New Bongaigaon Road .

iv

Lengtisinga to Santoshpur Road .

v

Talguri-Basygaon P.W.D.Road to Noldoba via Rural Hospital Road.

vi

Mulagaon Panchayat Office to Barsangaon Muslimpara Road.

SOCIO-ECONOMIC FEASIBILITY WITH JUSTIFICATION : The Communication scenario in and around of the above mentioned Roads is in very deplorable condition with only through roads to connect District Head quarter in a shortest way . Due to deplorable condition of the roads , the accessibility can not be established and speedy transport of finished products is not become possible. This has a serious impact in all round development and other social activities like education , health, marketing etc. for the minority people of this area.

2.

CRITICAL GAP : There is no any critical gap in the above mentioned Roads.

3.

GOAL AND STRATEGIES : The main goal & strategies of these projects is to connect this backward and interior places with the district head quarter by shortest route smoothly .

4.

OUTCOME AND BENEFITS : The construction of proposed roads will cater the basic purposes to make shortest connectivity to district Head Quarter , Railway station , Bus stand , Hospital etc. The entire road alignment passes through the agricultural & Commercial areas . Hence there is a high scope of development .

5.

MILESTONES : Socially backward people of these areas will be highly benefited .

6.

APPROXIMATE COST OF PROJECT :- Rs. 120.00 Lakhs ( Rupees one crore twenty lakh ) only.

7.

YEAR –WISE PHYSICAL & FINANCIAL TARGET.: i)

WORKING SEASON: Working season in this area consist of 5 to 6 month only in a year.

88

ii)

PROJECT IMPLEMENTATION SCHEDULE : PHYSICAL (a) pre-construction stage: N.I.T and issue of work orders =1 month

(b) Construction stage; i)

Commencement of the work = 1 month

ii)

Time of Completion= 9 months.

FINANCIAL: Year

Amount (Rs)

2008-09

48.00 Lakhs

2009-10

72.00 Lakhs

8.

PRIVATE INVESTMENT PARTICIPATION (IF ANY) : Nil

9.

PROJECT LOCATION: The location of the project is in the Bongaigaon district and of

10.

Minority people dominated areas.

LAND AVAILABILITY: Land acquisition is not at all necessary , as the Roads will be constructed along the existing track which is presently on P.W.D.Land.

11.

INTENDED BENEFICIARIES : The alignment of these roads mostly passes through the villages of minority people . The intention of these project is to benefit the people of this backward areas

12

DURATION OF PROJECT : 9 (Nine) months.

13.

IMPLEMENTING AGENCY: The implementing agency will be the Public Works Department of the Govt. of Assam, comprising of more than 1300 qualified and experienced graduate Engineers who have to their credit, completion of 1223 nos. of RCC bridges under various projects like World bank, NABARD loan, NEC, Border Roads schemes and State plan . The Executive Engineer, P.W.D Bongaigaon State Road division will be the Nodal officer and will be the Engineer-in-Charge of the project.

14.

EXISTING & PROPOSED MECHANISM FOR IMPLEMENTATION : Work will be carried out by the A.P.W.D Specifications current in the State and circulars issued from Govt.

15.

MANAGEMENT /OPERATION AND MAINTENANCE OF ASSETS CREATED: -Management, operation and maintenance of assets created will be supervised and maintained by the PWD, Assam.

89

COST ESTIMATE Sl. No.

Name of Road

1

SH-2 (Jyotinagar) towards

Total Length (Approx)

Item of works

0.90. KM.

E/W, GSB,WBM, PC

Kukurmari Sutarpara Road. 2.

Kukurmari Sutarpara Road

Total Amount (Approx 50,00 Lakhs

& SC, Culvert & Drain. 2.70 KM

E/W,WBM Patching ,

25.00 Lakhs

PC & SC, HP Culvert etc. 3.

Dhaligaon to New

4.50 KM

-Do-

25.00 Lakhs.

1.20 KM

E/W,GWC & Turfing

8.00 Lakhs

1.00 KM

GWC

7.00 Lakhs

1.00 KM.

-Do-

5.00 Lakhs

Bongaigaon 4.

Lengtisinga to Sontoshpur Road

5.

Talguri Basugaon PWD Road to Noldoba via Rural Hospital Road.

6

Mulagaon Panchayat Office to Barsangaon Mulsimpara Road

Total = Rs.120.00 Lakhs .

90

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR IRRIGATION

PROJECT COST – Rs. 1.30 CRORE 2007-08 To 2011-12

91

CONCEPT PAPER

1.

Socio Economic Feasibility with Jurisdiction: - Keeping in view of M.S.D Plan, we have spotted two areas namely village Dhaknabari and Baghpara which are inhabited by Muslim and Christian Communities respectively, whose primary source of lively-hood is agriculture. It is found that there is no any irrigation systems in the areas for which cultivators are fully dependable on monsoon rain for growing crops. As such their economic conditions are not sound. So, two irrigation schemes are proposed to improve their cultivation system and thus to improve their economic conditions.

2.

Critical Gap:- At present, the existing stream water found in the areas have not been utilized in irrigation purpose. After completion of the scheme, the stream water will be fully utilized for irrigation purpose for growing multiple crops.

3.

Goal and Strategies: - Our aim is to provide irrigation facilities to the down trodden cultivators by constructing boulder weir over river lets. These will create community assets by means of which the cultivators will be able to raise the production of multiple crops.

4.

Out come and benefits: - At present, the cultivators use to grow only Sali crops depending upon rain water and production rate is very low and irregular. On implementation of the proposed scheme, the food productions could be improved by growing multiple crops.

5.

Mile Stones: - The schemes will improve the economic condition of the farmers by increasing food productions.

6.

Approximate Cost of the Project: - Rs. 1.30 crores (as per ANNEXURE-I and ANNEXURE-II)

7. Year-wise Physical and Financial Target:Year

Physical Target

2007-08

Nil

Nil

2008-09

70%

70%

2009-2010

30%

30%

2010-2011

-

-

2011-2012

8.

Financial Target

-

-

Private Investment Participation(if any):-

92

Nil

9.

Project Location:(i)

Dhaknabari F.I.S is situated under South Boitamari G.P and about 25 K.M distance from Bongaigaon Town under Boitamari Development Block.

(ii)

Baghpara F.I.S is situated under Chakapara G.P. and about 20 K.M from Bongaigaon Town under Boitamari Block.

10.

11.

Land Availability: (i)

Dhaknabari F.I.S covers 200 Hectares (NIA)

(ii)

Baghpara F.I.S covers 80 Hectares (NIA).

Intended Beneficiaries: - Intended beneficiaries of Dhaknabari F.I.S are mostly of Muslim Community and Baghpara F.I.S are mostly of Christian Community.

12. Duration of Project:- Although the duration of the M.S.D.P for minority project is 200708 to 2011-2012, but our proposed project have to be completed within the first part of 2009-010 for the sake of nature of the work.

13. Implementing Agency: - Bongaigaon Division (Irrigation), Bongaigaon. 14. Existing and Proposed Mechanism for Implementation: - The work will be executed as per A.P.W.D norms and specifications.

15. Management/ Operation and Maintenance of the Assets Created: - After completion of the work, the scheme will be handed over to the ‘Water User’s Association.

ANNEXURE-I Name of the Scheme: - Dhaknabari Flow Irrigation Scheme

ABSTRACT 1. Detailed estimate for construction of C.C. Weir with boulder pitching …

Rs. 51.50 Lakh

2. Detailed estimate for construction of Canal Head Regulator



Rs. 3.50 Lakh

3. Detailed estimate for Afflux Bund



Rs. 3.50 Lakh

4. Detailed estimate for Earthen Canal



Rs. 7.50 Lakh

5. Detailed estimate for Coffer and Diversion Channel



Rs. 2.50 Lakh

6. Detailed estimate for Improvement of Approach Road and Protection work… Rs. 4.50 Lakh Total= Rs. 73.0 Lakh Add 3% contingency

………

(+)

Rs. 2.19 Lakh

G/Total Rs. 75.12 Lakh Say

Rs. 75.00 Lakh

(Rupees Seventy Five Lakh) only.

93

ANNEXURE-II Name of the Scheme:- Baghpara Flow Irrigation Scheme ABSTRACT 1. Detailed estimate for construction of C.C weir with boulder pitching

… Rs. 40.00 Lakh.

2. Detailed estimate for construction of Canal Head Regulator

… Rs. 2.50 Lakh.

3. Detailed estimate for Afflux Bund

… Rs. 2.50 Lakh.

4. Detailed estimate for construction of Canal

…. Rs. 3.00 Lakh.

5. Detailed estimate for Coffer and Diversion Channel

… Rs. 2.00 Lakh

6. Detailed estimate for Improvement of Approach Road and Protection work

… Rs. 3.50 Lakh

Add 3% Contingency

Total=

Rs. 53.50 Lakh

(+)

Rs. 1.60 Lakh

G/Total

Rs. 55.10 Lakh Say Rs. 55.00 Lakh

(Rupees Fifty Five Lakh) only.

94

GOVT. OF ASSAM

“MULTI –SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR SERICULTURE

PROJECT COST – Rs. 0.75 CRORE 2007-08 To 2011-12

95

CONCEPT PAPER 1. INTRODUCTION Sericulture is an agro based Industry and it comprises multifarious activities such as cultivation and maintenance of host plant, silk worm rearing for production of cocoon, reeling/spinning, weaving, printing and processing of silk fabrics. It plays an important role in the rural economy. Assam possesses the uncommon distinction of producing all four major verities of commercial silk Eri / Muga / Mulberry and Tassar. Our state has a virtual monopoly in the World in the Muga production. The state alone contributes 99% of the Muga Raw-silk production in the country. Bongaigaon district is also rich in production of Muga and Eri Raw silk and 3,564 Nos. families from 59 Nos. villages are involved in the culture.

2. SOCIO ECONOMIC FEASIBILITY WITH JUSTIFICATION : There are tremendous scope & prospect for upliftment of Socio Economic Development of Minorities through Sericulture. (i) Geographical Position : The district falls within the latitude 26 Degrees & 28 Minutes North to 26 Degrees 54 Minutes North & Longitude 89 Degree 42 Minutes east to 90 Degree 96 Minutes East. The Mighty Brahmaputra River flows along the southern Boundary & its Tributary Aie River flows through the District. The Climate of the District is Moderate during the winter & summer. The Soil of the District is alluvial & Fertile in General Mixture of red & Black Soil with PH 5.5 to 6.5. The soil has the capacity to luxurious grow of 3 types of Silk worm food plants & also conduct three types of silkworm rearing through out the year.

(ii) Available vacant land lying in the Char areas to raising of silkworm food plants. 3. CRITICAL GAP : (i)

Lack of awareness and skill upgradation.

(ii) Lack of Sophisticated infrastructure. (iii) No any provision of fund/Scheme like grants-in-aid etc especially for minorities.

4. GOAL AND STRATEGIES : The Goal and Strategies is to bring about a socio economic development of the selected concentrate minority area through promoting sericultural activities. The main Goals are – (i)

To use availability of waste land for Muga and Eri food plants in the concentrate Minority areas in the district.

(ii)

To generate gainfull employment in on-farm sector especially amongst self help groups.

(iii) To upliftment rural economy base on enhancing local resources along with utilization of local knowledge and skill base.

96

(iv)

To exploit available natural resources in the Minority areas to the based advantage of the sericultural Sector.

5. OUT COME AND BENEFIT : The project benefit will come after three years onwards. In the gestation period the self help groups will done intercropping like –Ginger, Potato, Linchid, Black Mole etc. After three years onwards each of self help groups will produces 56,250 nos. Muga Cocoons per crop and sale of Muga Cocoon @Rs. 500.00/- per thousand nos. valued Rs. 28,250.00/- and 925 Kg Eri cut Cocoon will be produce by each SHGs which valued Rs. 27,750.00/- in the beginning year. Five years later the annual income will be increased 4 to 5 times per year.

6. MILESTONES : The permanent assets will be create after implementation of the project. (i)

Construction of 1 No. Training cum production centre with Hostel facilities for 10 Nos. trainees having sophisticated equipments.

(ii)

Raising 30 acres of additional new plantation for Eri and Muga silkworm food plants.

7. APPROXIMATE COST OF PROJECT : Rs. 0.75 crores (Rupees seventy five lakhs) only.

8. YEAR WISE PHYSICAL & FINACIAL TARGET : Sl No. 1

Project Component

Physical Target

Financial Target

Construction of Training Cum production center having sophisticated equipments

1 Nos.

0.47550 Crores

2

Awareness Campaign & Skill up gradation training on Plantation, Silk Worm rearing, Grainage Technology & Post Cocoon Technology for 7 days.

60 Nos S.H.G.s (600 Nos. beneficiaries to be trained up)

0.07355 Crores

3

Raising of Block Plantation of SOM 15 acre & kesseru in 15 acre for 60Nos. S.H.Gs (1/2 Acre for each S.H.Gs)

30 Acre

0.07500 Crores

4

Raising of Som & Kesseru Nursery

50,000 Nos.

0.01250 Crores

5

Assistance to Provide Modern rearing equipment. @Rs. 12,500/- for each Group

60 Nos

0.07500 Crores

6

Maintenance cost of Plantation for 2nd & 3rd year.

30 Acres

0.02100 Crores

7

Supplying of Eri Spinning Machine with 50% Subsidiary ate @Rs. 5500/- each.

60 Nos.

0.01650 Crores

8.

Administration Cost

0.00095 Crores Total Rs. 0.7500 Crores (Rupees Seventy five Lakhs) Only

9. PRIVATE INVESTMENT PARTICIPATION :

97

NIL

10. PROJECT LOCATION : The project to be implemented at the following Minority Concentrate areasSl No. (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii)

Name of Concentrate Minority G.P.

Under Dev. Block

Balapara G.P. Khagarpur G.P. Lengtisinga G.P. Mererchar G.P. Jopea G.P. Chakla G.P. Golapara G.P. Bamunitila G.P. Chikibiki G.P. Salabila G.P. Hapasara G.P. Bhandara G.P.

Boitamari Dev. Block Do Tapattary Dev. Block Do Srijangram Dev. Blcok Do Do Dangtol Do Manikpur Do Do

11. LAND AVAILABILITY : Yes, land availability for Raising of Silk Worm food plants in the concentrate Minority area.

12. INTENDED BENEFICARY : 60 nos. S.H.Gs comprising 600 Nos. beneficiaries.

13. DURATION OF PROJECT : 5 years, 2007-08 to 2011-2012

14. IMPLEMENTING AGENCY : Superintendent of Sericulture, North Salmara, Abhayapuri.

15. EXISTING & PROPOSED MECHANISM FOR IMPLEMENTATION: (a) Existing Activities of Sericulture in Bongaigaon District. Activities

No. of families Involved (200708)

1.

Eri Silk Industry

S/C – 525 Nos. ST – 1348 Nos

2.

Muga Silk Industry

Gen – 1537 Nos. (Rajbanshi)

Mulberry Silk Industry

Muslim –108 Nos. Christian- 51 Nos. BuddihistNil Total – 3564 Nos.

Sl. No

3.

Nos. of Seri. Village

59 Nos.

(i) Eri Silk Worm food plants–185.33 Hector

Yeild of Cocoons/Raw Silk (in kg) (2007-08) Eri Cut Cocoon 15,250 K.G

(ii) Muga silk worm food plants – 218.6 Hector

Muga Raw Silk 45.8 K.G.

(iii) Mulberry silk worm food plant.– 2.5 Hector

Mulberry Raw silk Nil

Area under Silk worm food plants. (2007-08)

Total -

98

406.43 Hector

Nos. of Reeing/ Spinning Unit Nil Nil Nil

(b) Proposed Mechanism for implementation: (i)

To involve more minority families in Sericulture Industry.

(ii)

To increase production of Eri Cut Cocoons, Muga reeling Cocoons in the district through implementation of this project.

(iii)

To construct reeling/spinning and training cum production centre, provide modern technique of silk worm rearing, grainage and post cocoons technology etc. to 600 Nos. beneficiaries (60 Nos. SHGs)

(iv)

To increase additional silk worm food plantation in 30 Hectare area of land both Muga and Eri.

16. MANAGEMENT/ OPERATION AND MAINTENANCE OF ASSETS CREATED (i)

The permanent assets i.e. training cum production centre to be constructed within the campus of Govt. Institutes which will be looked after by Deptt.

(ii)

The silk worm food plantation to be planted at different G.P.s by SHGs and they will maintain the food plants.

99

GOVT. OF ASSAM

“MULTI –SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

FISHERIES

PROJECT COST – Rs. 1.00 CRORE 2007-08 To 2011-12

100

CONCEPT PAPER 1.

Socio-economic feasibility with justification : The Bongaigaon district falls under the Brahmaputra river basin. The district has large

nos. of water resources in the form of Beel Fisheries, Dead River, Low-lying Areas, Community Tanks and Private Ponds. The Brahamaputra and its tributaries of Aie and Manas is also regarded as the main fishery resources. The District has 5 nos. of registered Beel Fishery and about 79 nos. of unregistered beel fisheries, covering a water area of 1850.00 Ha . The biggest beel is having water area of 818.00 Ha and the rest are small minimum of which is 0.50 Ha. The district has about 7121 Nos. of private pond having water area of 801.10 Ha. There are about 195 nos. of Community Tank with a water area of 93.62 Ha. At present there are 3 nos. of Hatchery in the district , out of which 1 no is producing fish seed and the rest 2 nos. will start production from next season. The Fish production from all resources in the district is 4915.00 MT. The nutritional demand of fish in the district is 6319 MT. So, there is a wide gap between production and demand. Out of the total fish production 1602.00 MT(approx) comes from private ponds and tanks which is about 33 % of total production. The nos. of private ponds in the minority area is more , approximately it is 60 %. So , 60 % of production of cultured fishery comes from minority area.

But, regarding capture fishery the picture is quite different. Most of the natural resources are out side the minority area. The natural resources in the minority area are Dead River, Low lying area, small beel which are lying almost unutilized. If this water bodies are reclaimed/ converted to ideal fishery by constructing embankment, providing outlet /inlet, this will produce quite a large nos. of fish which will enhance the fish production of the district. The fish production will uplift the socio economic condition of the locality. During implementation of the project, a large no of rural employment will be created which will also contribute to uplift the socio economic condition of the minority area.

2. Critical Gap : The natural resources in the minority area are under developed and as such production is not as expected. The Fish farmers of the area are also not aware of scientific fish culture. Most of the farmers are poor and they are not in a position to provide the required inputs in the pond . So, they culture fish in traditional way as a result of which they do not get the expected production. More over, they are also not aware of the fishery rules and acts. One of the main problem in fish culture is availability quality fish seed. Quality fish seed plays a very vital role in fish production. So, it is necessary to give more importance on quality fish seed. In minority area there is no any hatchery at present.

101

To over come this gap it is necessary to develop the natural resources of the minority area, to make aware the fish farmers by providing training on pisciculture, arranging awareness camp and constructing Eco- Hatchery in the suitable minority area. Importance has been given in the Multi Sectoral Development Plan in this respect.

3. Goal and Strategies : The Goal of the Multi Sectoral Development Plan in Fishery Sector is to develop the resources of the area, uplifting the

Socio Economic condition of the locality and create

employment generation, create awareness about scientific fish culture and fishery Rules and Assam Fish Seed Act, to provide quality fish seed and at the same time enhancement of fish production. To achieve this goal following strategies has been taken up. i.

To develop the available beels and dead river.

ii..

To construct Community Tank.

iii.

To reclaim the community Tank

iv.

To construct Eco Hatchery.

v.

To construct tank of SHGs.

vi .

To train up the fish farmers

vii.

Create awareness amongst the people about Fishery Acts & Rules.

4. Outcome and benefit : The production of the natural resources at minority area is very meagre ,which is 50.00 kg to 100.00 kg per ha. After development, if proper care is taken up , production will go upto more than 1000.00 kg / ha. At present, the average production of the private ponds are 2000.00 kg / Ha . It can be raised to 3500.00/4000.00 kg / ha by providing training. At the same time supply of quality fish seed from the hatchery will play a very important role in fish production.

5. Milestone : If the strategies proposed are achieved it will be considered as a milestone in respect of production in the minority area.

6. Approximate cost of Project: The approximate project cost of the proposed schemes are enclosed. The approximate cost of the projects for 3 years is Rs.100.00 Lakhs.

7. Year wise Physical & Financial Target : Year wise physical and financial target is enclosed.

102

8. Private investment participation : There is no any private investment participation.

9. Project Location : The project will be located Block/GP minority area.

10. Land availability : Land is available for the proposed project.

11. Intended Beneficiary : The villagers surrounding the beel/ dead river, Community tank will be the beneficiary of the scheme. In case of tanks of SHG , the members of the SHG will be the beneficiary. The workers engaged in the development work are also considered as beneficiary of the project.

