Objectives. IEC 60601-1:2005. 10/22/2012. 2. • Understand 2nd Edition to 3rd Edition Transition Dates. • Major Changes from IEC 60601-1, 2nd Edition to IEC.
IEC 60601-1 3rd Edition

Presenter Daniel Ruth: TUV Rheinland NA

Objectives

• Understand 2nd Edition to 3rd Edition Transition Dates • Major Changes from IEC 60601-1, 2nd Edition to IEC 60601-1, 3rd Edition • Risk Management • IEC/UL 61010-1, 3rd Edition and Ramifications

2

10/22/2012

IEC 60601-1:2005

IEC 60601-1:2005  IEC 60601-1, Edition 3  Published December 2005  9 years to develop  International consensus standard - Adopted or used to develop national standards  Represents new state of the art for safety requirements - Compliance can be presumed to verify acceptable risk unless there’s objective evidence to the contrary

- Included in Official Journal (OJ) http://ec.europa.eu/enterprise/policies/europeanstandards/documents/harmonised-standards-legislation/listreferences/medical-devices/index_en.htm

3

10/22/2012

IEC 60601-1:2005

IEC 60601-1:2005  United States - ANSI/AAMI ES 60601-1:2005, which is IEC 60601-1:2005 with US deviations - The FDA now officially recognizes ANSI/AAMI ES 60601-1:2005 in the Federal Register

- FDA will accept declarations of conformity, in support of premarket submissions to IEC 60601, 2nd Edition until June 30, 2013 - Existing Equipment is “grandfathered” - After this transitional period, new declarations of conformity to IEC 60601-1, Ed. 2 will not be accepted - OSHA still using 2nd Ed. for NRTL

4

10/22/2012

IEC 60601-1:2005

IEC 60601-1:2005 Canada - CSA published CSA‐C22.2 NO. 60601‐1:08, which is IEC 60601-1:2005 with Canadian deviations - June 1, 2012 cessation date when 2nd edition no longer valid - Existing Equipment is “grandfathered” - Several exemptions for MEE with particular standards (IEC 60601-2-xx).

5

10/22/2012

IEC 60601-1:2005

IEC 60601-1:2005 Europe - All products must meet current state of the art - EN 60601-1, which is IEC 60601-1:2005 with European deviations - The Date of Withdrawal in the OJ is June 1, 2012 - Existing Equipment is NOT “grandfathered” - Several exemptions for MEE with particular standards (IEC 60601-2-xx).

6

10/22/2012

IEC 60601-1:2005

IEC 60601-1:2005 Structure  General Standard IEC 60601-1 Collateral (-1-xx) - Requirements for specific technologies and/or hazards

General Standard 60601-1

Collateral Standards 60601-1-1 Systems (Obsolete)

60601-1-2 EMC

60601-1-4 PESS (Obsolete)

60601-1-6 Usability

60601-1-8 Alarms

60601-1-11 Home Healthcare

Particular Standards Requirements for specific equipment types 60601-2-1 Medical Electron Accelerators

7

10/22/2012

60601-2-2 High Frequency Surgical Equipment

IEC 60601-1:2005

60601-52 Electrically Operated Hospital Beds

ISO 80601-2-12 Critical Care Ventilators

...Many More...

7

Major Difference 2nd to 3rd Ed Clause 4.2 - Risk Management Process Required (ISO 14971) 3rd Ed. Still a Test Standard with Pass/Fail Criteria - But RM allows flexibility within a hazard-based framework

8

10/22/2012

IEC 60601-1:2005

Major Difference 2nd to 3rd Ed

Clause 4.2 - Risk Management Process Required (ISO 14971) 3rd Ed. Still a Test Standard with Pass/Fail Criteria - But RM allows flexibility within a hazard-based framework

9

10/22/2012

IEC 60601-1:2005

Risk Management affects which tests are performed

10

10/22/2012

IEC 60601-1:2005

Risk Management In 3rd Edition

To understand the 3rd Edition, we must understand ISO 14971

11

10/22/2012

IEC 60601-1:2005

Risk Management In 3rd Edition To understand the 3rd Edition, we must understand ISO 14971 - Total Life Cycle Approach - Does Not Specify Acceptable Risk

- Acceptability is determined by the manufacturer for each device using the risk management policy - Provide Framework for Management of Risk

- Defines Management Responsibilities - Intended For Integration With Quality System

12

10/22/2012

IEC 60601-1:2005

Risk Management

 Hazard: “potential source of harm”

 Risk = Probability * Severity  Harm: “physical injury or damage to health or property”

 HAZARD

13

10/22/2012

IEC 60601-1:2005

RISK

HARM

Frequent

Intolerable ALARP

Improbable

Probability

Risk Management (see Fig E.1)

Broadly Acceptable

Negligible

Severity

Catastrophic

ALARP = As Low As Reasonably Practicable (Further Investigation Needed) 14

10/22/2012

IEC 60601-1:2005

RM Summary Risk Assessment Process Determines How a Product is Evaluated to 3rd Edition - A risk management process defined in ISO 14971 is necessary to demonstrate compliance - Though there are baseline requirements, RM can be used to tailor the requirements in the standard to the device

- Risk management process may add requirements/tests or may eliminate or modify requirements/tests

15

10/22/2012

IEC 60601-1:2005

IEC 60601-1 3rd Edition  EN 61010-1:2010 has a mandatory compliance date of October 1st 2013 in the EU  Aligns standard to match other modern standards such as IEC 60950-1 and IEC 60601-1. • Clarifications and corrections • Definitions (Reinforced, Dynamic to Impact test etc.) • Test Procedures and Limits(Bonding Impedance, Corner drop/Face Drop renamed) • Updated standard references • Clearance and Creepage is simplified (including PCB and through insulation) • Moving parts now have defined requirements on speed and gaps and risks must be assessed • Loading requirements on castors and handles and wall mounts • Now BOP defined similar to IEC 60601-1.  Separates terminal and probes into their own Part 2’s  New limits and contact definitions of temperature limits to touchable parts  Hazards defined for unattended controls.  Ergonomic requirements implemented.  Finally, Risk Management (ISO 14971) is now required on hazards not fully addressed elsewhere in the standards

16

10/22/2012

IEC 60601-1:2005

The End

Thank you for Attending!

17

10/22/2012

IEC 60601-1:2005