12. Duration of the Project : The duration of the project is 3(three) years.

13. Implementing Agency : The Fishery Department is the implementing agency.

14. Management /Operation and maintenance of assets created : Almost all the projects proposed are community based.

After completion of the

development work of the project, the projects will be handed over the local committee and the committee will be responsible for management of the project. Departmental officer will be member of the committee. Technical guidance for management will be provided by the department.

15. Schemes proposed : In the Multi Sectoral Development Plan for Minorities of the district following schemes has been proposed for up lifting the socio economic condition of the minorities at the same time enhancement of fish production of the district. 15.1. Development of Beel Fisheries/ Dead River : Most of the beels are lying unutilized, infested with heavy aquatic weeds. Fish production in the beels are very negligible. It ranges from mere 50.00 to 100.00 kg / ha. But this beels can be converted to ideal fishery by clearing the infested weeds, construction of perimeter bundhs , stocking of fish seed , implementing fishery rules etc. Production of fish may be raised to 1000.00 Kg / ha/ year. At the same time a large nos of employment will be generated. Like beel fisheries, the dead rivers are also a good source of fish production . But dead rivers are also at present lying unutilized and fish production is very meagre. These can be converted to ideal fishery by construction of embankment , construction of outlet – inlet ,

103

clearing of aquatic weed , stocking of fish seed. There are some dead river having patta land. This can also be developed by constituting fishery co-operative society by the patta holders. It has been proposed to develop 15.00 Has of Beel Fisheries/Dead River during the plan period. At the time of implementing the scheme, a large nos of rural employment will be generated. 15.2. Construction of Community Tank : Construction of village community tank can be taken up to raise the socio economic condition of the village people. At the same time fish production of the district will also be raised. It has been proposed to construct community tank of 3.00 Has water area . 15.3. Development of Community Tank : The Community Tanks of the villages are in a dilapidated condition . These can be developed /renovated for better use and for more fish production. It has been proposed to develop community tank of 5.00 ha water area in the plan period. 15.4. Consturction of Eco Hatchery : To meet the demand of quality fish seed of the fish farmers of the district, it has been proposed to establish at least 2 nos of Mini Eco Hatchery The hatchery will produce quality fish seed and at the same time employment will be generated . The management of the hatchery will be given to the SHG of the locality. Training and technical know how will be provided by the department to the SHG. At present there are only 3 nos. of hatchery in the district . Out of these 2 nos in pvt. Sector and 1 no. is in govt. sector. Out of 2 nos. of pvt. sector, one hatchery is operating well and other will start operating in next season. 15.5. Construction /Renovation of Tank of SHG/Integrated Fish Culture : There are some fishery SHG running with small sized tanks . Fishery tanks may be constructed for the SHGs having their own land . This will generate more income to the SHGs. It has been proposed to cover 3.00 Has of water area in 3 years. It is also proposed to take up a project on integrated fish farming in one community tank. 15.6. Training : It is proposed to train up the beneficiaries of the above mentioned schemes along with other non beneficiary fish farmers.. It is proposed to take up training programme of 5 days duration to train the fish farmers . It is proposed to train up 400 nos fish farmers in 3 years. Stipend will be provided at the time of training. 15.7. Awareness Camp : Most of the farmers at present taking up fish culture in traditional way. Also most of the people are not aware of the fishery Acts and Rules. So, it has been proposed to hold 10 no. Awareness Camps in the district at various places to make people aware about scientific fish culture, conservation of fish and fisheries, Assam Fishery Rules and Assam Fish Seed Act. An amount of Rs.100.00 Lakhs has been proposed for the Multi Sectoral Development Plan for the Minorities for a period of 3 years for 2008-11.

104

Table- 19. Schemewise and Yearwise Requirement of Fund for Multi Sectoral Development Plan for Minorities Sector : Fishery Year : 2008-2011

Sl No Name of the Scheme

Location

Target

Proposed Fund

Hactre 15.00 Ha

Rs.50.00

Unit

1

Development of Beel Fisheries/ Dead River

Block Area

2

Construction of Community Tank

do

do

3.00 Ha

Rs.15.00

3

Development of Community Tank

do

do

5.00 Ha

Rs.5.00

4

Construction of Hatchery

do

No

2 No

Rs. 12.00

5

Construction / Renovation of Tank of SHG/ Ijntegrated Fish Culture

do

Hactre

3.00 Ha

Rs. 15.00

6

Training

do

400 Nos

Rs.

2.00

10 Nos

Rs.

1.00

No of beneficiary 7

Awareness Camp

do

No

Total

Rs. 100.00 ( Rs. In Lakh)

Sector : Fishery Year

: 2008-2009

Sl No Name of the Scheme

1

Development of Beel Fisheries/

( Rs. In Lakh) Location

Block Area

Unit

Target

Proposed Fund

Hactre

5.00 Ha

Rs.16.70

Dead River 2

Construction of Community Tank

do

do

1.00 Ha

Rs. 5.00

3

Development of Community Tank

do

do

2.00 Ha

Rs. 2.00

4

Construction of Hatchery

do

No

1 No

Rs. 6.00

5

Construction / Renovation of Tank

do

Hactre

1.00 Ha

Rs. 5.00

150 Nos

Rs. 0.75

4 Nos

Rs. 0.40

of SHG/ Ijntegrated Fish Culture 6

Training

do

7

Awareness Camp

do

No of beneficiary No

Rs. 35.85

Total

105

Sector : Fishery Year

: 2009-2010

Sl No Name of the Scheme

( Rs. In Lakh)

Location

Unit

Target

Proposed Fund

Hactre

5.00 Ha

Rs. 16.70

Block Area 1

Development of Beel Fisheries/ Dead River

2

Construction of Community Tank

do

do

1.00 Ha

Rs. 5.00

3

Development of Community Tank

do

do

2.00 Ha

Rs. 2.00

4

Construction of Hatchery

do

No

1 No

Rs. 6.00

5

Construction / Renovation of Tank

do

Hactre

1.00 Ha

Rs. 5.00

No of beneficiary 125 Nos

Rs. 0.625

of SHG/ Integrated Fish Culture 6

Training

do

7

Awareness Camp

do

No

3 Nos

Rs. 0.30 Rs.35.625

Total

Sector : Fishery Year

: 2010-2011

Name of the Scheme Development of Beel Fisheries/

( Rs. In Lakh)

Location Block Area

Unit

Target

Proposed Fund

Hactre

5.00 Ha

Rs.16.70

Dead River Construction of Com munity Tank

do

do

1.00 Ha

Rs. 5.00

Development of Community Tank Construction of Hatchery Construction / Renovation of Tank of SHG/ Ijntegrated Fish Culture

do do do

do No Hactre

1.00 Ha

Rs. 1.00

1.00 Ha

Rs. 5.00

Training

do

125 Nos

Rs. 0.625

Awareness Camp Total

do

3 Nos

Rs. 0.30 Rs. 28.525

106

No of beneficiary No

GOVT. OF ASSAM

“MULTI –SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

HANDLOOM & TEXTILES

PROJECT COST – Rs. 0.75 CRORE 2007-08 To 2011-12 107

CONCEPT PAPER 1. INTRODUCTION : The Handloom industry of Assam is a time honoured cottage industry providing employment either directly or indirectly to about 18 lacs people. The industry has a glorious past in the state. The state has nearly 14 to 15 lacs looms. Out of this only about 3 lacs are commercial looms. In Assam, large number of primitive looms are used for making domestic cloths. The Handloom industry of Assam has engaged a large no. of workers next to Agriculture sector. But the Minority people of the State are still lagging behind in using this household cottage industry as their livelihood. The weavers are to be encouraged to take up commercial production of Handloom through well structured programme which may include commercial production as well as marketing.

2. OBJECTIVE : The main objective of the scheme are specially for upgradation of skills of women weavers, production of high value items, setting up adequate forward and backward linkages, for development of handloom activities of targeted weavers. The focus in the selected areas shall be to provide improved earning through weaving practices. Uncompetitive handloom products have to be phased out and to be replaced by commercially viable product meant for both local and foreign market. This may be achieved through intensive training for upgradation of skills. This industries substantially will accelerate the income generation activities and increase earning through reasonable prices, computerized design and product development, need based infrastructural facilities, comprehensive market and availability of welfare measures for Handloom workers . However the broad parameters of the schemes are : (i)

To provide necessary support in a comprehensive manner for production of target / beneficiary oriented schemes for pre/post loom operation .

(ii)

To upgrade skills of weavers and quality of product.

(iii)

To ensure export the Handloom products.

(iv)

Protection of traditional , ethnic and linguishing weaving crafts of the state.

(v)

To provide requisite infrastructure support.

3. IMPLEMENTATIONS :

The project will be implemented by the following sequences : (i)

Selection of beneficieries / minority weavers in the proposed area.

(ii)

Training programme of Minority Weavers.

(ii)

Modernization of looms.

108

(iii)

Design inputs

(iv)

Margin money for working capital

(v)

Common facility centre cum market facility

4. SELECTION OF WEAVERS / BENEFICIARIES : The total (160 + 40 = 200) Nos. of Minority weavers family belongs to who are interested to take weaving as profession will be covered under the project. The priority will be given to Minority weavers having interested and skills to take up Handloom as an income generating activities for their economic upliftment.

5. TRAINING PROGRAMME : For the development of minority women are to be imparted training on. Handloom weaving and Handwoven fabrics. During the period of training their skill on weaving will be upgraded. There are 2 (two) Nos. of Handloom Training Centres with sufficient technical staff and necessary infrastructure and training equipments. One at Abhayapuri under North Salmara subdivision and another is at Chokapara under Bongaigaon subdivision. These HTC were established with a view to train the rural artisan in modern Handloom equipments in one year course. These two HTC is proposed for the said purpose. Moreover 20 nos. of Handloom production unit of different SHG/Mohila Samity/ PWCS under DDP Scheme for the year 200607 in the District of Bongaigaon would be utilised for the training purpose under this scheme . The duration of the training will be one month only.

6. RESOURCE PERSON : The Instructor/ Demonstrator working under the HTC of the District is proposed as resource person for the training. Moreover some unemployed Diploma/ Certificate holder of Handloom Textiles Technology would be appointed as resource person for the scheme.

7. SYLLABUS OF THE TRAINING : The Syllabus of the training will be as follows : (i)

Introduction of modern equipments.

(ii)

Design diversification

(iii)

Product diversification

(iv)

Quality control

(v)

Packaging

(vi)

Marketing and market trend

(vii)

Dyeing and printing.

109

8. DESIGN DEVELOPMENT : The existing design are mostly ethnic and traditional types. To upgrade design modify and colour combination according to the choice of National and International market are important factor for survival of Assam Handloom So, a freelance designer will be engage to give training to the weaver for development of design and computer aided designing system will be introduced to transferring commercially viable product. For which Rs. 1,00,000/ will be required.

9. COMMON FACILITY CENTRE CUM TRAINING HALL : To provide skill upgradation on modern handloom, training are essential . It is observed that in minority areas there is no training centers to conduct training on weaving. It is proposed to construct 13 Nos. of training centres in different locations in the district with necessary furniture @ unit cost of Rs.7.0 lakhs each. Thus total 91.0 lakhs will be required to construct training centers. The proposed center at Boitamari area will be used as vegetable dyeing centre.

10. IMPLEMENTING AGENCY : The project will be implemented by Supdt. Handloom & Textiles, North Salmara, Abhayapuri. The Officer in-charge will act as implementing officer and local committee will also be constituted to monitor the physical and financial achievement under the Chairmanship of Deputy Commissioner.

11. FINANCIAL IMPLICATION OF THE PROJECT : 11.1. TRAINING : 200 Nos. of Minority weavers will be trained up for a period of one month in twelve groups in weaving and 60 Nos. of weavers will be trained on dyeing. Thus total 300 weavers will be trained up. 11.2. MODERNIZATION OF LOOMS AND ACCESSORIES : Total 160 Nos. of Minority weavers will be provided a set of modern types of Frame looms with Jacquard attachment at a cost of @ Rs.8000/- each . 11.3. PROCUREMENT OF JACUARD MACHINE : A set of 200 hooks Jacuard machine @ Rs. 4000/- will be provided to each 4 Nos. in each Centre. Minority weavers under the project for production high value fabrics Total 40 Nos. Jacquard Machine will be given in 10 nos. of centres. 11.4. MARGIN MONEY FOR WORKING CAPITAL : 160 nos. of Minority weavers will be provided margin money for working capital at an unit cost of Rs. 1000.00 each. 11.5. SUPPLY OF PRE-WEAVING EQUIPMENTS : 10 nos. of Warping Drum will be provided @ Rs 8,000.00 per Drum for per-weaving activities in the project.

110

11.6. DESIGN DEVELOPMENT : One qualified freelance designer/ Computer aided designing system will be engaged for development of at a cost of Rs. 10,000.00per unit x 10 nos. = Rs. 1,00,000.00 11.7. TRANSPORTATION AND ADMINISTRATIVE CHARGE : A sum of Rs. 55,000.00 will be spent as Transportation and Administrative cost of the project. 12. VEGETABLES DYEING CENTRE AT BOITAMARI : Vegetables dyes are extracted from plants and fruits which are easily found in the household. Vegetables dyes are preferable than the chemical dyes because some chemical dyes can produce ill effect over skill. The vegetables dyes are totally free from any sort of such effects. Poor weavers of the interior places of Bongaigaon District may dyed their materials with vegetables dyes at very low cost . Now a days, the expert in the field of textile dyeing also getting concentration on vegetable dyeing as it is eco-friendly. Total financial involvement for dyeing will be as follows Fixed Capital 1. Machineries & equipments

=

Rs. 3.00 Lakhs

2. Furniture & Fixture

=

Rs. 1.00 Lakh

=

Rs. 4.00 Lakhs

= =

Rs. 1.00 Lakh Rs. 2.05 Lakhs

Total Working Capital Training Cost expenditure is given below Total Project Cost. Total Fixed capital

=

Rs. 4.00 Lakhs

Total Working capital

=

Rs. 1.00 Lakhs

Training expenditure

=

Rs 2.05 Lakhs

=

Rs. 7.05 Lakhs

Grand Total

Training on dyeing as per Cluster Development Project Norms Sl. No.

Components

Requirement for fund

1

Stipend to 40 Weavers @ Rs. 1500 per month

Rs. 60,000.00

2

Honourium to Master Trainers per month

Rs.

3

Raw materials @ Rs. 3200.00 per trainee x 40 Nos.

Rs.1,28,000.00

4

Documentation of design

Rs.

5,000.00

5

Administrative & Miscellenious Expenditure @ Rs. 2.5% of total cost.

Rs.

7000.00

Total

Rs. 2,05,000.00

111

5000.00

Training on Weaving Total trainees

=

160 Nos.

No. of weaver / group

=

20 Nos.

No. of Batch Duration of training

= =

8 Nos. 1 Months

1. Stipend Rs. 1500/- weavers x 20 Nos.

=

Rs.

30,000.00

2. Raw Materials @ Rs. 750/- weavers x 20 Nos.

=

Rs.

15,000.00

3. Master trainer @ Rs. 5000/ per month x 1 month

=

Rs.

5,000.00

4. Documentation of Sample

=

Rs.

5000.00

5. Training , Materials as like Black Board, Pencil, Graph Paper, etc.

=

Rs.

10,000.00

6. Administrative Expenditure.

=

Rs.

5000.00

Rs.

70,000.00 Per batch

Total

=

Grand Total = Rs. 70,000.00 x 8 = Rs. 5,60,000.00 (Rupees Five Lakhs Sixty thousand only)

13. FINANCIAL ANALYSIS : 1. Training of weaving

=

(In Lakhs) Rs. 5.60

2. Training on dyeing

=

Rs.

7.05

3. Supply of looms & accessories @ Rs. 8000/ x 160 Nos.

=

Rs.

12.80

4. Pre weaving @ Rs. 10000/ x 10 Nos.

=

Rs.

0.80

5. Jacquard Machine @ Rs. 4000/ x 40 Nos.

=

Rs.

1.60

6. Yarn @ Rs. 1000/ each x 160 Nos.

=

Rs.

1.60

7. Training centre cum production Hall including 1 dyeing Hall 10 Nos. x 4.00 Lakhs 8. Furniture @ Rs. 40,000.00 x 10 Nos.

=

Rs.

40.00

=

Rs.

4.00

9. Design Development (Rs. 10,000 / x 10)

=

Rs.

1.00

10. Administrative and Publicity

=

Rs.

0.55

=

Rs.

75.00

Total ( Rupees Seventy five Lakhs only)

112

ANNEXURE Year wise Physical & Financial Target The Whole Scheme is assumed to be completed within one year from the date of starting . however maximum time period may be required three years as follows. Name of the Component

Ist year Physical

2nd year Financial

1. Training of weaving

Physical

3rd year Financial

160

Financial

5.6

2. Training on dyeing 3. Supply of looms &

Physical

(Rs.In Lakhs) 5.6

40

7.05

7.05

160

12.80

12.80

8

0.80

0.80

1.60

1.60

6. Yarn

40 160

1.60

1.60

7. Training center cum

10

40.00

40.00

10

4.00

4.00

accessories 4. Pre Weaving 5. Jacquard Machine

production Hall 8. Furniture 9. Design Development 10. Administrative and Publicity

10

1.00

0.55

1.00 0.55

61.35

5.60

8.05

75.00 Lakhs

113

GOVT. OF ASSAM

“MULTI –SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR ANIMAL HUSBANDRY & VETERINARY

PROJECT COST – Rs. 1.02 CRORE 2007-08 To 2011-12

114

CONCEPT PAPER 1. INTRODUCTION : Animal Husbandry plays a very vital role in Socio-Economic development of rural people as well as creats Self Employment opportunity to rural Youth & women folks. The modern scientific Piggery, Goatery, Dairy, Poultry & Duckery farming provides ample scope for upliftment of rural economy to the people living below poverty line. On the other hand adoption of livestock and poultry farming with modern technology will enhance the production of Vet commodities and thereby fulfill to some extent the demand of milk, meat & eggs for human consumption. Livestock sector plays a crucial role in rural economy & livelihood. The prolificacy of Goat,Pig and poultry are the influencing factors. The returns are quick , losses if any recovers soon and the poor can afford it. This sector plays vital role in providing nutritive food, rich in animal protein to the public and in supplementing family incomes particularly among the landless, small marginal farmers. Animal Husbandry provides additional employment avenues

to the rural people

specially woman folks who manage the livestock in the household and thereby uplift economic status in the family. The entire project amounting to Rs.150.00 lakhs will be implemented during the period of

5 years i.e. 2007-2012. Location of the project and selection of beneficiaries are to be done

in Minority concentrated area of the Bongaigaon district of Assam amongst the SHG of unemployed youth and women folks. The District Administration in collaboration with A.H. & Veterinary Deptt. of the District will be the sole implementing agency to implement the entire project, Where as the management and maintenance of assets will be made by the beneficiaries concerned.

ABSTRACT OF SCHEMES TARGET /UNIT

TOTAL COST IN 5 YEARS

REMARKS

Semi intensive Goat farming for SHG beneficiary @ Rs. 1.00 lakh per unit

35

35.00 L

Investment cost

2

Semi intensive Pig cum Fishery for SHG beneficiary @ Rs. 1.00 lakh/unit

40

40.00 L

-do-

3

Semi intensive Duck cum fishery for women SHG @ Rs. 0.50 lakh/unit

30

15.00 L

-do-

4

CAPACITY BUILDING a): Awarness cum training of livestock farming @ Rs. 27,000/ each per unit b): Treatment & Vaccination camp of livestock @ Rs. 10,000/ each

26

7.02 L

-do-

3.00 L

-do-

SL. NO. 1.

PARTICULARS

30

Total : ( Rupees One Crore two Lacs ) only

115

Rs. 100.02 Lakh

TABLE- 20. YEARWISE BREAK UP ( PHYSICAL) Sl. No

Particulars of the scheme /project

Total unit

1.

Setting up of Semi intensive Goat Farm for SHG with 240 Nos.of Goat/unit Setting up of semi intensive piggery farm for SHG with 164 nos pig/unit

2

3

4

2008-09

2009-10

2010-11

2011-12

Tar get

Nos/ unit

Total

Tar get

Nos/ unit

Total

Target

Nos/ unit

Total

Target

Nos/ unit

Total

35

20

42

840

5

42

210

5

42

210

5

42

210

40

20

5

100

10

5

50

5

5

50

5

5

50

Setting up of Duck cum Fishery for women SHG with 315 Nos. of Duck/ unit a) Awarness cum training of armers (Piggery/Goatery/ Duckery) @ 50 members/training programme

30

10

315

3150

10

315

3150

5

315

1575

5

315

1575

26

8

50

400

6

50

300

6

50

300

6

50

300

b) Treatment & vaccination camp of Livestock

30

9

--

9

7

--

7

7

--

7

7

--

7

TABLE- 21. YEARWISE BREAK UP (FINANCIAL) ( Rs. in Lacs ) Sl. No.

Particulars of the scheme /project

1.

Setting up of Semi intensive Goat Farm for SHG @ Rs. 1.00 lac Setting up of semi intensive piggery farm for SHG @ Rs. 1.00 lac

2

3

Setting up of Duck cum Fishery for women SHG @ Rs. 0.50.lac

2008-09 Target Fund required

2009-10 Target Fund required

2010-11 Target Fund required

Target

2011-12 Fund required

35

20

20.00

5

5.00

5

5.00

5

5.00

40

20

20.00

10

10.00

5

5.00

5

5.00

30

10

2.50

10

2.50

5

1.25

5

1.25

26

08

2.16

6

1.62

6

1.62

6

1.62

30

09

0.90

7

0.70

7

0.70

7

0.70

a) 4

Awarness cum training of farmers (50 Nos. ) @ Rs. 27,000/ unit b) Treatment & vaccination camp of Livestock @ Rs. 10,000/ unit

Total unit

116

2. SETTING UP OF SEMI INTENSIVE GOAT FARMING FOR S.H.G. INVESTMENT COST:1. Construction of Goat shed @ 10 sqft per Doe & 20sqft per Buck for 2 Nos. of Buck & 40 Nos. of Does @ Rs.40/- per sqft.------------ Rs. 17,600/ 2. Cost of equipment (Feeder,waterer) for 42 Nos of Goat @ Rs. 40/ per animal -------------------------------------------------------- Rs. 1,600/3. Cost of animal:(a): Cost of 40 Nos. of Does of 8-9 months old @ Rs. 1500/ each--- Rs. 60,000/(b): Cost of 2 Bucks of 12 month old @ Rs. 2000/each--------------- Rs. 4,000/4. Supplementary concentrate feeds per breeding cycle-1200kg @ Rs. 4/ per kg _------------------------------------------------------------ Rs. 4,800/5. Cost of fodder cultivation in 2 acre land @ Rs.3000/- per acre------- Rs. 6,000/6. Insurance premium @ 4% ------------------------------------------------ Rs. 2,560/7. Cost of Vety.Medicine/vitamins etc.------------------------------------- Rs. 2,500/8. Miscellaneous contingencies L.S.---------------------------------------Rs. 860/_________________________________ Total Rs.1,00,000/Total Cost of 01 Unit --------------------------- Rs. 1,00,000.00 Total cost of 35 such unit = 1,00,000.00 x 35= Rs.35,00,000.00 (Rupees Thirty five lakhs ) only

2.1. JUSTIFICATION & OBJECTIVES:Keeping in view the great possibility of Goat rearing the scheme is prepared for involving 35 Nos. of SHG among the BPL of minorities community in order to augment the income generation and self employment of the rural people.

2.2 SEMI INTENSIVE PIG CUM FISHERY FARMING FOR SHG INVESTMENT COST:1. Cost of construction of Pig shed for 01 (one) Boar, 4 Nos. of Sows & piglets @ 70 sqft/Boar,60sqft/Sow & 12,5sqft for fattener @ Rs. 70/ per sqft.....................................................

Rs. 39,900/-

2. Cost of equipments L.S. ............................................................. Rs. 1,300/3. Cost of animals: (a) : Cost of 1 improved Boar @ Rs.3000/each.................... Rs. 3,000/(b) : Cost of 4 Nos improved sows @ Rs.2500/each............ Rs. 10,000/4. Feeds (a): For adult – cost of feeds for parent stock @ 3kg/ per day per baor and 3.5 kg /day/sow (cone 30% & waste 70% = 1350kg cone & 4600kg waste) @ Rs. 6/per kg & Re.1/ per kg. respectively..............................

117

Rs. 15,000/

(b) : For fatteners- Cost of feed for fatteners @ 1.75/kg per fattener ( cone 30% & waste 70%=2363 kg cone & 5513 kg waste @ Rs. 6/per kg & Re.1/kg respectively ................................................................

Rs. 19,690/-

5.

Insurance @ 5% of animal value..............................................

Rs.

650/-

6.

Cost of Vety. medicines/ feed additives ..................................

Rs.

500/-

7.

Construction of Fish tank near the pigshed L.S.......................

Rs. 10,000/-

________________________________ Total Total cost of 40 such unit

Rs. 1,00,000.00

Total cost of 01 Unit

=

Rs. 1,00,.000.00

= Rs.100000.00 x 40

=

Rs. 40,000,00.00

( Rupees Forty lakhs ) only

2.3. NEED & JUSTIFICATION : Pig

farming to be established for the Christian community to create subsidiary

occupation, improving economic status as well as to increase pork production. Baring the Muslim community, people of other castes rears pigs. In order to

popularize the modern

technique of pig farming and fulfill the demand of pork consumers the project is prepared involving 40 Nos. of SHG of minority community.

2.4. SCHEME FOR DUCK CUM FISHERY INVESTMENT COST: 1. Construction cost of Duck house @ 3 sqft/duck for 300 Nos. of duck with locally available materials @ Rs. 22/sqft...............

Rs.

13,200/-

2. Equipments & appliances @ Rs. 5/ per duck.............................. Rs.

1,000/-

3. Cost of 315 Nos. of 12 weeks old khaki champbell duck ( assuming 5% mortality) @ Rs. 80/each..................................

Rs.

16,800/-

4. Cost of concentrate ration for 3 month of rearing @ 5kg/duck @ Rs. 8/kg.................................................................

Rs.

8,400/-

5. Insurance premium @ Rs. 2/ per duck......................................

Rs.

400/-

6. Construction of fish pond L.S. ................................................

Rs.

10,000/-

7. Miscellaneous contingency ....................................................... Rs. 200/……………………….. Total Rs. 50,000.00 Total cost of 1 Unit ......................... Total cost of 30 such Unit Rs. 50,000 x 30 =

Rs.

50,000.00

Rs. 15,00,000.00

( Rupees Fifteen lakhs)only only.

118

Promotion of 30 unit of Duckery for encouraging backyard duck farming for production of eggs & meat by the SHG of minority community thus providing self employment opportunity & economic upliftment of the farmers.

3. CAPACITY BUILDING:Sl.No. 1.

Particulars

Physical

Financial(in lakh)

26unit

Rs. 7.02 lakhs

30 unit

Rs. 3.00 lakhs.

Total

Rs. 10.02 lakhs.

Awarness cum training on livestock/poultry farming to SHG members @ Rs. 27,000/ per unit

2.

Treatment & vaccination camps for livestock in the selected areas with purchase of necy medicines & vaccines @ Rs. 10,000/-

( Rupees Ten lakhs & two thousand) only

4. ESTIMATE FOR TRAINING PROGRAMME FOR DAIRY / PIGGERY / GOATERY & POULTRY FARMING Sl.No 1 2 3 4 5 6 7 8 9

Particulars

Amount ( in Rs.) Rs. 400/ Rs. 1000/Rs. 3850/-

Banner writing Inaugural function of training programme Morning & Evening tea for trainees & Resource persons @ Rs. 7/- each for 5 days for 50 + 5 members Lunch for 55 Nos @ Rs. 40/ each for 5 days Rs. 11000/ Note book/Pen for 50 Nos @ Rs. 20 for each Rs. 1000/Rs. 2200/Remuneration to Resource person @ Rs. 200/ per class for 11 classes Rs. 1500/Accommodation & arrangement of room for training programme T.A. to trainees @ Rs. 20/- per days per head for 5 days. Rs. 5000/Valedictory function & public address system Rs. 1050/Total Rs. 27,000.00 Total unit cost ........................................Rs. 27,000.00 Total cost of such 26 Nos. of unit Rs. 7,02,000.00 ( Rupees Seven lakhs & two thousand) only

4.1. NEED & JUSTIFICATION: In order to provide basic knowledge to SHG members & interested progressive farmers awareness cum training on farm management of Dairy, Piggery, Goatery & Poultry are to be conducted amongst the minority community.

119

5. PROJECT FORMULATION, MANAGEMENT IMPLEMENTATION & MONITORING PROCESS : The project is prepared as per guideline of Multi Sectoral Dev. Plan with detailed plan & estimate of Animal Husbandry Sector under Bongaigaon District with a aim to develop the economic status of minority community of the rural areas through the livestock farming. The implementing agency will be the District A.H. & Vety. Officer, Bongaigaon whereas the District Administration is the Nodal agency. The implementation of the project will be as per Govt. instruction .The progress of this project will be reported on quarterly basis alongwith utilization certificate of fund.

6. EXECUTIVE SUMMARY:Livestock sector is key sector in State economy of Agriculture. It support in contributing to the health & nutrition of the household, generate income and offer employment opportunity . It develops steady growth & thus providing stability to the overall family income. The proposed project of livestock farming is aimed at creating scope for enhancement of economic status of BPL & self employment as well as increase production of milk, meat, eggs etc.

This project provide awareness of health care of livestock & basic technical knowledge of farm management. Livestock production is most effective method of poverty alleviation in rural areas.

120

GOVT. OF ASSAM

“ MULTI- SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR DAIRY DEVELOPMENT

PROJECT COST – Rs. 1.50 CRORE 2007-08 To 2011-12

121

CONCEPT PAPER 1. INTRODUCTION : Modern and scientific approach to dairy farming not only helps in increasing the per capita availability of milk but also take part as a major tool for socio-economic upliftment of the rural masses, who belong to the poorer section of the society. Keeping this in view Dairy Development, Govt of Assam, along with Central Government has been taking up various projects and schemes like Assam Agricultural Competitiveness Project (AACP), Integrated Dairy Development Project (IDDP) Phase-I & Phase-II, Milk Village Scheme and other collaborative projects with the other state departments or with the financial institutions. But unfortunately none of these projects or schemes have been undertaken in Bongaigaon district. Therefore under the above circumstances for growth and increase of milk production along with the creation of it’s processing facilities viz-a- viz to uplift the economic status of rural population for the district, a project proposal is prepared to be implemented under Multi Sectoral development plan for improvement of the quality of Minority people targeting vigorously the welfare of each Minority household and villages during 11th five year plan.

2. SOCIO ECONOMIC FEASIBILITY : As the economy of Bongaigaon district is of an Agrian one, according to the baseline survey conducted by Omio Kumar Das Institute of Social Change and Development, Guwahati, 43% of the total rural population in the district belongs to Muslims but the share of the community in the work force is only 37% which indicates that 73% of the Muslims are without any work. Further the share of female workers in the total rural female population in Bongaigaon District is 21% while the same for Muslims is only 10%. Therefore the discrepancy in work participation is more pronounced for rural Muslim women in the district. It indicates in the baseline survey that 66% of the total land holding in the districts are less than one hectare which shows that most of the farmers have land holdings sizes less than marginal class size. With the increase population rate of 24.77% among the Muslim population, land becoming scare to cover more crop areas for agriculture production because land could not be expanded horizontally; rather it is depleting day-by-day for various purposes other than agriculture. Moreover, the yield of the most of the hybrid crops is saturated to their optimum point beyond which it’s production may not be possible to increase. Therefore, among the allied sector Animal Husbandry especially Dairying is the most promising proposition next to agriculture which could absorb the unemployed and underemployed people of this vast Muslim work force of the rural areas.

122

In National scenario the Indian Dairy Industry acquires a substantial growth which has not only placed the Dairy Industry first in the World but also represents sustained growth in availability of Milk and Milk products for the burgeoning population of the country. Most importantly, dairying has become an important secondary source of income for millions of rural families and has assumed the most important role in providing employment and income, giving money 2 times a day. Therefore by improving the dairy sector in Bongaigaon district would create self employment for a large number of Muslim rural masses including women participation in this sector with dignity like in the advance States of Gujrat, Hariyana, Panjab etc. where most of the Dairy Husbandry work is done by the women folk only.

3. CRITICAL GAP : 3.1. Critical Gap in Production: Table-22. Present & Projected Milk Production with shortfall of requirement during 11th five year plan in Bongaigaon District. Sl No

Particulars

2007-08

2008-09

2009-10

2010-11

1

Human population

963649

978971

994536

1010350

2

Indigenous Cattle(00Nos)

329822

333450

337118

340826

3

Milk Production (000 ltr)

18787

19350

19931

20529

4

Cross bred Cattle

13164

13584

14020

14468

5

Milk Production (000 ltr)

6284

6472

6667

6867

6

Buffalo

5918

5853

5789

5727

7

Buffalo Milk(000 ltr)

3619

3579

3539

3501

8

Total Milk Production(0000ltr)

2996

3086

3179

3274

9

Requirement @ 208ml/h/day(000ltr)

73237

74401

75584

76786

10

Yearly shortfall (000 ltr)

43277

43541

43794

44046

11

Daily shortfall (ltr)

118567

119290

119983

120673

Source: A.H. & Vety Deptt., Govt. of Assam, Chenikuthi, Guwahati.

Table-22.1. Per Capita Availability of Milk Sl No

Particulars

2007-08

2008-09

2009-10

2010-11

1

Without M.S.D. Plan

85 gms

86 gms

87 gms

89 gms

2

With M.S.D. Plan

----

88 gms

91 gms

94 gms

3.2. Critical Gap in Organized Production: In Bongaigaon district per capita availability of milk is only 85 gms which is per below the requirement of 208 gms recommended by the Indian Council of Medical Research (ICMR). This unavailability of milk in turn results capital out flow in the tune of Crores of rupees annually

123

for import of milk and milk products from out side the state. In Assam, and in that case in Bongaigaon district also a large section of rural population consisting of small and marginal farmers and Agricultural labourers, are traditionally cattle rearers but their cattles are of nondescriptive breed, temporarily dry, barren, feeble and hence low productive. The farmers do not have the adequate facilities or resources for either proper rearing or improving these animals. In fact their approach of such rearing is very casual. For organize production of the milk at the village level, Primary Dairy Cooperative Society is an indispensable organization. But in Bongaigaon District there is not a signal milk producers Cooperative Society is functioning or existing as on today. Therefore much has to be done to organize the disperse farmers under the umbrella of D.C.S.s.

Table-22.2. Processing Requirement in the District: Sl No

Particulars

1

Daily production M.S.D. Plan

2

Assuming 70% of this milk goes to household & unorganized consumption, rest 30% milk could be tapped for organized processing and quality marketing.

without

3

At present processing plant

4

Proposed plant under M.S.D.

2007-08

2008-09

2009-10

2010-11

82,082.0 lts

84,548.0 lts

87,096.0 lts

89,699.0 lts

24,625.0 lts.

25,364.0 lts.

26,129.0 lts.

26,910.0 lts.

Nil 2000 LPD

3.4. Critical Gap in Organized production and Marketing: At present there is no milk processing plant in the district . With present production as stated in the above table a minimum of 5000 LPH plant is required. Due to paucity of fund only 2000 LPD plan is proposed in M.S.D. Plan which is urgently required to boost up the initiative of the farmers for more production. Whatever little milk is produced in the district, marketed by the unorganized sector comprising

mainly

innumerable

middlemen, vendors,

small processors and retailers of

indigenous milk products like Khowa, Paneer, Dahi and milk based sweets etc. But the main problem in unorganized sector is quality which creates threats to the health of the consumers. Unsanitary local condition, unhygienic containers, sub-standard processing equipment, poor handling methods, breaks in cold chain etc. leads to poor quality and unsafe milk supplied by the unorganized sector . Therefore, to fill up this critical gap in production, processing & marketing in dairy sector a huge resource is necessary; however a concerted effort is made through this M.S.D. plant with limited fund at least to start the opening of the Dairy Industry in the district.

124

4. GOAL AND STRATEGIES: 4.1. Goal: 1)

At the end of this project an additional milk production of 4800 ltrs. per day will be achieved along with the normal production of milk which will increase the per capita availability of milk from present 85 gms to 94 gms.

2)

The project will create the milk procurement network through organization of primary Dairy Cooperative Societies.

3)

At the end of the project milk processing capacity of 10000 ltrs. per day will be achieved.

4)

There will be a marketing network created under the patronized of the processing plan.

5)

Deliverance of quality milk to the door step of urban consumers who are presently exploited by the middle man.

4.2. Strategies: 1.

Formation of 8 numbers of Primary Dairy Cooperative Societies in a cluster basis at potential minority concentrated villages in the line of “Milk Village” scheme of the Department.

2.

Impart management training along with exposure visit to successful Dairy Cooperative Societies within and outside the state.

3.

Managerial and other infrastructural assistance to the Dairy Cooperative Societies for their successful running.

4.

Creation of procurement Network.

5.

Induction of Cross Bred Cows/ Improve buffaloes to the societies through credit linkage.

6.

Creation of processing infrastructure at Abhayapuri town along with marketing facilities.

5. OUT COME AND BENEFIT: Milk production

:

Additional increase of 4800 ltrs. of per day along with normal production

House hold directly benefited

:

240 Nos.

Population served

:

48076 (through processing plant)

In addition to this there would be indirect employment in the field of support services like supply of medicine and vaccine, concentrated feed and fodder, retail marketing of milk and

125

milk product besides in the field of providing transportation facilities for the above activities by private entrepreneurs.

6. MILESTONE: i)

To increase per capita milk availability from present 85 gms to 94 gms.

ii)

To create employment opportunities and thus improving the economic status of rural minority population including women folk.

iii)

The farmers will be organized under of Dairy Cooperatives Societies (DCS) for better production management.

iv)

In time these Primary Dairy Co-operative Societies will form the district level union who will subsequently manage the entire activities after the project completion.

v)

A corpus fund will be created among the Primary Co-operative Societies for running the district level Union.

vi)

In the Primary Dairy Cooperative Societies supports services like collection centre, milk testing facilities will be created.

vii)

Milk produced by the farmers will be collected and tested in the rural milk collection centre and payment will be made according to fat & SNF content of milk. The collected milk will be transported from rural milk collection centre to the dairy plant.

viii)

The procurement, processing and distribution of milk would be organized in order to give remunerative price to the farmers as well as providing hygienic milk to the consumers through elimination of middlemen who are at present exploiting the farmers on one hand and selling adulterated milk through unhygienic reconstitution of solids coming from out side the state.

ix)

The milk processing plant will be run by the proposed milk union or through the interested N.G.O’s or private parties under Public Private Partnership (PPP Model) by drawing suitable Memorandum of Understanding (MOU) among the Dairy Department and the Party concerned.

x)

Milk will be processed in the Dairy Plant as per the norms laid down by MMPO/WTO and will be marketed through the modern selling booths.

xi)

All the beneficiaries will be imparted training programme and selected beneficiaries will be sent for exposure visit to the other parts of the country. This is crucial for standardization of milk production as per standard laid down by the new trade agreement under WTO.

126

7. APPROXIMATE COST OF THE PROJECT: 1) For organization of D.C.S. ………………

Rs.16.51 Lakhs

2) Support for milk production……………..

Rs.150.0 Lakhs

3) Support for Milk processing ……………….

Rs 58.49 Lakhs

Less 50% of cost of animals which is under the beneficiary and bank loan as per funding

Rs.225.0 Lakhs (-) Rs. 75.0 Lakhs

pattern 10: 40 through NABARD’s Total Project Cost

Rs.150.0 Lakhs

Venture Capital Fund Scheme. 8. YEAR WISE PHYSICAL AND FINANCIAL TARGET: Rs. in lakh

Sl No. A.

B.

C.

Name of the Schemes For organization of D.C.S. 1. No of formation of Dairy Cooperative Societies. 2. No of beneficiary assisted 3. Cost of formation and awareness camp @ Rs. 0.025 lakh 4. Training to the beneficiary @ Rs. 0.15 /training 5. Establishment of Milk collection centre at Society level (One time Grant) @ 1.00 lakh/ each. 6. Managerial assistance to the societies @ Rs. 0.18 lakhs/ each. 7. Exposure visit within the state (inter district) @ Rs. 0.20 Lakhs/ DCS of 30 nos per group 8. Cost of milk testing equipment ( Electronic Milk Tester – 300 LPD) @ Rs. 0.35 each . 9. Cost of Milk can (40 Lts Capacity) @ Rs. 0.04 Lac/ each ( 4 Nos to Each DCS) Sub Total A Support for milk production 10. Animal induction @ Rs.0.625 lakh/ beneficiary consisting of 2 animals / beneficiary. Support for Milk processing 13. Milk processing plant of 2000 LPD capacity( Total Cost 58.49 Lakhs) Total

Less 50% of cost of animals which is under the Beneficiary and bank loan as per funding pattern 10: 40

Grand Total

2008-09

2009-10

2010-11

Total

3

3

2

8

90 0.075

90 0.075

60 0.05

240 0.20

0.45

0.45

0.30

1.20

3.00

3.00

2.00

8.00

0.54

0.54

0.36

1.44

0.60

0.60

0.40

1.60

1.05

1.05

0.70

2.80

0.48

0.48

0.32

4.8

6.195

6.195

4.12

16.51

56.25

56.25

37.50

150.00

20.27

37.76

0.46

58.49

82.715

100.205

42.08

225.00

(-) 28.125

(-) 28.125

(-)18.75

(-)75.00

54.59

72.08

23.33

150.00

127

9. LOCATION FOR FORMATION OF DAIRY COOPERATIVE SOCIETIES AND INTENDED BENEFICIARIES : The dairy cooperative societies will be organized in cluster basis in the line of “Milk village scheme” of the department in the potential areas of 5 development blocks of Bongaigaon District in the Minority concentrated areas where natural calamities mainly flood would not occur.

10. AVAILABILITY OF LAND FOR THE PROCESSING PLANT: Sufficient Govt. land is available at Abhayapuri town from where only 1 bighas will be required for establishment of the processing plant . This land could be easily available as consented by District Administration, Bongaigaon .

11. DURATION OF THE PROJECT: The project will be implemented during the financial year 2008-09 to 2010-2011.

12. IMPLEMENTING AGENCIES : Dairy Development, Goalpara, Govt. of Assam, underwhose jurisdiction the district falls will implement the project through formation of a Project Implementing Committee (PIC) headed by Deputy Commissioner, Bongaigaon.

13. MANAGEMENT AND OPERATION OF PROCESSING PLANT: After commissioning of the plant it’s operation will be handed over to the proposed milk union which is to be formed in the district by the Primary Dairy Cooperative Societies or to some N.G.O’s or Private Party under Private Public Partnership (P.P.P Model) by suitably drawing a Memorandum of Understanding (MOU) among the Dairy Development Department and the party concerned.

128

ANNEXURE-I DETAIL SCHEMES A. Awareness camp & formation of Dairy Cooperative Societies: i)

Printing of banner, leaflet etc. ( L/S)………………….

Rs.

500.00

ii)

Higher charges of sound system for general meeting (L/S)………

Rs

250.00

iii)

Tea, snacks and other items for refreshment of the beneficiaries in the general meeting (L/S)……………..

iv)

v)

Rs. 1,000.00

Purchase of set of Registers and other stationary articles for the society (L/S)……………………………………………....

Rs.

500.00

Printing of photographs of general meeting………………

Rs.

250.00

Total unit cost of awareness and formation of Dairy Cooperative Societies:

Rs.2,500.00

Rupees two thousand five hundred only

B. Unit cost of Beneficiary training programme: i)

Inaugural expenditure (Cost of banner, photographs, sounds system etc. (L/S) ……………………………………………..

ii)

Cost of breakfast @ Rs.10 /person/ day ( 5days x 30x 10)……………………………………………

iii)

Rs. 1500.00

Cost of lunch @ Rs. 50/person/ day (5x50x 35)………………………………………………….

iv)

Rs. 1,000.00

Rs. 8750.00

Cost of refreshment @Rs. 5/person/ day ( 5x35x5)………………………………………………..

Rs.

v)

Honourium to resource person Rs.250x10 …………………

Rs. 2500.00

vi)

Cost of Stationary (Register copy, pen, pencil etc.)……………………………

Rs.

875.00

375.00

Total unit cost of training programme of Dairy Cooperative Societies

Rs. 15000.00 Rupees fifteen thousand only.

C. Managerial Assistance to the Societies: i)

Managerial subsidy ( purchase of cash book, contingency expenditure to partially meet the sales related expenditure)……

Rs.

2500.00

ii)

Cost of office furniture …………………………………………….

Rs. 14000.00

iii)

Purchase of utensils and other necessary equipments …………….

Rs.

1500.00

Total unit cost of Managerial Assistance of Dairy Cooperative Societies

Rs. 18,000.00

129

D. Scheme for exposure visit: i) ii) ii)

Higher charges of bus from Dhubri to Chitajakshala Society, Jagiroad (to and fro) @ Rs. 5000/-(single fare)………. D.A charges of 30 beneficiary for two days @ Rs.100/day….. Night holding charges of 30 beneficiaries (L/S) ………. Total unit cost of exposure visit of Dairy Cooperative Societies

Rs.10,000.00 Rs. 6000.00 Rs. 4000.00 Rs. 20,000.00

E. Scheme for induction of milch animals: i)

Cost of 2 nos of lactating animals yielding mim 10 lts of milk preferably with female culf at heel @ Rs. 25000/- animal ………………………………………… Rs.50,000.00 ii) Improvement of cowshed and provision of water (L/S) ……….. Rs. 6000.00 iii) Insurance premium @ Rs. 6% ………………………………….. Rs. 3000.00 iv) Transportation cost @ Rs. 500/cow……………………………. Rs. 1000.00 Working Capital for 15 days: v) Concentrates feed @ 3 Kgs / cow @ Rs. 10/ Kg (3.0 x10.00 x 2x 15 days)………………………………….. Rs. 900.00 vi) Green fodder @ Rs. 20 Kg/ cow @ Rs. 0.50 / Kg (20x 0.50x2x 15.00)……………………………………….. Rs. 300.00 vii) Dry fodder @ Rs. 5Kg/ cow @ Rs. 1.00/ Kg (5x1.00x2x15)……………………………………………… Rs. 150.00 viii) Medicine and vaccination (L/S)………………………… Rs. 500.00 ix) Utensils and others articles (L/S) ………………………. Rs. 500.00 x) Contingency expenditure ………………………………. Rs. 150.00 Total unit cost of induction of milk animals of Dairy Cooperative Societies Rs. 62,500.00 Rupees sixty two thousand five hundred only

F. Scheme for construction of collection centre cum society office: 1.

Plinth area =3.00 mtr x 4.75mtr = 14.25 sqm. CIVIL WORKS:- ( As per APWD SOR 2004-05) @Rs.5990.00/sqm…………………………………….. a) For normal preparation of site @1% of the total civil cost ………………… b) For internal water supply 5% of the cost of civil works ………………… c) For internal electrification 11% of the cost of civil works ………………… Grand total Say Rupees (One lakh) only

130

Rs. 85357.00 Rs.

854.00

Rs. 4268.00 Rs. 9389.00 Rs.99868.00 Rs.1,00,000.00

ANNEXURE-II SUPPLY, INSTALLATION AND COMMISSIONING OF 2000LPH MILK PROCESSING PLANT AT ABHAYAPURI, BONGAIGAON Sl No Items of Work A. Civil works 1 a. Construction of Assam Type Milk Processing Plant of size 12.60m x

Rate

Qty

9.40m=118.44 sqm as per plinth area rate of APWD SOR 2004-05

B. 1

10082.4 118.44 b. Construction of brick boundary wall as per departmental 3328.6 70.00 approved rate of Rs.3328.60/Rm of wall with Iron gate. c. Installation of water supply arrangement with 100mm dia bore well, pump house with pump, water stagging and L.S 1 distribution of pipe line etc complete d. Installation of 63.5 KVA transformer substation with HT & LT line. 400000 1 Sub Total Machinery and Equipments Milk reception

Amount

1194159 233002

200000 400000 2027161

i

Cream Separator

99880

1

99880

ii

Can tipping bar

2950

1

2950

iii

Weigh scale 0-300KG platform type

52700

1

52700

iv

Dump tank

36000

1

36000

v

Milk transfer pump

26500

1

26500

2

Processing and packaging

i

Milk pasteurizer- Micro-therm-MK-II 500LPH

540000

1

540000

ii

Milk storage tank-2000L- SS outer

325000

1

325000

iii

Milk transfer pump

35100

1

35100

iv

Intermediate tank

38500

1

38500

v

Pouch filling machine-2500 PPH mechanical

325000

1

325000

vi

Deep fridge 500 Ltr. Cap with Stabilizer

35000

1

35000

3

Utilities

i

Refrigeration section 2000LPD

625000

1

625000

ii

Hot water generator 30000K Cal/Kg

275000

1

275000

4

Piping and electrical item

i

SS piping material

148000

1

148000

ii

MS/GI piping material+Hardware

75000

1

75000

iii

Insulated materials

62500

1

62500

iv

MCC Panel + Electrical MS structural Materials

95000 36500

1

95000

v

1

36500

5

Other Accessories

i

DG set 40KVA

438000

1 Total

438000 3271630

Packaging and forwarding @2%

65433

CST 4%

130865

Freight & Insurance

185829

Installation and commissioning

122000 3775756 5802918 Rs. 5,80,300.00

Sub Total Grand Total (A+B) Rupees five lakhs eighty thousand three hundred only.

131

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR INDUSTRIES AND COMMERCE

PROJECT COST – RS. 0.579 CRORE 2007-08 To 2011-12

132

CONCEPT PAPER 1. Background: Bongaigaon district is one of the important minority concentrated district of Assam. The Socio- economic and basic amenities parameters of the district are below national average. It is also a relatively backward district of Assam. As per the census data of 2001, the demographic profile of the district shows that 45.08 percent of the rural population in the district belongs to the minority community of which Muslims comprise 94 percent. The population distribution by religious minority groups in the rural areas is shown in the table below. Religious distribution of rural population in Bongaigaon district (as per census, 2001) Total Muslims Christian Sikhs Buddhists Jains Others Not Minority stated 1 2 3 4 5 6 7 8 358372 339712 18010 113 147 56 8 326 (45.08) (42.73) (2.27) (0.01) (0.02) (0.01) (0.001) (0.04) Religious group wise work participation rate reveal that although Hindus comprise 55% of the total rural population in the district, 60% of the total rural workers in the district are Hindus. On the contrary, although 43% of the total rural population in the district belongs to Muslims, the share of the community in the work force is only 37% which indicates that 73% of the Muslims are without any work. Percentage of workers by religious groups in total rural workers Religion Hindu Muslim Christian Total Rural

Cultivators 26 16 2 44

Agricultural Workers 10 9 1 20

Household Other Total Industry workers workers 2 21 60 1 11 37 0.1 1 3 3 33 100 Source: Census of India, 2001.

Further disaggregated figures on gender based work participation rate indicate that female work participation rate is one third of the rate of males in the district. The differences are more pronounced in the urban areas where the female work participation rate is only 8% compared to 51% for males.

133

2. SOCIO ECONOMIC FEASIBILITY WITH JUSTIFICATION: The common people particularly the Minority Community of Bongaigaon District is economically very backward although there is tremendous potential for gainful self employment through entrepreneurial activities in the handicraft sector. There exists sufficient raw material for Agro based and allied activities based on which a good number of Micro Enterprises may be created by the unemployed youths. For example jute is abundantly grown in Bongaigaon District and a large number of quality items can be produced from Jute fibre which possess good market in India and abroad. For this purpose the youth folk of the District should get proper entrepreneurship training at suitable and affordable location with congenial atmosphere. Hence creation of suitable training hall one at Bongaigaon and another at Abhayapuri sub division and arrangement of entrepreneurship Dev Trainings on Jute Diversified products are felt feasible & justified for the District. 3. CRITICAL GAP: In spite of having sufficient raw materials & man power, Bongaigaon District is lagging behind in respect of Entrepreneurial activities compared to other parts of the country. The main reason is that the District possesses poor Industrial Infrastructure and the common people are ignorant about the potentiality of creating Micro Enterprises based on local raw material. There is not a single suitable training hall in the District where long term Entrepreneurship Development Training program can be arranged. However, this gap of infrastructure and Entrepreneurial Knowledge can be reduced to some extent by creating some Training Halls and arranging long term training programs at those halls. 4. GOAL AND STRATEGIES: Construction of Entrepreneurship Dev. Training Hall at Bongaigaon and Abhayapuri Sub Division and arrangement of three months Training program (batch wise) on Jute craft in the Centres for at least 500 youths from minority community of the District will encourage a section of local people to create micro enterprises. 5. OUTCOME AND BENEFIT: The common people particularly the economically backward minority people will get opportunity to have sufficient entrepreneurship Development Training with all-round practical knowledge at suitable location of affordable distance. This will encourage at

134

least a section of the people to establish micro enterprises/ cottage industry based on Jute fibre and this will certainly uplift their socio economic status. 6. MILESTONE: After completion of project, the EDTHs will be assets of the District & will be used for the same useful purpose for creating entrepreneurs of different ventures. Moreover, the micro enterprises that may be created by some Trainees after completion of their training will be the pioneer units for the District. 7. APPROXIMATE COST: The approximate cost of the project is Rs. 57,99,700/- (Rupees Fifty Seven Lakhs Ninety Nine Thousand & Seven Hundred) only. 8. YEARWISE PHYSICAL & FINANCIAL TARGET: Year 2008-2009 & 2009-2010 2010-2011 & 2011-2012

Physical Target Financial Target Construction of EDTH with arrangement of Rs. 30,09700/furniture. Completion of training program on jute craft Rs. 27,90,000/(10 no batches)

9. PRIVATE INVESTMENT PARTICIPATION: No private participation required. 10. PROJECT LOCATION: The proposed locations are: a) Industrial Estate, new Bongaigaon under Bongaigaon Sub Division. b) Commercial Esate, Rowmari, Abhayapuri under North Salmara Sub Division. 11. LAND AVAILABILITY: There are sufficient land available at the locations mentioned above for construction of EDTHs. 12. INTENDED BENEFICIARIES: Educated unemployed youths particularly from the minority areas will be benefited from the project. 13. DURATION OF PROJECT: The project will be completed within 3 years.

135

14. IMPLEMENTING AGENCY: The implementing agency will be District Industries Commerce Centre Bongaigaon. For successful completion of training programme, National Centre for Jute Diversification, Guwahati and NGOs/ Master craftsmen from Bongaigon and neighbouring Districts will be involved. 15. EXISTING AND PROPOSED MECHANISM FOR IMPLEMENTATION: DICC, Bongaigaon possesses experienced mechanism for construction of infrastructure as well as for arranging Training in the field of entrepreneurship Development. 16.MANAGEMENT/ OPERATION AND MAINTENANCE OF ASSESTS CREATED:

The management/ operation and maintenance of assets created will be as follows: 1) For Entrepreneurship Development Training Hall at Industrial Estate, New Bongaigaon - General Manager, DICC Bongaigaon. 2) For Entrepreneurship Development Training Hall at Rowmari, Abhayapuri– Asstt. Director of Industries & Commerce, Abhayapuri, North Salmara Sub Divn. 17. PROJECT AT A GLANCE : PHASE I : Construction of 2 ( two) nos “ Entrepreneurship Development Training Halls”- one in bongaigaon sub division and the other in North salmara sub division. Estimated Cost:-

Rs. 30,09,700/-

PHASE II : Arrangement of training programmes on

jute craft/ jute diversified

products for the unemployed youths of minority community of the district with an objective of employment generation. Estimated Cost:-

Rs. 27,90,000/_______________________ Total Estimated Amount:Rs. 57,99,700/(Rupees Fifty Seven Lakh Ninety Nine Thousand & Seven Hundred )Only

136

DETAILS OF PROJECT: PHASE I: CONSTRUCTION OF ENTREPRENEURSHIP DEVELOPMENT TRAINING HALLS DICC, Bongaigaon proposes to set up 2(two) Entrepreneurship Development Training Halls at the following locations: i) Industrial Estate, New Bongaigaon under Bongaigaon sub division. ii) Commercial Estate, Rowmari, Abhayapuri under North Salmara Sub Division.

It is observed that some Training Institutes connected with the development of Industrial activities like – IIE, NEITCo, NEDFi, MSME, NSIC, DICC, National Centre for Jute Diversification etc. arrange training programmes time to time for awareness and entrepreneurship development for the minorities and other backward classes of the district. But due to lack of proper infrastructure they have to face various difficulties for arranging the progremmes smoothly. Therefore,

DICC,

Bongaigaon

proposes

to

construct

2(two)

nos.

of

Entrepreneurship Development Training Halls accomodating at least 50 nos. of Entrepreneurs in each Hall. For construction of the Halls we have identified suitable vacant Government land in the I/E, New Bongaigaon under the control of MD, AIIDC Guwahati, Assam and in Commercial Estate at Rowmari

(earmarked for S/C

Community earlier) under the Control of Director, Industries & Commerce, Assam falls under North Salmara Sub Division. The vacant land at Rowmari is lying unused since inception for last about 25 years which is under control of the Director, Industries & Commerce, Assam. THE EDTHs AT A GLANCE: a) Type of Building

: Assam type building with steel roof truss.

b) Total Plinth area of each EDTH

:

160.7 Sqm

:

Rs. 13,95,350.00

d) Cost of furniture for each EDTH

:

Rs.

e) Total Cost of each EDTH

:

Rs. 15,04,850.00

f) Total cost of the two EDTH

:

Rs.

c) Estimated cost of building for each EDTH (including electrification)

1,09,500.00

30,09,700.00

(Rupees Thirty Lacs Nine Thousand Seven Hundred only

137

PHASE II:

TRAINING PROGRAMME ON JUTE CRAFT/ JUTE DIVERSIFIED PRODUCTS FOR THE UNEMPLOYED YOUTHS OF MINORITY COMMUNITIES OF THE DISTRICT:

a) INTRODUCTION: Jute is an important agricultural product which is abundantly produced in Bongaigaon District. A large numbers of household as well as industrial products can be made using raw or processed jute fibre. Jute diversified products are nice to look at and very useful for day to day use in modern societies and as such these have good demand in our country and abroad. These products also possess good exporting potential. With the recent global trend towards eco-friendly products, jute has regained its importance in global market and thus throwing a tremendous potential for diversified jute products. A large number of jute based quality products can be made in the handicraft sector using minor tools & equipments. Traditionally our artisans produce verities of jute products. If they get proper training & technological support they will be able to produce wide range of quality jute products. Jute fibre craft is encouraged by various Agencies like Development Commissioner of Handicraft under Ministry of Textile & Handloom, Govt. of India, National centre of Jute Diversification, Artfed etc. Another vital point is that no huge amount of money is required to start up jute based venture by the artisans. In view of these, DICC, Bongaigaon proposes to arrange long term Training Programmes on Jute Craft/ Jute Diversified Products for the Minority Communities of the District.

b) SOME JUTE BASED PRODUCTS: 1. Decorated Hand Bag.

2. Marketing Bag.

3. Wall hanging

4. Dinning Mat

5. Door Mat

6. Cushion Cover

7 Pen Stand

8. Chappal

9. Hat/Cap

10 Carpet etc.

c) OBJECTIVE OF THE TRAINING PROGRAMME: 1. To impart training for general awareness as well as skill development for the youths under Minority areas. 2. To provide gainful employment opportunity to the youth folk. 3. To grasp the benefit that have accrued under various programme on jute. 4. To introduce technical know how. 5. To encourage to set up micro units by the Entrepreneurs. 6. To provide backup and marketing support.

138

d) TRAINER ORGANISATIONS: Besides National Centre for Jute Diversification, local experienced Master craftsmen/ NGOs involved in training programme will be engaged for imparting training. e) POST TRAINING ACTIVITIES: 1. Trainees will be encouraged to setup micro units based on jute fibre. 2. They will be sponsored under Govt. Scheme for getting financial assistance if possible. 3. They will be encouraged to form Self

Help Group/ Cooperative Societies in

consultation & guidance of DRDA, Bongaigaon . 4. Steps will be taken for participating in trade fairs & Exhibitions organized by different Agencies etc.

PHASE III : PROPOSED ESTIMATE FOR 3 MONTHS TRAINING PROGRAMME ON JUTE CRAFT. ( No. of participants per batch - 50 Nos.) Sl No. Item 1. Printing & Stationery

Amount required per batch Rs. 5000/-

2.

Raw Material consumption @ Rs. 200/- each

Rs.

10000/-

3.

Accommodation & T.A. for Master Craftsmen/ NGO

Rs.

30000/-

4.

Honorarium to Master Craftsmen/NGO @ Rs. 9000/-/ Month each for 2 Nos. Master Craftsmen

Rs.

54000/-

5.

Documentation Report along with CD/ Video etc.

Rs.

10000/-

6.

Refreshment etc.

Rs.

60000/-

7.

Tool Kits / Raw materials to the trainees after completion of training programme @ Rs. 500/-

Rs.

25000/-

8.

Stipend to the trainees @ Rs. 500/- per month/ trainee

Rs.

75000/-

9.

Misc. expenditure

Rs.

10000/-

Total Total Cost of Training for organizing 10 Nos. of batches

Rs. 279000/Rs. 27,90,000/-

(Rupees Twenty Seven Lakh Ninety Thousand) Only

139

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

SOCIAL FORESTRY

PROJECT COST– Rs. 0.457 CRORE 2007-08 To 2011-12

140

CONCEPT PAPER 1. SOCIO ECONOMIC FEASIBILITY WITH JUSTIFICATION : The Bongaigaon District has about 45.08% of minority population of which Muslims constitute 42.7% of the total. The remaining communities namely Sikh 0.01%, Christians 2.27%, Buddhists 0.02%, Jains 0.01%, and others 0.001%. The agriculture is the main occupation of the 80% of the rural population. It is the predominant economic activities of the district. Paddy is the major crop covering 75% of the total cropped area. The forest cover of the district is very low. As per National Forest Policy 1/3rd of the total geographical area should be under forest but the district has only 6659 ha of forest land (5.54% of total geographical area). Obviously the district has very low output on forest produce such as fuel, fodder, timber, fibre and non-timber forest produce. Fuel decades back the paddy field of the district has adequate no. of trees as alley crop. The species like Simul, Ajhar, Bel, Paroli, Bhatghila etc. which contributed immensely for maintaining ecological balance and agricultural productivity. The trees provide subsidiary income to farmer during crop failure due to flood/drought etc. There exists a critical gap on the above requirement of rural population, hence it is proposed to narrow the gap by taking up the Social Forestry scheme with the following components. 1. 2. 3.

4. 5. 6.

FarmForestry/Agroforestry 120 ha Medicinal and Aromatic Plantation- 68 ha Nursery:- i) MAP Nursery (0.5ha each 2nos.) 1.00 ha ii) Forest Nursery 0.5 ha. Income Generating Activities :Providing bee hives to farmers 150 nos. Community Welfare :Providing Bio Gas Plant 27nos. Awareness/Training of farmers on bee hives MAP cultivation/Nursery

= Rs 5.00 Lakh = Rs. 26.00 Lakh = Rs. 5.00 Lakh = Rs. 2.00 Lakh = Rs. 1.50 Lakh = Rs. 5.00 Lakh = Rs. 1.25 Lakh Total = Rs. 45.75 Lakh

2. GOAL & STRATEGIES : (1) Considering the agrarian background of the district the above components of the scheme as it integrates trees and animals with the main objectives of reducing risk and increasing productivity per unit area. The farmer of the district is ready to adopt the model which is technically feasible ecologically sustainable, economically viable and socially acceptable.

141

(2)

It will provide source for rural, village and cottage scale industries and to build up resources for fuel, fodder, timber, floss, Herbal/Ayurvedic medicine.

(3)

To create employment of casual and semi permanent employment for creation, upkeep, protection, harvesting and recreation, restoring much needed ecological balance which is at stress due to global warming vis-a-vis pollution.

(4)

To demonstrate the people about the growth and yield rate of different species of trees/MAP and help in selection and identification of the species required for his own private land planting for different micro-climatic and adapting conditions.

3. STRATEGIES: To implement the scheme the following measures will be taken up (1)

Awareness programme/training/demonstration would be carried out in selected sites of project area.

(2)

(i) Planting material would be made available at project cost in five nurseries to be set up at different places.

clu

(ii) Each year one forest Nursery will be set up at central place to meet the requirement of planting materials for Agro forestry. (3)

Fertilizers, Bio-formulations are proposed from the project.

(4)

In regard to cultivation cost-characterization would be provided from project.

4. TECHNICAL DETAILS OF THE PROJECT : Activities

Vetiver

Patchouli

Tree Crop

Crop duration Growing season

15-16 months October/NovFeb/March

5-5 ½ months Oct/Nov.-May

8-10 years March/June

Production of planting materials

Root slips to be made available by end September

Rooted cuttings to be made available in bulk by October/November

Available in bulk by March-June

Planting in the field

October/November utilizing residual moisture.

Oct/Feb

March-June

Area identification and To be completed by Organising Farmers Sept. Training

To be completed by Sept.

Nov.-Dec.

Setting up nurseries

0.13 ha×5 mother plants to be planted by Feb/ March setting up nursery 75% shade net house with a capacity of 1 lakh seedling/batch.

1ha nursery for raising tree species.

0.13ha×5 area with intensive cultivation practice- April/ May.

142

For safe distribution of seedling to the farmers plastic crates may be used. 200 such crates will be sufficient to handle about 15,000 seedlings/truck. A.

Farm forestry: 120 ha = 24 ha in each Anchalik Panchayat for demonstration (Plantation along boundary) 150 plants per ha

B.

Advance work =

Rs. 1600/- per ha.

Creation =

Rs. 1500/- per ha.

Maintenance =

Rs. 1066/- per ha.

Total =

Rs. 4,166/- per ha. Rs. 5,00,000.00

Cultivation of Medicinal & Aromatic Plants in individual house holds on cluster basis 165 ha in 5 Blocks.

C.

(a) Agaru & Sandal wood

16 ha

@ Rs. 31,250.00

Rs. 5,00,000.00

(b) Patchauli -

20 ha

@ Rs. 50, 000.00

Rs. 10,00,000.00

(c) Vetiver -

20 ha

@ Rs. 25,000.00

Rs. 5,00,000.00

(d) Sarpagadha -

10 ha

@ Rs. 20,000.00

Rs. 2,00,000.00

(e) Amlakhi, Bohera, Hilikha - 13 ha

@ Rs. 30,770.00

Rs. 4,00,000.00

Apiary (Income Generating Activities) Providing Bee hives to individual beneficiaries 3 nos. in each village ( with extractor) for 50 Villages = 150 nos. @ Rs. 1000/- each

D.

Rs. 1,50,000.00

Bio- Gas Plant (Community welfare) Bio-gas for cooking and Bio-manure 1 nos. in each village for 27 villages 27 nos.

E.

@ Rs. 18,000/- each

Rs. 5,00,000.00

@ Rs. 2.50 lacs each

Rs. 5,00,000.00

Medicinal & Aromatic Nursery 2 nos. (0.63 ha each) in 2 Blocks

F.

Forestry Nursery Forestry Nursery 1no. @ Rs. 2.00 lacs

G.

Rs. 2,00,000.00

Awareness/Training of farmers on bee- keeping/ MAP cultivation/ Nursery etc

Rs. 1,25,000.00 TOTAL = Rs. 45,75,000.00

(Rupees Forty five lacs seventy five thousand) only.

143

TABLE: 23. YEAR WISE SCHEMES / ALLOCATION UNDER MULTISECTORAL DEVELOPMENT PLAN FOR MINORITY 2007-08 to 2011-12 Approved wage rate @ Rs. 77/SL. No.

1. 2.

Item of Work

Year wise Physical & Finance Target/Outlay Breackup Creation work Maintanance Rate in 2008-09 2009-10 2010-11 2011-12 TOTAL Rs. Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

Farm Forestry/ Agro Forestry Medicinal/

4100/-

120 2.90 120 0.70

120 0.70 120 0.70 120 5.00

Aromatic cultvn

3.

4.

5.

6.

Agaru/Sandal 31,250/- 16 3.92 Patchauli 50,000/- 20 7.00 Vetiver 50,000/- 20 3.50 Sapagandha 20,000/- 10 1.25 Amlakhi, Bahera, Hilikha 30,770/- 13 2.56 Nursery (i) MAP Nursery 2,50,000/- 2nos. 5.00 (ii) Forestry Nursery 2,00,000/- 1no. 2.00 Income Generating Bee-hives 1000/- 150 1.50 Community Welfare Bio-Gas plant

18000/-

27 5.00 nos.

Awareness/ Training of farmers on beekeeping/MAP cultivation/ Nursery etc. 1,25,000/- 1no. 1.25

Total

--

--

16 0.36 20 1.00 20 0.50 10 0.25

16 20 20 10

0.36 1.00 0.50 0.25

16 20 20 10

0.36 1.00 0.50 0.25

16 5.00 20 10.00 20 5.00 10 2.00

13

13

0.48

13

0.48

13

0.48

4.00 5.00 2.00

-

-

-

-

-

-

1.50

-

-

-

-

-

-

27 5.00 nos.

-

-

-

-

-

-

1no. 1.25

3.29

-

3.29

35.88 -

144

3.29

-

- 45.75

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR TERRITORIAL FOREST

PROJECT COST- Rs. 0.335 CRORE 2007-08 To 2011-12

145

CONCEPT PAPER 1. EXECUTIVE SUMMARY : Bongaigaon District is one of the backward District of Assam. There are 160 nos. of G.P’s under 5 nos. of Development block out of which 23 nos. of G.Ps are Minority dominated . The

proposed Multi- Sector Development plan has been prepared ,

keeping with a view to give future economic boost to each of the minority family dwelling in those areas and to create good nos. of mandays for their lively hoods. 1.1. Nursery (1.0 hector) 5 nos. has been proposed for each of the Development Block. Each good

Nursery will produce Total= 2.70 laks seedling of good quality ( Which have

commercial values). Species for Nursery will be Sissoo , ( Dalbargia Sissoo) ,Gomari

(Gmelina arborea),Teak ( Tecktoona grandis ) and Tita Chopa ( Michelia Champaka) Which are

fast

growing

in

this region and good commercial values.These seedlings

will be

distributed in free cost to the minority families. 1.2. Orientation camp (23 nos.) has been proposed for each 23 nos of G.P to motivate the people. 1.3. Bamboo Nursery(5 nos.) has been proposed for 5 nos of Development Block. 1.4. How tree planting will give boost to the Village economy - One Gomari /Sissoo tree will produce minimum 8-12 cft timber in a span of 15-20 years and will fatch minimum Rupees 5,000-7,000 in present market value. One Teak / Tita Chopa tree will produce minimum 7-12 cft timber in a span of 20-25

years

and

So, if each

will

fetch minimum Rupees 10,000-15,000 in market present value.

house hold can plant and nourish minimum 5-10 nos tree of above

mentioned species in their own pattaland then each house hold can earn at least Rs.50,0001,00,000 after 15-20 years which will give boost to village economy. 1.5. Importance of Bamboo Nursery- Bamboo cultivation / product can be back bone of economy for entire North-East State . Bamboo products are now replacing steel , wood, roofing and even plywood. Govt of India minority small scale

areas starts

is lunching National bamboo Mission . If

producing bamboo then through National Bamboo Mission many

village Industries can be come up in minority areas . Bamboo cultivation can

boom the entire socio – economic development. So, 5 nos. bamboo nurseries have been proposed for 5 nos. of Development Block.

146

ACTION PLAN Table- 24. Year wise Physical & Financial Target/ outlay Break up Approved wages rate @ Rs.77/Sl No

Item of work

Rs. in Lakh Total

Creation work Rate/ 2008-09. Ha. Phy Fin

Maintenance ( as per norms) 2009-10. 2010-11 2011-12 Phy

Fin

Phy

Fin

Phy

Fin

Phy

Fin

1

Nursery ( 1.00Ha)

5.0

5 Ha.

4.41

5 Ha.

2.93

Nil

Nil

Nil

Nil

5Ha.

25.0

2

Orientation Bamboo Nursery

1.52

23 nos 5 nos

3.50

Nil

Nil

Nil

Nil

Nil

Nil

3.50

4.05

5 nos

0.95

Nil

Nil

Nil

Nil

23 nos 5 nos

3

1.0

Rupees thirty three lakh fifty thousands only

5.00 33.50

GRAND TOTAL=

2. NORMS FOR 1.0 HECTOR NURSERY : Norms has been prepared as per Department and Wages has been fixed as per NREGA norms.

Total nos of seedling to be produce at the 1st year : Polypot 1.70 lakhs, Naked seedling 1.00 lakhs , Total seedling : 2.70 lakhs .

2.1. 1st year creation and maintenance : Sl no.

Item of works

1

Site Selection

2

Fencing H.G.P & B/W 540 RM @ Rs.50/RM 300 bed making for 1.0 lakhs stumpets Seed collection / purchase Cowdang & manure Seed Sawing Cost of P/bag & preparation (1,70,000.00) Watering 300 beds Weeding 300 beds Weeding , Watering etc. Polypots Camphut Construction Tube well/ Ring Well Cost of Tools,Signboard Inspection Path Cattle watching & fencing repairing etc.

3 4 5 6 7 8 9 10 11 12 13 14 15

Wage Components Mandays Amount @ Rs. 77.00 8 616.00

Materials

Total

-

616.00

100

7700.00

27,000.00

34,700.00

300

23,100.00

-

23,100.00

150 45 168 2000

30,000.00 10,000.00 68,587.00

39,900.00 13,465.00 12,936.00 2,22,587.00

100 100 100

9,900.00 3,465 12,936.00 1,54,000.0 0 7700.00 7700.00 7700.00

-

7700.00 7700.00 7700.00

80 40 4 60 380

6160.00 3080.00 308.00 4620.00 29260.00

12,000.00 10,000.00 2683.00 4000.00

18,000.00 13,080.00 2991.00 4620.00 23,260.00

Grand Total =Rs. 4,41,355.00 ( Rupees four lakhs forty one thousands three hundreds fifty five )only. N.B: Cost of production per seedling in an average ( polypot and naked ) is Rs.1.63

147

2.2. 2nd year creation & maintenance : Excluding Item No.1,2,11,13,14 from 1st year maintenance

Total = Rs.58,645 .00

3. NORMS FOR ORIENTATION / AWARENESS / MOTIVATION CAMP. 1.

Duration of camp=1 days

2.

Numbers of participants: 100 nos per day

3.

Cost of chair for 100 nos participants for 1 days @ Rs.15/-

4.

=

Rs.

1,500.00

=

Rs. 12,000.00

=

Rs.

Cost of food for per day per participants for 2 days Breakfast

Rs. 15/-

Lunch

Rs. 90/-

Afternoon tea

Rs. 15/-

Total

Rs.120/-

5. Misc Camping cost

L.S.

Total=

1700.00

Rs. 15,200.00

( Rupees fifteen thousands two hundred ) only

4. NORMS FOR BAMBOO NURSERY : 4.1. 1st year creation and maintenance 1.

No of seedling to be produced = 15,000 nos of polypot seedling

2.

Cost of production for 15,000 nos of polypot

=

Rs. 81,000.00

(Cost of Bamboo seedling Rs. 5.40 / per seedling)

4.2. 2nd year maintenance @ Rs.19,000/-

= ( Rupees one lakh ) only

148

Rs 19,000.00 Rs.1,00,000.00

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR INDUSTRIAL TRAINING INSTITUTE

PROJECT COST – Rs. 1.00 CRORE 2007-08 To 2011-12

CONCEPT PAPER 1. PRESENT STRENGTH OF ITI : I.T.I. Bongaigaon is one of the oldest I.T.I. of Assam. It is established in 1960. presently we are imparting training in the following long term trades (courses) with respective seats capacity mentioned against the name of trades. Sl. No.

Trades.

Unit.

One year

Two year

Total

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Cutting & Sewing COPA Hair & Skin Care Stenography(English) Welder D.M.C. M.M.C.P. Fitter Electrician Motor Mech. Vehicle Mech. Diesel Turner Wireman I.T. & E.S.M

1 1 1 1 2 1 1 2 2 2 1 2 2 1

16 16 16 16 12 x 2 = 24 16 -

16 16 16 x 2 = 32 16 x 2 = 32 16 x 2 = 32 12 x 2 = 24 16 x 2 =32 16

16 16 16 16 24 16 16 32 32 32 16 24 32 16

Total

104

200

304

In addition to the above long term trades (courses), it also imparting training in the following short term courses under Modular Employable Scheme(MES) . 1.

Fabrication (Arc Welding)

2.

Cutting & Sewing.

3.

D.T.P.

4.

Beautician

5.

Plumber

6.

House Wiring

7.

Repairing of home appliances.

Under the Multisectoral Development plan we want to introduce the following new trades/2nd units and continuation of the above short term courses.

150

A. NEW TRADES 1. Mech. Motor Vehicle. 2. Electrician. 3. Carpenter.

B. 2ND UNITS 1. Plumber 2. I.T.& E.S.M. 3. Mech. Diesel

C. SHORT TERM COURSES 1. House wiring 2. Computer Hardware 3. D.T.P 4. Repair of Home Appliance 5. Beautician 6. Cutting and Sewing For the above development works we shall be need the infrastructure as per Plane & Estimate are following. 1. Civil works 2. Tools and Equipments 3. Furniture 4. Training Materials 5. Remuneration to the Staff ( Teaching and Non Teaching / Trade Expert ) 6. Stipends for the Trainees . For creation of the above infrastructure, year wise schematic provisions are reflected below:

Table – 25. SL.NO. 1.

ITEMS

1ST YEAR

Civil works ( Theory & Practica 70.00 Lacs

2ND YEAR

3RD YEAR

TOTAL

--

--

70.00 Lacs

building 2.

Tools & Equipments

10.00 Lacs

--

--

10.00 Lacs

3.

Furniture

2.00 Lacs

--

--

2.00 Lacs

4

Remuneration

3.00 Lacs

3.00 Lacs

3.00 Lacs

9.00 Lacs

5

Training Materials

2.00 Lacs

2.00 Lacs

2.00 Lacs

6.00 Lacs

6

Stipends

1.00 Lacs

1.00 Lacs

1.00 Lacs

3.00 Lacs

Total

88.00 Lacs

151

6.00 Lacs

6.00 Lacs 100.00 Lacs

152

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR EMPLOYMENT

PROJECT COST – Rs. 0.168 CRORE 2007-08 To 2011-12 152

CONCEPT PAPER 1. INTRODUCTION: It is a fact that among all the problems/ constrains in the country, unemployment is a major problem and which becomes a bottleneck for the upliftment of the society as a whole. It is also noted that a huge nos. of educated unemployed youths (job seekers) form minority communities are registered at Employment Exchange, Bongaigaon. The number of educated unemployed youths registered at Employment Exchange, Bongaigaon are in such figures – Muslim Community

Christian Community

Sikh Community

14774

354

58

However total nos. of job seekers registered for employment assistance: Male

Female

Total

56776

10942

67718

The above stated figures of educated unemployed youths from minority communities are available on Live Register of the Employment Exchange, Bongaigaon till 30th June, 2008. The present employment generating scenario in the District is very poor. Also it is not possible for government to provide government service to all these job seekers and due to lack of proper employment & guidance activities these youth may become frustrated day by day and their minds may be diverted towards some unlawful activities. The only way to solve this burning unemployment problem among minority communities is to create efficient man power by way of organizing career counseling and guidance programmes for the student; imparting some needful trainings to the unemployed youth on different self employment ventures and also to keep them alert and prepare for different competitive examination. As these youths are the future of the society, hence in need base they may be taken up under Multisectoral development plan for minorities. In this regard, different literatures on careers and occupational information’s may be prepared & printed locally based on the literatures received from the Directorate General of Employment & Training, New Delhi & Directorate of Employment & Craftsmen Training, Assam and make arrangement for distribution of the same at the time of career counseling & vocational guidance programmes which are proposed to be conducted by Employment Exchange. Bongaigaon at different Schools & Colleges of areas having substantial minority population.

153

Moreover, total population of Bongaigaon district (2001)is as such: Residence

Persons

Hindu

Muslims

Christians

Total

904835

535464

348573

18728

Urban

109782

98783

8861

718

Rural

795053

436681

339712

18010 Source: Census of India 2001

From the above table of population distribution, it is observed that majority of the minority populations generally lives in various rural remote corners of the district. Hence, eligible unemployed youths may not often register their names at Employment Exchange for some employment assistance due to their ignorance about the function and existence of Employment Exchange. Therefore, there is a need to register their names by way of mobile camp registration programmes at different remote minority dominated corners of the district to be conducted by Employment Exchange Bongaigaon. So, based on the above concept a Multisectoral Development Plan for minorities with a Detail Project Report is prepared by the Employment Exchange, Bongaigaon with the following aims & objectives.

2. AIMS & OBJECTIVES OF THE PLAN : 1. To create efficient manpower by providing better career and occupational information’s among the students and job seekers of the minority communities. 2. To generate employment by way of imparting some needful trainings to the educated unemployed youths of minority communities on different self employment avenues. 3. To disseminate some important career literatures in the schools & colleges of the area having substantial minority populations. 4. To cover all the eligible unemployed youths of the minority communities located at remote places of the district to get their names registered at Employment Exchange, Bongaigaon for their employment assistance.

3. MSD PLAN CONTAINS: 3.1. Socio-economic feasibility with justification : In present day era awareness in any field is an important factor for its acceptance or rejection. Also besides formal education in the students community specially in the relatively disadvantaged segments of minority community there is tremendous need of career & occupational information and availability of needful training programmes meant for the student as will as job seekers of this community which will definitely guiding the minority communities for their socio-economic upliftment. Hence, reasons quoted in the introductory part of this plan are having higher degree of Socio-economic feasibility with proper justification for its acceptance.

154

3.2. Critical gap:Population pattern of this district shows that majority of the minority communities are generally lives in rural areas. Hence, they are normally ignorant about the availability of different employment/Self employment opportunities prevailing in the district. So, there is a critical gap. Therefore, this MSD plan is proposed to minimize this gap among all the communities of this district by improving the socio-economic parameters of minority communities. 3.3. Goal and strategies:The main goal of this plan is to create efficient manpower in the minority communities and to achieve this goal strategies are to be taken up by organizing career counseling & guidance programmes for students; imparting trainings on self employment avenues to the unemployed youths and keep them alert and prepare for different competitive examinations. 3.4. Outcome and benefit:After implementation of the proposed project a resultant outcome and benefit will be emerged with more nos. of objective oriented students from the minority communities so as to enable them to choose better career and occupational options. Another outcome & benefit of this project is to bring about attitudinal change among wise boy’s & girls and set themselves the aim of self employment rather than paid employment. 3.5. Milestone :A reckoning point is set to fulfill all the aims and objectives of the plan quoted in the introductory part of this plan. 3. 6. Approximate cost of project:Approximate cost of project is about Rs. 0.168 Cr. Details of cost is shown in Detail Project Report of the plan. 3.7. Year wise physical & financial target:Year wise physical & financial target proposed in this project is shown in Annexure I, II, III, & IV respectively. Physical target per year

Financial target per year

a) Career counseling & V.G. Programme : 12 nos

Rs. 2,40,000/ (Two lacs forty thousand) only

b) Printing of career literatures / guide books :

Rs. 1,00000/ (One lac) only

2000 nos c) Mobile camp registration programme : 12 nos.

Rs. 1,20,000/ (One lac twenty thousand) only

d) Training programme: 2 no’s.

Rs. 1,00000/ (One lac) only

155

3. 8. Private investment if any:In the proposed project no private investment will be involved. 3.9. Project location:At different existing schools & colleges of the areas having substantial minority populations. 3.10. Land availability :The project is proposed to be conducted at already existing schools & colleges of the minority dominated areas. 3. 11. Intended beneficiaries :Students and educated unemployed youths / job seekers of the minority communities are the intended beneficiaries. 3.12. Duration of the project :The proposed project is meant for a period from 2008-2011. 3.13. Implementing agency :District Employment Exchange is the implementing agency of the proposed project. 3. 14.Existing & proposed mechanism for implementation :It is proposed that for conducting the programmes additional resource persons/ experts will be invited from the concerned fields 3.15. Management / operation and maintenance of assets created.:All the career literatures / guide books etc proposed to be printed and distributed at the different schools & colleges will be maintained by the respective school / college authority.

4. DETAILS PROJECT REPORT OF MSD PLAN: A detail project Report (DPRI) is prepared in connection with Multisectoral Development Plan for Minority Communities to be implemented by Employment Exchange, Bongaigaon. DPR is mainly proposed for the benefits of the students as well as unemployed youths of the minority community of Bongaigaon District for their better career and occupational options as well as some self employment ventures. The whole DPR is mainly divided into four sectors: A)

Career counseling and vocational guidance at different schools & Colleges of the areas having substantial minority population.

156

B)

Printing of career literatures, pamphlets etc. & distribution of the same to different schools, colleges & Libraries located at minority areas of the district.

C)

Mobile Camp Registration Programme at remote places of Minority areas of the District.

D)

Organize Training Programmes for educated unemployed youths of minority communities on different self employment ventures/avenues.

A.

Career Counseling and Vocational Guidance Programmes at different schools and colleges of minority areas of the district. Altogether 12 nos. of such programme are proposed per year and estimated cost for one

programme is amounting to Rs. 20,000/- (Twenty thousands) only. Particulars/items to be required for the said programmes is as per the following manner. ANNEXURE – I Sl. No. 1. 2. 3. 4.

Particulars

Qnty.

Banner For wide publicity Guest remuneration Light refreshment for candidates Vehicle with fuel Mike set etc. File cover note pad, pen Paper & other contingency Miscellaneous TOTAL -

5. 6. 7. 8.

Estimated cost for one year

:

Estimated cost for 3 year

:

Rate

5 nos. -

Rs. 500.00 -

200 nos.

Rs. 20/-

-

-

Amount Rs. Rs. Rs. Rs.

2,500.00 2,000.00 2,000.00 4,000.00

Rs. 2,500.00 Rs. 1,000.00 Rs. 4,000.00

-

Rs. 2,000.00 Rs. 20,000.00 (Rupees twenty thousands) only.

12 x Rs . 20,000.00 3 x Rs. 2,40, 000.00

= Rs. 2, 40, 000.00 = Rs. 7, 20, 000.00

(Seven Lacs twenty thousands) only. B.

Printing of career literatures, pump lets, leaflets etc. & distribution of the same to different schools, colleges & libraries of the minority areas of the district : In this sector three types of career literatures are to be prepared & printed locally by

Employment Exchange, Bongaigaon in sufficient quantities based on the literatures received from the Directorate of Employment & Craftsman Training Assam & arrangement to be made for distribution of the same at the time of career counseling and vocational guidance programmes.

157

ANNEXURE-II a) Jibika Nirdeshana ; No. of copies to be prepared & printed = Amount required per copy = Total cost involved = = b) Career Information for Students: Amount required per copy Total cost involved

2000 (two thousands) Rs. 50.00 2000 x 50.00 Rs. 1,00 000.00 (Rupees one lac) only.

= Rs. 50.00 = Rs. 2000 x 50.00. = Rs.1,00000.00 (Rupees one lac) only. c) Career Options & Occupational Information : No. of copies to be prepared & printed = 2000 (two thousands) Amount required per copy = Rs. 50.00 Total cost involved = 2000 x 50.00 = Rs. 1,00000.00(Rupees one lac) only. Hence, a + b + c = 3 lacs only. C. Mobile Camp Registration Programme : Mobile Camp Registration Programmes are to be carried out at different remote corners of the minority areas of the district so as to enable the eligible unemployed minority youths to get their name registered at Employment Exchange, Bongaigaon for employment assistance at their locality. Altogether 12 nos. of such programmes are proposed in one year and estimated cost for one programme is about Rs. 10,000/- (ten thousands) only. Particulars/items to be required for the said programme is as per the following. ANNEXURE: III Sl. No.

Particulars

Qnty.

Rate

1. 2. 3. 4. 5. 6.

Banner Publicity Vehicle with fuel Light refreshment For Candidates Contingencies for stationeries etc. Printing of X-I form & X-10(B) Identity card Miscellaneous

3 nos. 150 nos. -

Rs. 500.00 Rs. 10/-

-

-

7.

Amount Rs. Rs. Rs. Rs. Rs. Rs.

1,500.00 1,000.00 2,500.00 1,500.00 1,500.00 1,000.00

Rs. 1,000.00 Total - Rs. 10,000.00 (Rupees ten thousands) only.

Estimated cost per year

:

12 x Rs. 10,000.00 = Rs. 1,20,000.00 (One lac twenty thousand) only.

Estimated cost per 3 year

:

3 x Rs. 1,20,000.00 = Rs. 3,60,000.00 (Three Lacs sixty thousands) only.

158

D.

Organize training programmes for educated unemployed youths of communities on different self employment ventures:-

Minority

There is a steady growth of unemployment persons who desire to have paid jobs. Since there are limited opportunities for such jobs, the unemployment problem is poising a serious threat not only the government but to the young people also. Wise boys and girls will have to bring about attitudinal change and set for themselves the aim of self employment rather than paid employment. The central and state govt.’s have realized the importance of self employment & are trying to offer as many facilities as possible. Banks and Industries development corporation are coming forward with loan on easy terms. Training programmes may be organized on several self employment ventures depending on feasibility and viability of the programme at their locality. An indicative list of self employment avenues : 1. Workshop for 2/3 wheeler vehicle. 11. Barber’s shop 2. Bee keeping 12. Black smithy 3. Bakery & Confectionary items. 13. Beauty Parlor/Centre 4. Building materials sale 14. Dry cleaning 5. Door to Door breakfast service. 15. Envelope making 6. Book binding. 16. Fruit vegetable vendor 7. Footwear shop and repairs 17. Fruit juice shop 8. Fisheries 18. Floor mill & Masala grinding. 9. Piggery 19. Dry Cleaning/Dying 10. Fashion Tailoring 20. Readymade garment making etc. It is proposed that two numbers of small training programme on different self employment avenues are to be carried out per year. ANNEXURE: IV Year

No of programme

1st year

02

Rs. 50,000/- x 2 = Rs 1 lac

2nd year

02

Rs. 50,000/- x 2 = Rs 1 lac

3rd year

02

Rs. 50,000/- x 2 = Rs 1 lac

Total

06

Rs.150,000/- x 2 = Rs 3 lacs

GRAND TOTAL (A + B + C + D)

Estimated cost

= Rs.( 7.2 + 3.0 + 3.6 + 3.0) Lakh = Rs.16.80 Lakh

(Rupees sixteen lacs eighty thousands) only.

159

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR SOCIAL WELFARE

PROJECT COST – Rs. 1.00 CRORE 2007-08 To 2011-12

160

CONCEPT PAPER 1.

RELIGION SPECIFIC SOCIO-ECONOMIC FEASIBILTY : The various socio economic indicators are i) Literacy rate ; ii) Female literacy rate ; iii) Work participation rate ; and iv) Female work participation rate The literacy rate in the district as per the Census, 2001 is lower than the state average.

Although the female literacy rate in the urban areas of the district is same as that of the state average for urban female, however in the rural areas the female literacy rate is much lower than the state average which clearly shows the poor educational status for women . Religious community wise literacy rates in the district reveals that literacy rate for Hindus is not only highest among the religious groups of the district but is also significantly higher than the district average rural literacy rate. The literacy rate of Muslims is much below the average rural literacy rate of the district particularly the Muslim female literacy rate in the rural areas. The main reason for educational backwardness of the Muslims are poverty, for which they are forced to drop out after the first few classes. This is particularly true for Muslim girls. Muslim children are force to work at a very early age . Parents are unable to bear the cost of sending their children to schools.

2. GOAL & STRATEGIES : Goal : Development plans for minority concentration in Bongaigaon district under Social Welfare Sector of Integrated Child Development Services Scheme .

Strategies : The programme of ICDS envisages the delivery of the following package of services : Non-formal pre-school education Supplementary Nutrition Immunization Health Check-up Referral Services Nutrition & health education To improve the health and relevant knowledge for adolescent girls ( 11-18 yrs) .

3. OUTCOME AND BENEFIT : 3.1. Objectives of Non-formal Pre-School Education : Pre-school education at the Anganwadi should aim at the total development of the child– physical , psychological , moral , social and the development of language and intelligence. The

161

following are the main objectives of pre-school education : i

To develop in the child a good physique, proper muscular coordination and motor skills .

ii

To develop its creativity and imagination , initiative and curiosity .

iii

To develop attitude of social responsibility and desirable relationships ; to help the child to learn to live with other children and to respect the rights of others .

iv

To control the child’s natural aggressiveness and destructiveness ; to channelize spontaneous energies to good behaviour and work; and to inculcate human values like concern for others, sharing, cooperation with others , patience , tolerance , fairness, truthfulness, integrity , modesty , courage and equanimity .

v

To help the child to grow intellectually and emotionally , acquire the ability for expressions in its own language , recognize and name the objects in its environment , recall and compare events and objects , and form clear concepts of things and events around itself.

vi

To encourage the child to learn to work and play independently and to be able to accept help and guidance from adults.

vii

To develop good habits of health and hygiene.

Thus pre-school education plays an important role in the total development of the child’s personality. Therefore devote proper attention to this important component of the ICDS Programme.

3.2. Materials and Equipments : The materials and equipments to be used in the Anganwadi for non-formal pre-school activities should be of indigeneous origin , designed and made by the anganwadi workers or local artisans , and inexpensive . Dependency upon non-indigenous play equipments should be minimized and emphasis should be on the improvisation of materials from local resources . Anganwadi workers should play a leading role in the designing and making of these materials. Materials like sand , clay , seeds , leaves , twigs , water etc have immense possibilities. Slides , sandpits, resting frames, crayon and brush drawings and paintings, paper cuttings, beads etc . have been found to be more popular with pre-school children than sophisticated dolls , toys and other equipments . The traditional festival dolls and folk toys have a great deal of educational possibilities but have largely remained untapped so far . Similarly picture books are of great interest and importance to young children. They develop reading interests in children and facilitate their language development.

3.3. To improve the health and relevant knowledge for adolescent girls (11-18 yrs) : i

Improve decision making capabilities.

162

ii

Enhance literacy and mathematical skills.

iii

Improve/upgrade home-based and vocational skill.

iv

Gain awareness of health , hygiene , nutrition , and family welfare , home management , and child care.

v

Understand the consequences of marriage before 18 yrs.

vi

Understand environment related social issues and the impact on adolescent girls lives.

vii Initiate various activities to be productive and useful women of society. Groups of adolescent girls have been formed with each groups consisting of 20 adolescent girls.

4. MILESTONE : Anganwadi Centre : No. of Anganwadi Centre (AWC) covered by Minorities:316 Nos. To develop the pre-school education in the minority area supply of pre-school material & equipment to the Anganwadi Centres is necessary . Adolescent Girls : At present in the Bongaigaon district we are having 805 Nos. of Adolescent Groups in minority areas. During the recent survey we have found out that there are around 204 Adolescent Groups still uncovered. In order to make them self employed as well as self dependent, strengthening as women workforce of society we have proposed to distribute sewing machines, knitting machines & beautician kits among these Groups.

5. APPROXIMATE COST OF THE PROJECT : (1)

Supply of Anganwadi material & equipments : As per our recent survey: Total no. of Anganwadi Centre (AWC ), ( Covered ) ------316 Nos. For pre-school education necessary materials cum equipments are not available in Anganwadi centre .

Estimated costs of supply of materials & equipment for the development of Pre-School Education in the AWC’s

= Rs. ( 316 x 5481/- )

= Rs. 17,31,996/-

(2) Estimated cost for distributing sewing machines, knitting machines & beautician kits etc. to Adolescent Groups : According to recent survey , Total no. of Adolescent Groups already formed under 316 No. Minority AWC = 805 Nos

No. of Proposed Adolescent Groups in Minority Area Total No. of Adolescent Groups = 805 + 204 = 1009 Nos.

163

=

204 Nos.

(a) Cost of Sewing Machine & other accessories to be distributed to 689 Adolescent Groups @ Rs. 8,000/- per group.

------------------- = 689 x 8,000 = Rs. 55,12,000/-

(b) Cost of Knitting Machine & other accessories to be distributed to 300 Adolescent Groups @ Rs. 8,000/- per group.

----------------- = 300 x 8,000 = Rs. 24,00,000/-

( c) Cost of Beautician Kits & other accessories to be distributed to 20 Adolescent Groups @ Rs. 8,000/- per group.

------------------------------ = 20 x 8000 = Rs. 1,60,000/-

____________________________________________________________________ TOTAL = Rs. 80,72,000/-

TOTAL ESTIMATED COSTS FOR THE ABOVE (a) Supply of Anganwadi materials & equipments : Rs.17,31,996/(b) Distribution of sewing & knitting machine & beautician kits : Rs. 80,72,000/________________________________________________________________________ TOTAL Rs. 98,03,996.00 Administrative Costs 2 % = Rs. 1,96,079.92 GROSS TOTAL = Rs. 100,00,075.92

Table-25. Year wise schemes/allocation under Multi Sectoral Development Plan for Minorities ( 2007-08 to 2011-12 ) Year

Schemes & amount proposed

Expect ed time of compl etion 3

Minority Population Muslim

Category Christi Sikh an 4

Areas to be Covered

Bud dhist

Oth ers

Implementi ng Agency

1

2

5

6

09-10

35,00,000

2010 March

3,91,400

1487

---

-----

---

5 No. ICDS Project ( Dev. Block ) Under Bongaigaon District

D.S.W.O. Bongaigaon

10-11

35,00,000

2011 March

3,91,400

1487

---

-----

---

5 No. ICDS Project ( Dev. Block ) Under Bongaigaon District

D.S.W.O. Bongaigaon

11-12

30,00,000

2012 March

3,91,400

1487

---

-----

---

5 No. ICDS Project ( Dev. Block ) Under Bongaigaon District

D.S.W.O. Bongaigaon

CONCLUSION : The above report is submitted during the year 2008-2009 . But its implementation and full functionality will start after the proposed funds are received . Therefore we propose to implement the project for the years : 2009-2010 , 2010-2011 and 2011-2012 .

164

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR CHAR DEVELOPMENT

PROJECT COST – Rs. 0.24 CRORE 2007-08 To 2011-12

165

CONCEPT PAPER 1. INTRODUCTION : Pancharatna Char Development Project, Goalpara was established in the year 1989 under the “Assam State Char Areas Development Authority” and it was brought under a full-fledged “Directorate of Char Areas Development Assam” located at Dispur Guwahati- 6. At present this Directorate is under the “Welfare of Minority & Development Department” (WMD)Assam. The main aim of this project is to lunch and implement various developmental schemes for the upliftment of the poor people living in the char areas of the river Brahmaputra as’ Special Area Programme’. This project covers char villages of Goalpara and Bongaigaon district. A brief notes on this project( Bongaigaon district portion ) is furnished below:-. 1.

District

:

Bongaigaon

2.

Sub-division

:

North Salmara

3.

Name of Dev. Block

:

a) Tapattary, b) Srijangram c) Boitamari

4.

No. of Gaon Panchayat

:

23

5.

No. of char- Chapori villages

:

117

6.

Total population ( As per Socio-

of Char Areas of Assam)

:

1,34,809 ( Male -70,345 Female- 65,464)

7.

P.C. of minority

:

99% – 100 % (Muslim)

8.

Nos of LAC

:

2 ( Abhayapuri North, Abhayapuri South )

9.

Char village / Population

:

Economic Survey Report 2002-2003

Block

Nos.of G.P

Nos of Char Villages

Population

1.

Boitamari

7

26

22,716

2.

Tapattary

7

39

55,265

3.

Srijangram

9

52

57,828

23

117

1,35,809

Total

2. SCHEME PROPOSED:2.1. Income generating scheme:i) 5H.P.- L.L.P. Socio-Economic feasibility with justification:-

166

All the char villages of Bongaigaon district are located in the remote isolated char areas of the river Brahmaputra. The people are very poor and literacy rate is much below the district rate and deprived of other basic amenities like proper education, health, sanitation etc. This is due to poor road connectivity and degradation by yearly flood and erosion. Most of the people depend on agriculture. They mainly grows rabi crops as the kharif is only a chance crop. As a result a major portion of the people migrated to other places in search of livelihood. Over the years, they are using traditional method of cultivation by bullock driven country plough. Hence, a consorted afford should be made to increase the productivity of field crop by using improved method of cultivation. All the char villages are minority concentrated area having 99%- 100% muslim.

3. CRITICAL GAP :This proposed scheme will promote the local infrastructure as well as in income generation.

4. GOAL AND STRATEGIES:Main goal of this scheme are to create long felt infrastructure for sheltering livestock during flood and increasing crop productivity for upliftment of socio-economic condition of the Muslim minority living in the char villages.

5. OUTCOME AND BENEFIT:The project is an investment activity on which money is spent for the development of locality and benefit of the people. Here, benefit is aimed at the relatively disadvantage segment of Muslim community residing in char-chapori villages.

6. MILESTONE:Proposed schemes expected to act as a milestone for the upliftment for socio-economic condition of minority community of the char villages.

7. APPROXIMATE COST OF PROJECT:Component wise :- 5 H.P. Low Lift Pump :

Rs. 24.0 Lacs.

8. YEAR WISE PHYSICAL AND FINANCIAL TARGET:Enclosed in Annexure- I(A) to Annexure-I(E)

9. PROJECT LOCATION:Detailed project location is mentioned in Annexure -I(A) to Annexure-I(E).

10. LAND AVAILABILITY:Land will be available if required.

167

11. INTENDED BENEFICIARIES :Intended beneficiaries will be the minority Muslim living in the char villages where these scheme are being proposed for implementation.

12. DURATION OF THE PROJECT:11th Five Year Plan will be the duration of the project and each component will be completed year wise in schedule time subject to the availability of fund.

13. IMPLEMENTING AGENCY:Project Officer, Pancharatna Char Development Project, Goalpara.

14. EXISTING & PROPOSED MECHANISM FOR IMPLEMENTATION:Pancharatan Char Development Project has a full-fledged office with godown facility located in the road side at Nayapara, Goalpara near The State Bank of India, Goalpara branch. 15.MANAGEMENT/OPERATION AND MAINTENANCE OF THE ASSETS CREATED:Assets created through this project will be managed and maintained by the beneficiaries of that locality as these will be for the benefit of themselves..

ANNEXURE: I (A) Year :2007-08 Scheme 5 H.P. L.L.P

Location

Target

Block

G.P

Village

Tapattary

N.Satra B.Khaity Mererchar Balarchar Majeralga(E)

Bharalipara-I

5

1.40 Lakhs

Kushbari Balarchar-II Bhutkura

5 5 5

1.40 Lakhs 1.40 Lakhs 1.40 Lakhs

Srijangram Boitamari

Phy

Grand Total

Financial

Rs.5.60 Lakhs

ANNEXURE: I (B) Year :2008-2009 Scheme 5 H.P. L.L.P

Location

Target

Block

GP

Village

Phy.

Tapattary

Lengtichinga

Jarpara-II

5

1.40 Lakhs

Srijangram

Numbarpara Chakla Kakoijana Jogighopa

Numbarpara-I Balajani Namakera

5 5 5

1.40 Lakhs 1.40 Lakhs 1.40 Lakhs

Boitamari

Grand Total

168

Financial

Rs.5.60 Lakhs

ANNEXURE: I (C) Year :2009 -2010 Scheme 5 H.P. L.L.P

Location Block Tapattary Srijangram Boitamari

G.P Dumerguri Kokila Kabaitari Balapara

Village Dumerguri Kokila-I Mohanpur Hakoidoba Grand Total

Target Phy Financial 5 1.40 Lakhs 5 1.40 Lakhs 5 1.40 Lakhs 5 1.40 Lakhs 20 Rs.5.60 Lakhs

ANNEXURE: I (D) Year : 2010 -2011 Scheme 5 H.P. L.L.P

Location Block Tapattary Srijangram Boitamari

G.P Borjana Kacharipety Oudubi

Village Arimara Tupkarchar Kachudola Grand Total

Target Phy Financial 5 1.40 Lakhs 5 1.40 Lakhs 5 1.40 Lakhs 15 Rs.4.20 Lakhs

ANNEXURE: I (E) Year :2011 -2012 Scheme 5 H.P. L.L.P

Location Block Tapattary

G.P Malegarh

Village NO 6 char

Target Phy Financial 4 1.08 Lakhs

Srijangram Boitamari

Golapara Majeralga(E)

Golapara-III Gerapur Grand Total

4 3 11

169

1.08 Lakhs 0.84 Lakhs Rs.3.00 Lakhs

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR BONGAIGAON MUNICIPALITY

PROJECT COST – Rs. 2.5 CRORE 2007-08 To 2011-12

170

CONCEPT PAPER 1. AREA AND LOCATION : Bongaigaon District was created in 1989 curving out the Goalpara and Kokrajhar Districts and surrounded by Barpeta in the east, Goalpara in the south-east, Kokrajhar in the west and Dhubri in the north west. Bongaigaon Town is the District Head Quarter of the District.

2. INTRODUCTION: Bongaigaon is situated at an average altitude of 62.6 m with the cardinal points 26028” east latitude and 90034” north longitude. The town is situated at a distance of 200 km west from the State Capital and occupies an important place in the communication network in Assam as well as north east India. The New Bongaigaon railway station is a major junction connecting Assam with rest of India. This town is also very well connected by road through the National Highway 31 B and 31C. This connectivity and the strategic location of the town in the regional set up has helped it to emerge as an important center in trade and commerce in Western Assam serving a vast hinter land. Bongaigaon represents a cultural mosaic as it was under the rule of various of ethnic groups at different points of time. Out of the all rulers the ‘Koch’ ruled this area for a few centuries and Kamata King Narnarayan and his brother Generalissimo Bir Chilaray was famous of them. It came under British rule 1826. The town occupied a place in the map of Indian Railway with the establishment of the railway station in the year 1908. Most of the institutions like ITI, Bongaigaon College, Office of the Assam State Electricity Board in the early 60’s and infact the very base of the development of the town was laid in this decade only. The development further gained momentum with the establishment of the Bongaigaon Refinery and Petro Chemicals Limited (BRPL) Complex in the year 1972 at Dhaligaon and also Thermal Power Plant at Salakati. Though these area are not within the limit of Bongaigaon Municipality the town also caters to the demand of this population. The Bongaigaon Town Committee was first constituted in the year 1961 and was upgraded to a Municipal Board in the year 1977. Presently the Municipal Area consists of 25 nos. of wards covering an area of 14.31 sq m.

3. SOCIO-ECONOMIC FEASIBILITY WITH JUSTIFICATION: Bongaigaon Town is cosmopolitan in nature. Socio economic feasibility for adoption of sectoral development plan for the Bongaigaon Town can be well justified if 171

we look in to the table below stating the religion wise population of the town. Table - 26. Religionwise Population . Hindu

Muslim Christian

Sikh

Budhist

Jain

54946

3860

317

329

117

747

0.53%

0.55%

0.19%

1.24%

91.07% 6.40%

Others/ not stated 11 0.02%

Total Population = 60327 The data regarding religion wise population is available at town level only and the same at ward level is not presently available. A glance at the religion wise population states that the Muslims constitute 6.40% of total minority population which the highest and the Budhist constitute the lowest percentage which is 0.19%. The concentration of population of religious minority had to be determined through reconnaissance survey and with the help of concentration of holdings. The survey reveals that the pockets in the town where the minority population is concentrated are not well knit with the infrastructure network of the town and hence requires a special attention to bring the standard of the infrastructure at par the standard of the town.

4. CRITICAL GAP : There are total 25 nos. of ward in Bongaigaon Municipal area and out of these the as per survey carried out religious minority are concentrated at the ward nos. 6, 8, 9, 10, 12 and 13. The town basically lacks in the infrastructure sector and in most of the localities, roads are in dilapidated conditions. Further in the rainy season, in the absence of proper drainage facilities, the situation worsens. This has made the communication to and fro from this area difficult and in absence of drainage facilities the area gets submerged during a heavy shower damaging public properties. Further there is no such community places in these areas which can be expeditiously used by the communities for their overall development. Accordingly the analysis carried out on the existing infrastructure facilities for the minority sector reveals the critical gap in the following two major sectors1. Basic infrastructure facility namely roads and drains 2. Community places like hostels and guest houses

5. GOALS AND STRATEGIES : The strategy now will be to put resources in minimizing these critical gap in a planned way. On the basis of the above analysis following goals have been identified for this sectoral development plan for the town 1. To provide with roads along with side drains in Kadamtoli Area (ward no. 12) 2. To provide with roads along with side drains Gurunanak Nagar (ward no. 13)

172

3. To provide with modern guest house for minority communities. 4.

To provide with youth hostels for minority students.

.6. OUTCOMES AND BENEFITS :

It is proposed that by achieving these goals the critical gap that exists presently can be fulfilled and the communities should be able reap the benefits of the overall development of the town. Further this will go in a long way to raise the living standards communities. Once the schemes are implemented the communication as well as the drainage of the area will be improved. The people as well as the students commuting to and fro from the town will be able use the facilities.

7. MILE STONE : Table-26.1. Year wise mile stone Year

Ist Year

2 nd Year

3 rd year

4 th year

Mile stones

Roads & drains

Roads & drains

Roads & drains

Roads & drains

30%

70%

85%

100%

Buildings

Buildings

Buildings

Buildings 100%

progress 30%

progress 70%

progress 85%

8. APPROXIMATE COST OF THE PROJECT : The name of the schemes along with the approximate cost is as given below. The total cost of the project is Rs. 250.00 lakhs Sl

Name of Scheme

Quantity

Cost Rs. in lakh

1

Improvement of road by earth filling & construction of drain 800 m and protection work at Kadamtoli, ward no. 12

70.00

2

Improvement of road by W.B.M and Pre-mix surfacing & Road - 750 m construction of brick drain starting from Idgah Hall to N. Drain- 892 m Salmara Chapaguri P.W.D road at Gurunanak Nagar,W/No. 13

80.00

3

Modern Guest House for minorities

1 (one)

50.00

4

Construction of youth hostel for minority studens

1 (one)

50.00

T O T A L

250.00

173

9. YEAR WISE PHYSICAL AND FINANCIAL TARGETS : Table-26.2. Year wise physical and financial target . Scheme/ Year

1 st

2 nd

3 rd

4 th

Fin

Phy

Fin

Phy

Fin

Phy

Fin

Phy

20.00

30%

30.00

40%

10.00

15%

10.00

15%

Improvement of road at Gurunanak Nagar, Ward- 13

24.00

30%

32.00

40%

12.00

15%

12.00

15%

Guest House

15.00

30%

20.00

40%

7.50

15%

7.50

15%

Youth Hostel

15.00

30%

20.00

40%

7.50

15%

7.50

15%

T O T A L

74.00

Road & Drain at Kadamtoli, Ward- 12

102.00

37.00

37.00

10. PRIVATE INVESTMENT PARTICIPATION : No private sector investment in the project has been envisaged at present.

11. PROJECT LOCATION : The location of the roads and drains as proposed shall be in the minority concentrated area namely the Ward No. 12 and 13. The location of the Guest House and the Youth Hostel shall be suitably selected within the Municipal area in such a way that all the minority group can reap the benefit of these facilities.

12. LAND AVAILABILITY : Land for roads and drains have already been earmarked and is available. Land for the youth hostel and the guest house is also available within the town.

13. INTENDED BENEFICIARIES: The schemes are selected in a way to benefit all the minority community of the town. However these schemes will not only serve the local population but also a vast area along with the public commuting through these area to North Salmara Chapaguri Road as well as to the National Highway. The provision for roads and drains in Gurunanank Nagar area will also improve the communication to the parade ground and police reserve and also help in draining out the water from this locality.

174

14. DURATION OF THE PROJECT : The duration of the project will be 4 (four) years and every effort will be initiated to finish the project within the stipulated period.

15. IMPLEMENTING AGENCY : The implementing agency for the project will be the Bongaigaon Municipality under the Directorate of Municipal Administration, Government of Assam.

16. EXISTING AND PROPOSED MECHANISM FOR IMPLEMENTATION : The works can be basically implemented through departmentally under the supervision of the Executive Officer. Wherever necessary contractors and suppliers can also be involved.

17. MANAGEMENT/ OPERATION AND MAINTENANCE OF THE ASSETS CREATED The assets created can be handed over to the communities for maintenance. The hostels and guest houses can be managed by a committee who will provide the service at a nominal cost which can be in turn utilized for the maintenance of the assets created. However this may not be possible for the roads and drains and therefore these are to be maintained by the Municipality.

175

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR ABHAYAPURI TOWN COMMITTEE

PROJECT COST – Rs. 0.7862 CRORE 2007-08 To 2011-12

176

CONCEPT PAPER •

Sector

:

Urban Local Bodies.



Year

:

2008-2009 to 2010- 2011.



Schematic Amount Propose

:

0.7862 Crore.



Expected time of completion

:

2010-2011.



Total population (All Religion) as per 2001 census :

14673



Religious Minority population as follows

Muslim

-

3448

Christian

-

10

Sikh

-

25

Buddhist

-

1

Others

-

Nil.

:



Areas to be covered.

:

All wards



Whether land is available

:

Yes.



Implementation Agency

:

Office of the Chairperson, Abhayapuri Town Committee.

1. INTRODUCTION : Once upon a time Abhayapuri was the capital of Bijni Raj State and at present it is the head quarter of North Salmara Civil Sub-Division in the District of Bongaigaon and form the very beginning it is a cosmopolitan Town. At present there are 04 Nos. wards in Abhayapuri Town Committee area in which 2474 religious Minority peoples are living (as per 2001 census). Majority of this population are belongs to Mushlim community. A few remains as Christians and sikh. The pattern & coverage of religious wards are as follows :

Sl. No.

Ward No

Minority pocket area

1.

Ward No. 1

Rowmari Part (East)

2.

Ward No. 2

Rowmari Part (West)

3.

Ward No. 3

Bidyapara

4.

Ward No. 4

Nayapara & Tengamari area

It is needless to mention hence forth that the minority people of above area are facing problems for better road communication, proper drainage system, culverts and street light facility. No other scheme has been taken in above areas by which the above problems are solved. So there is an adequate need of the scheme like improvement of roads improvement of drainage, construction of culverts and installation of street light.

177

2. OBJECTIVE : The main objective of the scheme are specially to solve the problems of Town area which are facing by the public since long time back. There are – 1.

Improvement of road communication.

2.

Improvement of drainage system.

3.

Construction of culverts.

4.

Providing street light facility.

3. IMPLEMENTATION : The project will be implemented with a view to improve the socio-economic condition of the minority people of Town area. The project will be implemented in following manner Need based scheme shall be prioritised . Within the jurisdiction of Abhayapuri Town Committee area there are large number of Minority peoples (most of them are Muslim, only a few belongs to Christian & Sikh). The percentage of Minority people will be more than 80% in comparison to others. The Minority pocket areas are backward in many fields like Communication, Education, Basic civic facilities Critical gaps in physical and social infrastructures are also noticed. There is no adequate number of schemes in respect of infrastructure development like road connectivity, drainage system and street light. Hence keeping in view under above circumstances the following provisions has been considered in this MSD plan for Minorities for the year 2008-2009 to 2010-2011. 1.

2 Nos. Scheme for Pucca drain with RCC Slab total length 0.868 Km amounting Rs. 22,60,000.00

2.

5 Nos. Scheme for Pucca Road total length 2.072km amounting Rs. 37,64,000.00.

3.

7 Nos. 1.50 span and 5.50m length RCC slab culvert total length 0.0385km amounting Rs. 8,01,500.00

4.

Kutcha Road length 0.192km amounting Rs. 4,87,000.00

5.

70 Nos. Sodium vapour street light set amounting Rs. 5,49,500.00

The materials required for the work is proposed to be collected from local quarry. The labours required for the work are locally available. The road rollers and other machinery required for the works will be arranged by the contractor himself.

4. RATE : The estimate is prepared on the basis of schedule of Rates for Roads bridge & culverts for all Division under APWD for 2007-2008 and APWD (Building) 2004-2005.

178

5. PRE – PROJECT AND POST PROJECT STATUS : The Socio – economic condition of the Minority people of Abhayapuri Town area not yet improved. Their rood communication, health & hygienic condition are below standard. Moreover they are facing problems of electricity. So, a special attention will be given for upliftment with social Justice.

5.1. IMPACT OF PROJECT : 1. Pucca drain will minimize the water logging probelm. 2. Roads, R.C.C. slab culvert will provide improved connectivity. 3. Street light will smoothen easy and safe movement of public.

5.2. SOCIO-ECONOMIC GAIN OF THE PROJECT : The return expected for the project is in the form of Development of streets, drains and street lighting in the Minority area of Abhayapuri Town. There will be job opportunities for local unemployed persons of the area in different works of the project. Thus it will help in unemployment problem too and the Socio-economic condition of the area will be improved.

TABLE- 27. YEAR WISE PHYSICAL & FINANCIAL TARGET The whole Scheme is assumed to be completed within one year from the date of starting. However maximum time period may be required three year as follows – Name of Component 1.

2.

3.

2nd Year

First Year Physical

Financial

Construction

0.868

22,60,000.00

of Drain -

Km.

Construction

0.0385

Culvert.

Km.

Pucca Road.

Nil

3rd Year

Total

Physical

Financial

Physical

Financial

Nil

Nil

Nil

Nil

30,61,500.00

2.072

37,64,000.00

Nil

Nil

37,64.000.00

0.192

4,87,000.00

8,01,500.00

Nil

Km 4.

Kutcha Road Nil

5.

Nil

Nil

Nil

Street light.

10,36,500.00

Km 70 Nos

5,49,500.00

Total Rs.

78,62,000.00

(Rupees Seventy eight lacs Sixty two Thousand) only.

ABSTRACT OF COST Sl.No.

Name of Scheme

1.

Proposed construction of Pucca Drain & slab of Tengnamari Road (from Vice-Chairman house to Rajiv house) in Ward No.4 under Abhayapuri Town.

Rs. 13,10,000.00

2.

Proposed construction of Pucca Drain at Kabarsthan Road in Ward No.2 under Abhayapuri Town.

Rs.

3.

Proposed construction of GSB, WBM-II, WBM-III and premix

Rs. 12,23,000.00

179

Amount in Rs.

9,50,000.00

Sl.No.

Name of Scheme

Amount in Rs.

Carpeting Road from Muksed Ali’s residence to Biswambar Pathak residence in Ward No.4 under Abhayapuri Town. 4.

Proposed construction of 4 Nos 1.50m span R.C.C Slab Culvert at Tengnamari Road in Ward No.4 under Abhayapuri Town.

Rs.

4,58,000.00

5.

Proposed construction earth filling of Road at L.B.S Link Road in Ward No.4 under Abhayapuri Town.

Rs.

4,87,000.00

6.

Development of Black topping of Kabarsthan Road in Ward No.2 under Abhayapuri Town.

Rs.

6,00,000.00

7.

Proposed construction of 2 Nos. 1.50m span R.C.C Slab Culvert at Kabarsthan Road in Ward No.2 under Abhayapuri Town.

Rs.

2,29,000.00

8.

Proposed construction of Praneswar Choudhury Road (from M.A.K Azad Road to Taibur Rohman residence) by WBM-II, WBM-III and premix Carpeting with seal coat in Ward No.4 under Abhayapuri Town.

Rs.

3,86,000.00

9.

Proposed construction of 1.50m span R.C.C Slab Culvert at M.A.K Azad Link Road in Ward No. 4 under Abhayapuri Town.

Rs.

1,14,500.00

10.

Proposed construction of Kumud Narayan Road by GSB, WBMII, WBM-III and premix Carpeting with seal coat in Ward No.3 under Abhayapuri Town.

Rs.

6,89,000.00

11.

Proposed construction of Black topping Road from P.W.D Main Road to Goni Fakir house (Rowmari) Ward No.1 under Abhayapuri Town.

Rs.

8,66,000.00

12.

Estimate for supply of Sodium Vapour street light set for Ward No.4, Nayapara, Tengnamari area and Ward No.1 & 2 at Rowmari Minority Community dominated area.

Rs.

5,49,500.00

Total = (Rupees Seventy Eight Lacs Sixty two thousand) only

180

Rs. 78,62,000.00

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR

P.W.D (BUILDING)

PROJECT COST – Rs. 3.89 CRORE 2007-08 To 2011-12

181

CONCEPT PAPER 1. SOCIO-ECONOMIC FEASIBILITY WITH JUSTIFICATION: Bongaigaon District was created in the year 1989 bifurcating the erstwhile Kokrajhar and Goalpara District with its Headquarter at Bongaigaon Town. The total land area of the district is 2152 Sq.km. as per the record of 2001 census. As per 2001 census, the total population of the district is 904835 and out of this religious minority population is 367301. As per census data of 2001, the demographic profile of the district shows that 45.08 percent of the rural population belongs to minority community of which Muslims comprise 94 percent. The people from minority community of Sikhs, Buddhists and part of Christians reside mainly in urban area. Almost 80 percent projects of MSD plan of the district are proposed in rural minority dominated area. Hence to make benefited the other minority community also, it is proposed to construct separate community hall for Sikhs and Buddhists at Bongaigaon. Further in some minority dominated villages, there is no any public infrastructure where the people can get together. For such villages 8 Nos. of community hall or Rest House has been proposed for construction at different places of the district.

2. CRITICAL GAP: Except the religious centre like Gurudwara for Sikhs, Monastery for Buddhists and Church for Christians no other infrastructure for these religious minority communities where they can get together. Hence construction of separate Community hall for scattered minority community of Sikh and Buddhist at Bongaigaon Town is necessary. Further community hall or cultural centre is proposed in those minority villages where no any public institution is exists.

3. GOAL AND STRATEGIES: In the community hall, the people of the same community may sit together and chalk out plan for the community. Further the same may be used by the people of the community to perform any function including marriage ceremony and celebration of other rituals among the community.

4. OUTCOME AND BENEFIT: If properly used then the community hall may be used for various developmental purposes of the community. This may be a centre for learning among the people of the community.

5. MILESTONE: After completion of the project all the community halls will be assets for the respective community.

182

6. APPROXIMATE COST: The approximate cost of the total project is Rs.3.89 Crore (Rupees three crore and eighty nine lakhs ) only. Out of this total project cost Rs.0.886 crore, Rs.0.285 crore and 2.72 crore has been earmarked for construction of community hall for Sikhs, Buddhists and other minority communities respectively. The estimate has been prepared on the basis of the Schedule of Rates of the P.W.D. Building (Civil works) for all divisions under P.W.D. Assam for the year 2004-05. A premium of 20% on the SOR has been considered as per the circular of the Chief Engineer, P.W.D. (B) Assam vide no. SMC / 40 / 2007 / 20 Dtd. 31st July / 2008.

Table-28. Year wise physical and financial target: Physical

Time Schedule

Financial Target

1. Survey, Drawing/Design etc.

30 days

2. NIT, Issue of work order etc.

45 days

First Phase:: 30 % of Projected Amount.

3. Commencement of work

15 days

4. Time of Completion

12 Months

Second Phase:: 70 % of Projected Amount.

7. PRIVATE INVESTMENT PARTICIPATION (IF ANY): No private participation will be required.

8. PROJECT LOCATION: The proposed locations of the project will be at Gurudwara complex near Paglasthan for Sikh Community Hall, Dharmadut Bihar, Natunpara for Buddhist Community Hall respectively.

9. LAND AVAILABILITY: The Sikh Community of Bongaigaon has no other land except the Gurudwara complex. The committee of the Sikh community has proposes vertical extension of a part of the complex for providing the community hall. As per the comment of the committee, that part of the building has foundation of four storey building. However from the technical point, column of one side of the building is required strengthening. Hence the DPR has been prepared accordingly. The land for Community Halls for Buddhists is available in the respective project location. The land for community hall for other minority communities is also available at various places of the district.

10. INTENDED BENEFICIARIES: From the proposed project, all the people of each minority community will be benefited .

11. DURATION OF PROJECT : The project will be completed within two years in all respect.

183

13. IMPLEMENTING AGENCY: The implementing agency will be the PWD, Goalpara Building Division for the Civil Work and PWD, Kokrajhar Electrical Division for the Electrical Work under administrative control of Deputy Commissioner, Bongaigaon and the Chief Engineer, P.W.D.(B), Assam. The Executive Engineer, PWD, Goalpara Building Division and Executive Engineer, PWD, Kokrajhar Electrical Division will be Nodal Officer and the Engineer in charge of the project.

14. EXISTING AND PROPOSED MECHANISM FOR IMPLEMENTATION: For implementation of the project there are existing State Govt. line department in the district and the same will be responsible for implementing the project as per state government specifications.

15. MANAGEMENT/OPERATION AND MAINTENANCE OF ASSETS CREATED: The state Government and the administrative committee of the respective community hall will maintain the assets created from the revenue earned from the asset.

16. NAME OF SCHEMES :Construction of Community Hall for Sikh, Buddhist at Bongaigaon town and other 8 Nos. Assam type Community Hall / Rest House at various place in Bongaigaon District. ABSTRACT OF COST 1

Construction of Community Hall for Sikh

Rs 8,862,000.00

2

Construction of Community Hall for Buddhist

Rs 2,851,000.00

3

Construction of Assam type Community Hall for other Minority Communities at various places of District = 8 Nos.

Rs 27,200,000.00

Grand Total = Say

Rs 38,913,000.00 Rs.

3.89 Crore

(Rupees Three Crore Eighty nine lakh) only

16.1. SUMMARY REPORT FOR CONSTRUCTION OF COMMUNITY HALL FOR SIKH A. Cost for Strengthening of Ground floor and Construction of First floor …………………………………… Rs 14,19,833.00 B. Cost for construction of Second Floor ………………………… Rs 24,01,320.00 C. Cost for construction of third Floor(Assam Type)……… Rs 15,13,215.00 Total cost of civil work = Rs.53,34,368.00 Services :a) Add 9% for sanitary fittings ……………………………… Rs.4,80,093.12 b) Add 5% for Internal water Supply ………………………. Rs.2,66,718.84 c) Add 11% for Internal Electrification…………………….. Rs.5,86,780.48 d) Add 4% for External Power Supply …………………….. Rs.2,13,374.72 e) Add 1% for Concealed wiring …………………………….. Rs. 53,343.68

184

f) Add 0.5% for Fire fighting ……………………………. Rs. 26,671.84 Total = Rs.69,61,350.24 Add 20% Premium due to price escalation ……….. Rs.13,92,270.05 Total = Rs.83,53,620.29 Add 2% Contingency ………………………… Rs. 1,67,072.41 Total = Rs. 85,20,692.69 Add 4% VAT ………………………………. Rs. 3,40,827.71 Grand Total = Rs. 88,62,000.00 16.2. SUMMARY REPORT FOR CONSTRUCTION OF COMMUNITY HALL FOR BUDDHIST A. Cost for R.C.C Ground floor …………………………………… Rs 20,36,089.88 Total cost of civil work = Rs 20,36,089.88 Services :a) Add 5% for Internal water Supply& sanitary fittings …. .. …….. Rs1,01,804.49 b) Add 5% for Internal Electrification ……………………………… Rs1,01,804.49 Total = Rs. 22, 39,698.87 Add 20% Premium due to price escalation ………..

Rs. 447939.77 Rs.26,87,638.64 Add 2% Contingency ………………………… Rs. 53,752.77 Total = Rs. 2741391.41 Add 4% VAT ………………………………. Rs. 109655.66 Grand Total = Rs.28, 51,000.00 16.3. CONSTRUCTION OF ASSAM TYPE COMMUNITY HALL FOR OTHER MINORITY COMMUNITIES AT VARIOUS PLACES OF BONGAIGAON DISTRICT. Total =

A B S T R A C T

O F

C O S T

1 Construction of Community Hall 2 Construction of Chain link fencing with Barbed wire (L.S).

Rs 2,941,753.00 Rs 100,000.00

3 Providing R.C.C. water staging with Deep Tube Well / Ring well (L.S).

Rs 145,000.00

4 Providing Double Leaf Iron Gate (L.S.)

Rs

18,500.00

Total=

Rs 3,205,253.00

Add 2% Contingency Total= Add VAT 4% Grand Total =

Rs 64,105.06 Rs 3,269,358.06 Rs 130,774.32 Rs 3,400,132.38

Cost per unit of Community Hall=

Rs 3,400,000.00

Cost for eight nos. Community Hall = (Rupees Two Crore Seventy two lakh) only

185

Rs 2,72,00,000.00

16.3.1. SUMMARY REPORT FOR CONSTRUCTION OF ASSAM TYPE COMMUNITY HALL FOR OTHER COMMUNITY AT BONGAIGAON AT VARIOUS PLACES IN BONGAIGAON DISTRICT. Assam Type Building – Specification – ‘A’ (Functional/ Residential) 1.

Plinth Foundation

:

75mm thick prop 1:3:6

2.

Plinth Beam

:

As per design. (R.C.C.)

3.

Plinth Wall :

225mm thick 1st class brick in prop 1:5 and 15 mm

a) Outer Wall

thick cement plaster in prop 1:6 on exposed faces with neat cement slurry finish. 4.

b) Inner Wall

:

112mm thick 1st class brick in cement mortar prop 1:5.

D.P.C.

:

Providing and laying 25mm thick damp proof course with cement concrete in prop 1:1.5:3 with graded stone aggregate of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer including curing etc. complete as directed.

5.

Post

:

130mm x 130mm R.C.C. as per design.

6.

Foundation

:

With R.C.C. foundation as per design Depth of foundation 1.0 m from original ground level.

7.

Floor

:

65mm thick cement concrete flooring in panels with 50mm under layer of cement concrete in prop. 1;3:6 and 15mm C.C. topping in prop. 1:1:2 over one flat brick soiling 150mm thick stone soiling.

8.

Wall

:

112mm thick 1st class brick nogged wall in cement mortar wall in prop 1:5, from plinth upto post plate with cement plaster 15mm thick on outside face, in prop 1:5 including distempering over plaster of paris or wall putty. Outer wall will be finished cement wash/weather coat with cement primer.

9.

Window/Clerestory Window:

As per Architectural design.

10.

Doors

:

As per Architectural design.

11.

Roofing

:

0.63 I.S. thickness (in mm) C.I. roofings over undressed wooden/timber truss.

12.

Ceiling

:

A.C. Board/ Gypsum Board with painting.

13.

Miscellaneous

:

C.C. Apron with drain, cupboard chowkhats, door and window leaf to be painted with one coat of primer and two coats of enamel paints of approved shades.

14.

Height of Plinth

:

600-750 mm for all buildings.

15.

Height of Building

:

3050-3600 mm.

186

Plinth area = 270.96 m2 @ Rs. 5990.00/m2 ………………

Rs. 16,23,050.00 C.O Rs.16,23,050.00 B.F.

Rs1,623,050.00

1

Extra for Plinth Height (0.15/0.30x270.96)

@ Rs.150.00 / Sqm.

Rs 20,322.00

2

Extra for building Height (0.90/0.30x270.96)

@ Rs.90.00 / Sqm

Rs 73,159.20

3 White ant treatment

@ Rs.165.00 / Sq.m. of plinth area

Rs 44,708.40

4 Steel Roof Truss

@Rs.400.00 / Sqm.

Rs1,08,384.00

5 Extra for stage at hall room

L.S.

Rs 30,000.00

6 Plastic paint

@2% of Cost of Civil Works

Rs 32,461.00

7 Weather coats for external finish

@ 2% of Cost of Civil Work

Rs 32,461.00

8 Normal preparation of site

@1% of the cost of Civil Works (in case of R.C.C.buildings, the cost of ground floor only) @9% (Nine P.C.) of the cost of Civil Works

Rs 16,230.50

9 Sanitary installation

Rs 1,46,074.50

10 Internal water supply

@5% (Five P.C.) of the cost of Civil Works

Rs 81,152.50

11 Internal Electrification

@11% (Eleven percent) of the cost of Civil Works

Rs 178,535.50

12 External Electrification

@4% (Four percent) of the cost of Civil Works

Rs 64,922.00

Total=

Rs 2,451,460.60 Rs 490,292.12

Total= Say

Rs 2,941,752.72 Rs 29,41,753.00

Add 20% Premium on SOR 2004-05 as per C.E(B).'s Circular for escalation of price

187

GOVT. OF ASSAM

“MULTI-SECTORAL DEVELOPMENT PLAN FOR MINORITY” OF BONGAIGAON DISTRICT

FOR TOTAL LITERACY CAMPAIGN

PROJECT COST – Rs. 1.50 CRORE 2007-08 To 2011-12

188

CONCEPT PAPER 1. INTRODUCTION : Based on Omio Kr. Das Institute for social changes and development, Guwahati, Assam project proposal has been prepared under "Multi Sectoral Development Plan" for Minorities. Literacy is an essential tool and a pre-conditions for activating and promoting people's participations in the success of a true-democracy in general and well being of the mass. It is a matter of great concern that all individuals of the minorities areas are yet to be covered by literacy programmes. This is due to various factors inherent in their society as well as state. The literacy scenario in minorities area of the district is not encouraging. As per 2001 census, the member of illiterates in Bongaigaon minorities area of age 9 to 45 yrs. total 60,000male 25200 and female 34800 out of 239850 population. To cover the all minorities area in each Panchayat of minorities area by literacy campaign and cover the School drop out, to impart literacy to semi literacy for achieving literacy levels by NLM. TLC’s aim is to provide facilities to functional Literacy, stabilization, reinforcement and upgradation of learners. PLP is a component of continuing education intended to consolidate basic literacy skills and to make self motivated, effective living of life. Emphasis will be given for development of skill. Programme will be integrated in PLP continuing education, vocational and skill development training. Programme for neo literates women empowerment training, job oriented skill with reading skills, formation of SHG groups in uncovered areas and impart training to various self help groups. After completion of PLP, the continuing education programme will be started in the minorities areas in the district. Continuing education centre will provide permanent resources to the neo-literates for skill development. If handloom training centre and multisectoral centre is established in each Block for neo-literates, V.I. and continuing centre will also be established in every panchayat.

2. STATUS OF FEMALE LITERACY : Factors responsible for poor female literacy rate. Historically, a variety factors have been found to be responsible for poor female literacy rate viz. •

Gender based inequality.



Social discrimination and economic exploitation.



Occupation of Girl child in domestic works.



Low enrolment of girl in school.

189

Strategies adopted by the Government for improving the female Literacy and empowerment of women in minorities areas. 1.

Zilla Saksharata Samitee for imparting functional Literacy.

2.

Non formal education and

3.

Primary Education.

3. AIMS AND OBJECTIVES : The aim of a literacy campaign is to identify who have never joined in formal system of education or who have dropped out. The targeted population for this is 9-35 years. The time frame is 6th month. As per 2001 census, the number of illiterates in the age group of 9-35 is above 60000. The objectives of literacy campaign are :1. To create awareness for a better life. 2. To enable the people to participate in the economic development of the society. 3. To enable people to take advantage of the various welfare scheme of the Govt. 4. To create awareness among the people of their rights as a citizen. 5. Bring changes for modernistic and scientific approach to life. 6. To promote the spirit of cultural unity. On successful completion of the Literacy Programme, it is expected that about 90% of the total population in the age group of 9-35 years will be literate.

4. AREA OF OPERATION : Literacy campaign will be operated within the administrative jurisdiction of the entire Bongaigaon district. At present the district has 5 nos. Dev. Block, 35 no minority concentrated Gaon Panchayats. Sl. Name of the Dev. Block No. 1 Srijangram

2

Name of minorities consented GP 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13)

Tapattari Dev. Block

190

Kokila Numburpara Chakla Balurchar Matughala Golapara Bangla Para Japeya Kirtanpara Kacharipeti Ambari Baregarh Piradhara Lengtisingha Merechar Nay Sotrabaghekhaiti Sontuspur Dumerguri

3

Boitamari Dev. Block

4

Dangtal Dev. Block

14) Rangapani 15) Borjana 16) Kalbari 17) Malegarh 18) Pachaniya Khoregaon 19) South Boitamari 20) Kabaitari 21) Jogighopa 22) Balapara 23) Oudubi 24) Pub Majer Alga 25) Paschim Majer Alga 26) Khagarpur 27) Dangtal 28) New Bongaigaon 29) Dhaligaon 30) Bachari Chalabila 31) Bhandara 32) Goraimari 33) Hapachara 34) Alukhunda 35) Patiladaha

5. WHY LITERACY IN MINORITIES CONCENTRATED AREA : The education scenario of Bongaigaon district had never been very bright. Bongaigaon has literacy rate of 59.33% in comparison to 63.25% of Assam. Lack of infrastructure, socioeconomic backwardness, migration from neighbouring countries are the reasons of backwardness. Religious community wise literacy rates in the district reveals that literacy rate for Hindus is not only the highest among the religious groups of the district but also significantly higher than the district average. The literacy rate of the Muslims is much below, only 40.17%. Communication is a major problem in Char areas. Manas and Aie river remains inaccessible during the rainy season. People in general are very poor and lack of proper Medicare facilities brings ill health, malnutrition etc. All this shows education to the back of their list of priorities. The immigrants have come in masses to settle in the area, who are practically illiterate with no concept of planned families. The growth rate of population has escalated. Moreover despite the setting up of a number of industries, most of the people are agriculturists. This has necessitated the starting the literacy programme as the primary agenda for the overall development of minorities people.

191

6. GOAL AND STRATEGIES : 1. To create on effective learning structure for illiterates and neoliterates to strengthen their existing skills 2. Make learning relevant to actual life situations by providing technical and vocational skills.

3. Encourage creative thinking through participative group activities 4. Active participation in such a way so as to lead community ownership of the scheme. 5. Active linkages with other development departments at the grassroot level. 6. Make the programme sustainable by making it need based and demand oriented. 7. The problems of illiteracy to be take in a holistic manner. 8. Total Literacy and post literacy phases to actually constitute two operation stages in the learning continues. 9. Progress of Literacy efforts to be made goal directed. 10. Literacy campaigns to continue running in areas with large pools of residual illiteracy 11. Active participation of Panchayati Raj in literacy programme in keeping with the constitutional responsibilities.

7. SIGNIFICANT IMPACTS OF THE PROJECT : a. Individuals and minorities communities have been sensitized

into socio Economic

development deep and abiding consciousness about ecological issues b. At the individual level, self esteem and self confidence have increased Manifold. c. Neo-literates shall acquire a sense of Self belief and desire to increase awareness levels, to know more about the outside world and to escape from the shackles of entrenched beliefs, antiquated ideas and both social and religions dogmas.

8. SUMMARY : Training Literacy Training

(TLC & PLC)

= 62%

SHG Training

= 3%

Skilled Development Training

= 15%

Community Development

= 5%

Environment building

= 5%

Monitoring & Supervision

=

5%

Evaluation

=

3%

Contingencies

=

2%

---------------------= 100%

192

FINANCIAL ESTIMATE 1st year Literacy training 1.

Resource persons training (Residential) 40 persons x 4 days x 175 (Food + Travel + Management Expend + Note Book + Register etc)

Rs. 28,000/-

2. Gram Panchayat level volunteers Instructor Training 6000 VIS x 3 days x Rs. 100 (Food + Travel + Management Expend + Note Book + Register etc)

Rs.18,00,000/-

3. Training Materials 6050 person (VI+ RP) x Rs 50 (IPCL Hand Book, IPCL 1,2,3 Nos. Daily attendance, Register, General Record writing, Register)

Rs.3,02,500/-

4. Learning Materials IPCL – I IPCL –II IPCL –III

=60000 x Rs. 18/=50000x Rs. 19/=40000x Rs. 19/-

Rs. 10,80,000/Rs. 9,50,000/Rs. 7,60,000/-

5. Additional Learning Materials 60000 person x Rs. 30/(Slats, wooden pencil, eraser, Earthen pencil for literate)

Rs.18,00,000/-------------------------------

Total Rs.6720500/ENVIRONMENT BUILDING 1. Poster = 5000 Nos. (Two verities) 5000 x 2 x @ Rs. 5/2. Documentation (photography & Video etc) 3. Leaflet/Folders 4. Banner/paper stickers 5. Literacy festival Jatra

Rs. 50000/Rs. 50000/Rs. 25000/Rs. 50000/Rs.125000/-

-----------------------------Total Rs. 300000/SELF HELP GROUP TRAINING (Existing self Help Group (500 Nos) and formation of new SHG) Training (Account Keeping, Register maintain, Group management & General Record writing) 5 days training of a Minorities Gram Panchayat level. Per day Expend 10000 x 40 minorities Panchayat (Food + Management + Resource person honorarium

Rs. 4,00,000/-

Training Materials Daily attendance Register, Exercise Book, pen Training guide Book Per Training) Rs. 1250 x 40 workshop Rs. 50,000/----------------------------

Total Rs. 4,50,000/Total 1 year cost = Rs. 74,70,500/(Rupees Seventy Four lakhs seventy thousand five hundred only). st

193

2nd year POST LITERACY TRAINING 1.

Resource person training (Residential) 30 person x 4 day x Rs. 150/(Food + Travel + Management Expend + Note Book + Register etc)

2.

Gram Panchayat level volunteers Instructor Training. (1600 (VIS) x 3 days x Rs. 100/-

3.

Rs.4,80,000/-

Training Materials 1630 (VIS + RP) x Rs. 50/(IPCL Hand Book, IPCL 1 no. daily attendance, Register, General Record Writing, Register etc)

4. 5.

Rs. 18,000/-

Rs. 81,500/-

Learning Materials IPCL (one) – 40000 x @ Rs. 20/Additional Learning materials

Rs. 8,00,000/-

40000 NL x @ Rs. 30/(Exercise Book, wooden Pencil, eraser for neoliterate)

Rs. 12,00,000/-

-------------------------Total Rs.25,79,500/ENVIRONMENT BUILDING Introduction of Jatra Literacy & SHG Festival Jatra Kalajatra (Street Drama & Song all Minorities Panchayat) Documentation (Photography & VEDEO etc)

Rs. 4,00,000/Rs. 50,000/---------------------------

Total Rs.4,50,000/SKILL DEVELOPMENT TRAINING VOCATIONAL TRAINING Gram Panchayat level (with SHG) Training (7 day to 10 days item wise) Per training Camp Expend Rs. 5000 x 8 days x 40 Minorities Panchayat (Food + Management + Resource person honorarium)

Rs.16,00,000/-

Training Materials Difference Materials for difference Training Camp (8 days) Per camp Expend Rs. 16250/- x 40 minorities Panchayat)

Rs. 6,50,000/-

Total

-------------------------Rs.22,50,000/-

COMMUNITY CENTRE CUM LIBRARY Per Minorities GP (one Library) Per Library Rs. 18750/- x 40 Minorities GP

Rs.7,50,000/Monitoring & Supervision Rs.7,50,000/Evaluation Rs.4,50,000/Contingencies Rs.3,00,000/-------------------------Rs.75,29,500/2nd year Total cost (Total Rupees Seventy five lakhs twenty nine thousand five hundred only) Total Project Cost = 1st year Rs.74,70,500/- + 2nd year Rs.75,29,500/- = Rs.1,50,00,000/(Total Rupees One Crore fifty lakhs only )

194

CHAPTER-V MONITORING AND EXTERNAL EVALUATION : Experts guidance and opinion for making the schemes fully viable and visible prepared under Multi Sectoral Development Plan (2007-08 to 2011-12) for minorities of the district, the following institutions will be used: 1. Indian Institute of Technology, Guwahati. 2. National Institute of Fashion Technology. 3. National Institute Rural Development, Guwahati. 4. State Institute of Rural Development, Guwahati. 5. Assam Administrative Staff College, Guwahati. 6. Indian Institute of Entrepreneurship, Guwahati. 7. Weavers Training Center. 8. National Centre for Jute Diversification.

195